Lockhart ISD Sealed Solicitation
Title: LISD RFP 25-002 Network Infrastructure Equipment for Borchert Loop Elementary
Deadline: 2/20/2025 2:30 PM (UTC-06:00) Central Time (US & Canada)
Status: Deadline Expired
Solicitation Number: 25-002
Description: The Lockhart Independent School District is requesting proposals for Network Infrastructure Equipment with Installation.
Documents:
Documents as of 1/30/2025 |
---|
Login to view documents |
Login to view documents |
Login to view documents |
Addition 1
Posted: 2/7/2025
Type of Addition: Addendum 1
Overview: Lockhart ISD has released addendum 1 for RFP 25-002 for Network Infrastructure Equipment for Borchert Loop Elementary
Deadline: 2/20/2025 2:30 PM
Solicitation #: 25-002
Documents:
Addition 2
Posted: 2/14/2025
Type of Addition: Addendum 2
Overview: Lockhart ISD has released addendum 2 for LISD RFP 25-002 Network Infrastructure Equipment for Borchert Loop Elementary
Deadline: 2/20/2025 2:30 PM
Solicitation #: 25-002
Documents:
Question 1
Posted: 2/10/2025
Question: 1. How does this school connect to the rest of the District's network? a. Is there a direct internet connection? Or, is the school's traffic backhauled to the districts central location? 2. Line item 9 of the MS Excel spreadsheet, if we cannot provide a switch with 1050W power supply, can we replace the switch with (2) 740W versions to support PoE over the full 48 ports required? 3. What is the expected speed and bandwidth of the Internet Service Provider? 4. Line item 4 of the MS Excel spreadsheet, is 50GB required, or can we propose 25GB throughout the design?
Response: This will be answered in Addendum 2.
Question 2
Posted: 2/11/2025
Question: For the Access Point subscriptions, is the District looking for a prepay subscription or an annual billing subscription?
Response: This will be answered in Addendum 2.
Question 3
Posted: 2/12/2025
Question: Can you provide us with the square footage of Borchert Loop Elementary? We have the floor plan which is perfect, but it doesn't have any measurements. The floor plan should have a scale, which is all we need. i.e. 1/32" = 1'
Response: This will be answered in Addendum 2.
Question 4
Posted: 2/12/2025
Question: The Excel spreadsheet listed a total of 91 = (18X5) + 1 WAP. Where should the R7J28A single WAP be installed on the map? ? 18 S3J36A HPE Aruba Networking AP-635 (US) Tri Radio 2x2 Wi-Fi 6E Internal Antennas 5-pack Campus Access Point 1 R7J28A HPE Aruba Networking AP-635 (US) Tri-radio 2x2 802.11ax Wi-Fi 6E Internal Antennas Campus AP If I counted correctly, the map in the Addendum has 67 WAP (+, green cross). I counted 31 on the top right and 36 on the bottom left. Are you saving the remaining 24 WAPs as extras for future replacement? If not, where should these 24 WAPs be placed?
Response: This will be answered in Addendum 2.
Question 5
Posted: 2/13/2025
Question: Are the cable trays/pathways covered under the electrical RFP? Is the Backbone/Fiber covered under the electrical RFP? Is the installation of the Racks/Cabinets covered in the electrical RFP? What is the height of the ceilings in the main hallways? Are Union Techs required? Do you need a project manager for the networking installation? Do you have a scissor lift available onsite? In the Excel spreadsheet, there are 17 switches, but did not specify the number of racks. What kind of rack do you need? Will this new campus have the infrastructure (electrical power, racks, cabling) in place to support the networking equipment (switches, WAPs)?
Response: This will be answered in Addendum 2.
Posted: 2/7/2025
Type of Addition: Addendum 1
Overview: Lockhart ISD has released addendum 1 for RFP 25-002 for Network Infrastructure Equipment for Borchert Loop Elementary
Deadline: 2/20/2025 2:30 PM
Solicitation #: 25-002
Documents:
Posted: 2/14/2025
Type of Addition: Addendum 2
Overview: Lockhart ISD has released addendum 2 for LISD RFP 25-002 Network Infrastructure Equipment for Borchert Loop Elementary
Deadline: 2/20/2025 2:30 PM
Solicitation #: 25-002
Documents:
Posted: 2/10/2025
Question: 1. How does this school connect to the rest of the District's network? a. Is there a direct internet connection? Or, is the school's traffic backhauled to the districts central location? 2. Line item 9 of the MS Excel spreadsheet, if we cannot provide a switch with 1050W power supply, can we replace the switch with (2) 740W versions to support PoE over the full 48 ports required? 3. What is the expected speed and bandwidth of the Internet Service Provider? 4. Line item 4 of the MS Excel spreadsheet, is 50GB required, or can we propose 25GB throughout the design?
Response: This will be answered in Addendum 2.
Posted: 2/11/2025
Question: For the Access Point subscriptions, is the District looking for a prepay subscription or an annual billing subscription?
Response: This will be answered in Addendum 2.
Posted: 2/12/2025
Question: Can you provide us with the square footage of Borchert Loop Elementary? We have the floor plan which is perfect, but it doesn't have any measurements. The floor plan should have a scale, which is all we need. i.e. 1/32" = 1'
Response: This will be answered in Addendum 2.
Posted: 2/12/2025
Question: The Excel spreadsheet listed a total of 91 = (18X5) + 1 WAP. Where should the R7J28A single WAP be installed on the map? ? 18 S3J36A HPE Aruba Networking AP-635 (US) Tri Radio 2x2 Wi-Fi 6E Internal Antennas 5-pack Campus Access Point 1 R7J28A HPE Aruba Networking AP-635 (US) Tri-radio 2x2 802.11ax Wi-Fi 6E Internal Antennas Campus AP If I counted correctly, the map in the Addendum has 67 WAP (+, green cross). I counted 31 on the top right and 36 on the bottom left. Are you saving the remaining 24 WAPs as extras for future replacement? If not, where should these 24 WAPs be placed?
Response: This will be answered in Addendum 2.
Posted: 2/13/2025
Question: Are the cable trays/pathways covered under the electrical RFP? Is the Backbone/Fiber covered under the electrical RFP? Is the installation of the Racks/Cabinets covered in the electrical RFP? What is the height of the ceilings in the main hallways? Are Union Techs required? Do you need a project manager for the networking installation? Do you have a scissor lift available onsite? In the Excel spreadsheet, there are 17 switches, but did not specify the number of racks. What kind of rack do you need? Will this new campus have the infrastructure (electrical power, racks, cabling) in place to support the networking equipment (switches, WAPs)?
Response: This will be answered in Addendum 2.