Rio Rancho Public Schools Sealed Solicitation

Title: Architectural Design Services for Rio Rancho MS HVAC

Deadline: 7/28/2021 2:00 PM   (UTC-07:00) Mountain Time (US & Canada)

Status: Deadline Expired

Solicitation Number: RFP-2022-002-FAC

Description:

Architectural Services required for Rio Rancho MS HVAC being solicited in this RFP will include plan review and evaluation, program review and evaluation, programming, schematic design, design development, construction documents, construction administration, review and evaluation of issues through the warranty period and beyond if needed, and portable re-location planning studies, documents and coordination if needed.

 

            Project Scope:

 

Rio Rancho Public Schools (RRPS) has secured bonds for the design and construction of HVAC replacement projects at numerous schools.  RRPS would like the services of an architectural firm to oversee the design of new HVAC systems that would include mechanical and electrical upgrades as necessary to modernize these systems.  These services would include the acquisition and oversite of any and all professionals needed to assure the design(s) meet all current code and energy standards established by NMCID and NMPED.  Services shall include any and all

architectural, mechanical, and electrical modifications needed to assure proper functioning of referenced systems.

 

Rio Rancho Public Schools has established district standards (7/2020) to be used to ensure that compatible and consistent equipment and materials are installed in current and future projects. The items included in the MEP standards are being standardized in order to meet operations and maintenance needs and realize long-term benefits to the district by streamlining maintenance and reducing operating costs. Included in these standards are HVAC, Plumbing, Electrical systems the district desires to be included in the design.

 

            NOTE:  Testudo Engineering completed a design in 2018 for HVAC upgrade.  Reference 2018 design drawings.  Also, please be aware that the district shall require prospective architectural design consultants to utilize the services and information provided by Testudo Engineering as their (MEP) mechanical/electrical/plumbing subcontractor.


Pre-Bid Meeting Date: 7/15/2021 10:00 AM

Pre-Bid Meeting Details: Pre-Proposal Meeting: A non-mandatory pre-bid meeting is scheduled on July 15, 2021, @ 10:00 a.m. at Rio Rancho Public Schools District Office Training Center, Rooms 2 & 3, 500 Laser Rd. NW, Rio Rancho, NM. Access to the meeting is also available virtually using the following meeting link. Meeting ID meet.google.com/kgc-pmuz-pdv Phone Numbers (‪US‬)‪+1 208-741-5032‬‬‬‬‬‬‬ PIN: ‪600 879 406#‬‬‬‬


Documents:

Documents as of 7/26/2021
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Addition 1

Posted: 7/15/2021

Type of Addition: Addendum

Documents:

Addition 2

Posted: 7/23/2021

Type of Addition: Addendum

Documents:

Addition 3

Posted: 7/26/2021

Type of Addition: Addendum

Documents:

Question 1

Posted: 7/14/2021

Question: How old are the roofs over the various wings? Are they under warranty?

Response: This question will be addressed in Addenda No. 1.

Question 2

Posted: 7/15/2021

Question: We understand the project construction will be phased. Will the project need to be organized into bid lots to support the phased construction?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Question 3

Posted: 7/15/2021

Question: Is an electrical service upgrade anticipated to support the work? If so, is it known whether the upgrade occur at the building or centrally on campus?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Question 4

Posted: 7/16/2021

Question: RFP p. 21, Section 3: Number of projects: Is it a maximum of 3 projects that we can show, or can we show more than that?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Question 5

Posted: 7/19/2021

Question: Will restrooms be included in the scope of work to update finishes?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Question 6

Posted: 7/20/2021

Question: What is the file size limit for submissions?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Question 7

Posted: 7/20/2021

Question: RFP p. 21, Section 6: Attachments: “Project Listing Form must be provided.” We did not see it as an attachment to the RFP. Should we use our own form, or is this something you can send to us?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Posted: 7/15/2021

Type of Addition: Addendum

Documents:

Posted: 7/23/2021

Type of Addition: Addendum

Documents:

Posted: 7/26/2021

Type of Addition: Addendum

Documents:

Posted: 7/14/2021

Question: How old are the roofs over the various wings? Are they under warranty?

Response: This question will be addressed in Addenda No. 1.

Posted: 7/15/2021

Question: We understand the project construction will be phased. Will the project need to be organized into bid lots to support the phased construction?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Posted: 7/15/2021

Question: Is an electrical service upgrade anticipated to support the work? If so, is it known whether the upgrade occur at the building or centrally on campus?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Posted: 7/16/2021

Question: RFP p. 21, Section 3: Number of projects: Is it a maximum of 3 projects that we can show, or can we show more than that?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Posted: 7/19/2021

Question: Will restrooms be included in the scope of work to update finishes?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Posted: 7/20/2021

Question: What is the file size limit for submissions?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.

Posted: 7/20/2021

Question: RFP p. 21, Section 6: Attachments: “Project Listing Form must be provided.” We did not see it as an attachment to the RFP. Should we use our own form, or is this something you can send to us?

Response: See Addenda No. 2 for a response to this question, which will be posted on July 23, 2021.