County of Escambia Quote

Title: Geotechnical Investigation & Laboratory Testing

Deadline: 2/12/2021 5:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Deadline Expired

Quote Number: WS-EQ-2021-1

Description: The objective of the subsurface investigation and testing described within the scope of work is to characterize the subsurface geotechnical conditions at the site, define the subsurface geotechnical profile and to determine the thickness and properties of soil for landfill construction and operation.  The subsurface geotechnical investigation will consist of soil borings and sampling, and piezometer installation to estimate the elevation of the local groundwater table. 


Documents:

Documents as of 1/26/2021
Perdido Landfill - Investigation Drilling and Testing Plan- Borrow Pit.pdf
Question 1

Posted: 2/9/2021

Question: Per NWFWMD a permit is required by a license water well driller to install the four perzometers. I did not see any reference requiring a license water well driller required to complete the project nor was there a reference to a permit being required for the project. Thank you

Response: The intent of the SOW is that all licenses and permits would be obtained as required by the nature of the work.

Posted: 2/9/2021

Question: Per NWFWMD a permit is required by a license water well driller to install the four perzometers. I did not see any reference requiring a license water well driller required to complete the project nor was there a reference to a permit being required for the project. Thank you

Response: The intent of the SOW is that all licenses and permits would be obtained as required by the nature of the work.