County of Escambia Quote
Title: South West Branch Library HVAC
Deadline: 6/11/2021 4:00 PM (UTC-06:00) Central Time (US & Canada)
Status: Deadline Expired
Quote Number: FMSWBL2021RF
Description:
Southwest Branch Library HVAC
Equipment Change Out Scope
Site:
Southwest Branch Library
12248 Gulf Beach Hwy.
Pensacola, Fl 32507
This scope of work is for the removal of four old HVAC
systems and installation of four new HVAC systems. The currently installed
system are as follows:
1)
Trane 10-ton Heat Pump with 10kw Heat
Condenser Model# TWA120A300FA S/N 41311WKA 208/230/3PH
Air Handler Model# TWE120A300EA S/N 3284MFL5H 208/230/3PH
Heater Model# BAYHTRL310A S/N N/A 208/230/3PH
2)
Trane 3-ton Heat Pump with 10kw Heat
Condenser Model# 2TWA0036A3000AB S/N 419YHY4F 208/230/3PH
Air Handler Model# TWE042P13FB0 S/N 4205A9A1V 208/230/1PH
3)
Trane 2.5-ton Heat Pump with 10kw Heat
Condenser Model# 2TWA0030A3000AB S/N 4122R4B4F 208/230/3PH
Air Handler Model# TWE036P13FB0 S/N 4213NX61V 208/230/1PH
4)
Trane 5-ton Heat Pump with 10kw heat
Condenser Model# 2TWA0060A3000AB S/N 4184LWS2F 208/230/3PH
Air Handler Model # TWE060C15FD0 S/N 4163AHP1V 208/230/1PH
All systems must meet or exceed the following
specifications:
1)
2.5-5ton systems must be at least 14 seer
2)
10ton system must be at least 11 seer
3)
R-410a Refrigerant
4)
Factory installed TXV or EEV
5)
2.5-5ton air handlers must have ECM Variable
Speed Motor
6)
10ton air handler must have VFD evaporator fan
motor.
7)
All condensers must have high- and low-pressure protection.
8)
All condensers must have a standalone three
phase surge protection and phase monitoring.
Systems must be installed to meet
or exceed the following specifications:
1)
All work must be permitted and inspected, all
work must meet or exceed local, state and federal code that apply.
2)
All systems will have the required safeties
installed per code.
3)
All smoke detectors must be reconnected to new
systems to function as intended.
4)
All condenser units must be secured to either
existing concrete slab or suitable concrete slab for secure mounting.
5)
All duct work must be sealed to new air handling
units with tape/mastic and reinsulated with either R6 duct board or R6 duct
wrap as needed.
Contractor must provide all electrical, copper, refrigerant,
labor, and any other required materials to install and make systems fully
operational.
Contractor is responsible for proper disposal of all equipment.
All suction lines must be insulated with a minimum of ¾” wall
insulation, all joints and/or seams must be glued with appropriate contact
adhesive designed for rubber tubing insulation.
All drain lines must be either reattached to existing copper
drain lines or completely redone with at least schedule 40 PVC. All drain lines
must be installed as per manufacture specifications.
Contractor must install Ionic Air Cleaning systems on each
system (GPS, Nu-Calgon), Air cleaning system must be adequate for system
tonnage.
All thermostats must be compatible to allow for proper
system operation.
All work must be inspected by Escambia County Facilities
Management representative and punch list items resolved before invoice is
submitted for payment.
Minimum of 90-day labor/parts warranty from installation
company from date of job completion.
Units must be installed to maintain all available factory
warranties. All units must be registered with manufacture for all available
warranties.
Facilities Management contact will be William C. Barrett,
Email: wcbarrett@myescambia.com, Cell:
850-554-2723
Job site visit is scheduled for June 4th, 2021 at
10:00am for those interested.