City of Greer Sealed Solicitation
Title: The City of Greer's Downtown Bollard Project
Deadline: 8/30/2021 11:00 AM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: 2022-003
Description: The purpose of this bid request is to obtain from qualified interested offerors a sealed bid, for The City of Greer’s Downtown Bollard Project.
Documents:
Documents as of 8/13/2021 |
---|
Login to view documents |
Addition 1
Posted: 8/30/2021
Type of Addition: In Review
Addition 2
Posted: 10/7/2021
Type of Addition: Award Information
Overview: Bollard Solutions
Amount: $29,550.00
Question 1
Posted: 8/16/2021
Question: Nothing specified. Is there a minimum crash rating requirement for these bollards? I.e. Pickup truck rated at 35 mph?
Response: We are not requiring a particular crash rating as long as the material and diameter that are stated in the bid requirements are followed.
Question 2
Posted: 8/17/2021
Question: Are civil drawings from a licensed engineer part of the scope?
Response: We have already responded to this question. Please see the public solicitation.
Question 3
Posted: 8/20/2021
Question: Is 304 stainless steel acceptable or does it need to be 316? Are stamped civil engineering drawings part of our bid?
Response: 316 stainless steel will be required. Stamped engineered drawings are not necessary as part of the actual submittal, but should be taken into account in your pricing since they will be required as part of the permitting process before work will be allowed to begin.
Posted: 8/30/2021
Type of Addition: In Review
Posted: 10/7/2021
Type of Addition: Award Information
Overview: Bollard Solutions
Amount: $29,550.00
Posted: 8/16/2021
Question: Nothing specified. Is there a minimum crash rating requirement for these bollards? I.e. Pickup truck rated at 35 mph?
Response: We are not requiring a particular crash rating as long as the material and diameter that are stated in the bid requirements are followed.
Posted: 8/17/2021
Question: Are civil drawings from a licensed engineer part of the scope?
Response: We have already responded to this question. Please see the public solicitation.
Posted: 8/20/2021
Question: Is 304 stainless steel acceptable or does it need to be 316? Are stamped civil engineering drawings part of our bid?
Response: 316 stainless steel will be required. Stamped engineered drawings are not necessary as part of the actual submittal, but should be taken into account in your pricing since they will be required as part of the permitting process before work will be allowed to begin.