County of Beaufort Sealed Solicitation

Title: HVAC and Control Energy Management System Replacement for Detention Center, Beaufort County

Deadline: 3/10/2021 3:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: IFB 031021

Description:

Beaufort County is requesting bids for the replacement of the existing rooftop air handling units located at the Beaufort County Detention Center and the project also includes replacing the buildings HVAC control and energy management system for connection to the County’s central control and monitoring system.


Pre-Bid Meeting Date: 2/23/2021 2:00 PM

Pre-Bid Meeting Details: This will be a virtual meeting held via WebEx. Email dthomas@bcgov.net to reserve your spot.


Documents:

Documents as of 2/10/2021
Login to view documents
Login to view documents
Login to view documents
Addition 1

Posted: 3/10/2021

Type of Addition: In Review

Addition 2

Posted: 3/11/2021

Type of Addition: Preliminary Bid Tab

Overview: Please see attached

Documents:

Addition 3

Posted: 6/7/2021

Type of Addition: Award Information

Overview: this contract was awarded to Triad Mechanical Construction

Amount: $1,548,125.00

Documents:

Question 1

Posted: 2/22/2021

Question: What is the process to participate in the virtual mandatory pre bid meeting scheduled for 2/23/21 at 2 PM?

Response: Send an email to dthomas@bcgov.net requesting an invite to the meeting. You will be put on the list and sent the invite a day or two before the meeting.

Question 2

Posted: 2/25/2021

Question: Will other manufacturers of equipment be acceptable or do the units to be installed need to be manufactured by Trane specifically?

Response: Trane and AAON

Question 3

Posted: 2/26/2021

Question: On Sheet 32 of the IFB " Equipment" the first line states "List Enclosures: Attach list of all subcontractors, showing license numbers and licensing authority as applicable," Are we to submit this on our own sheet? I do not see a form in the IFB with for this list.

Response: Yes, submit on your own sheet

Question 4

Posted: 2/26/2021

Question: On sheet 33 of the IFB "Equipment" it states to list all the equipment that we will furnish and install. Will this be a requirement for this IFB and if so would you release a list of what will need to be listed? RTU's, Disconnects, etc.

Response: The contractor shall furnish and install all equipment shown on the project drawings and specifications to be replaced and as required to make the systems operational. This includes but is not limited to RTUs, disconnects, equipment curbs, and gas piping. There will be no owner furnished, contractor installed equipment.

Posted: 3/10/2021

Type of Addition: In Review

Posted: 3/11/2021

Type of Addition: Preliminary Bid Tab

Overview: Please see attached

Documents:

Posted: 6/7/2021

Type of Addition: Award Information

Overview: this contract was awarded to Triad Mechanical Construction

Amount: $1,548,125.00

Documents:

Posted: 2/22/2021

Question: What is the process to participate in the virtual mandatory pre bid meeting scheduled for 2/23/21 at 2 PM?

Response: Send an email to dthomas@bcgov.net requesting an invite to the meeting. You will be put on the list and sent the invite a day or two before the meeting.

Posted: 2/25/2021

Question: Will other manufacturers of equipment be acceptable or do the units to be installed need to be manufactured by Trane specifically?

Response: Trane and AAON

Posted: 2/26/2021

Question: On Sheet 32 of the IFB " Equipment" the first line states "List Enclosures: Attach list of all subcontractors, showing license numbers and licensing authority as applicable," Are we to submit this on our own sheet? I do not see a form in the IFB with for this list.

Response: Yes, submit on your own sheet

Posted: 2/26/2021

Question: On sheet 33 of the IFB "Equipment" it states to list all the equipment that we will furnish and install. Will this be a requirement for this IFB and if so would you release a list of what will need to be listed? RTU's, Disconnects, etc.

Response: The contractor shall furnish and install all equipment shown on the project drawings and specifications to be replaced and as required to make the systems operational. This includes but is not limited to RTUs, disconnects, equipment curbs, and gas piping. There will be no owner furnished, contractor installed equipment.