Florence County Open Until Resolved RFP

Title: DESIGN/BUILD SERVICES-REVITALIZE CURRENT FOOTBALL & BASEBALL FIELDS, CONSTRUCT A NEW FOOTBALL FIELD, CONSTRUCT TWO NEW CONCESSION STANDS/BATHROOMS & PARKING AREA

Deadline: 12/4/2023 3:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Open

Solicitation Number: 26-23/24

Description: Florence County, SC is seeking a qualified firm to provide design/build services for the revitalization of the current football & baseball fields, to construct another football field, to construct two new concession stands/bathrooms and parking area at 517½ to 519 W. Market Street in Timmonsville, SC (TM# 70007-01-006). 


Pre-Bid Meeting Date: 11/15/2023 10:00 AM


Documents:

Documents as of 11/7/2023
Login to view documents
Login to view documents
Login to view documents
Login to view documents

PLANHOLDERS:

Date Company Name
11/7/2023 3:55:47 PM Design Build Construction
11/8/2023 6:04:11 AM Alliance Consulting Engineers, Inc.
11/8/2023 9:49:55 AM Sun Construction
11/8/2023 10:44:43 AM SKA Consulting Engineers, Inc.
11/8/2023 12:16:36 PM Pee Dee Building Systems, LLC
11/9/2023 12:42:58 PM Davis & Floyd, Inc.
11/9/2023 2:25:26 PM SGANW
11/10/2023 6:23:16 AM Act Global
11/10/2023 7:07:52 AM Dodge Data & Analytics
11/14/2023 7:42:48 AM Hardee Construction
11/14/2023 1:46:39 PM Contract Construction, Inc.
11/15/2023 11:12:54 AM Blutide Marine Construction
11/15/2023 3:19:44 PM Gilbert Construction
11/16/2023 8:42:08 AM Walker Consultants
11/16/2023 9:19:37 AM ConstructConnect
11/16/2023 3:08:42 PM Deltek
11/24/2023 3:51:17 AM IMS
11/29/2023 7:52:29 AM FBi Construction Inc.
12/2/2023 4:26:57 AM Dodge Data & Analytics
12/2/2023 8:44:33 PM AG Ltd
Addition 1

Posted: 11/15/2023

Pre-Bid Meeting Details: Pre-Proposal Attendance Sheet is attached.

Documents:

Question 1

Posted: 11/13/2023

Question: 1. Budget for the project. Does that include fees? 2. Number of seats for bleachers 3. Are existing baseball and football field getting new natural turf? What about drainage requirements around the fields? 4. Under the General Information, Page 4, is the information complete? It appears that a sentence was started but not completed. Please confirm all information is there. 5. Are hoods required at the concessions areas with fire suppressions, etc. 6. Is the areas noted as "Demo and create Park" part of this project? If so, please provide additional information on this portion of the work. 7. For the demo of buildings, has an asbestos survey been done? Asbestos removal by owner?

Response: Answers are as follow by number: 1. Yes 2. Multiple 40 person bleachers on each sideline. Bleachers should have guardrails. Player benches on each sideline as well. 3. Keep natural turf. Proper drainage considerations. French drain system would be wonderful, but I’m afraid it would be out of our budget. 4. The last word "Appropriately" should be deleted from the General Information Section of page 4. 5. Hood required. 6. That portion is a part of future plans and not a part of this solicitation. 7. The only demo work that is required would be the small block concession stand and restroom buildings near existing football field. No asbestos study required based on my knowledge of those structures.

Question 2

Posted: 11/20/2023

Question: Can you tell us what your budget is?

Response: Florence County does not disclose budget information in its solicitations.

Posted: 11/15/2023

Pre-Bid Meeting Details: Pre-Proposal Attendance Sheet is attached.

Documents:

Posted: 11/13/2023

Question: 1. Budget for the project. Does that include fees? 2. Number of seats for bleachers 3. Are existing baseball and football field getting new natural turf? What about drainage requirements around the fields? 4. Under the General Information, Page 4, is the information complete? It appears that a sentence was started but not completed. Please confirm all information is there. 5. Are hoods required at the concessions areas with fire suppressions, etc. 6. Is the areas noted as "Demo and create Park" part of this project? If so, please provide additional information on this portion of the work. 7. For the demo of buildings, has an asbestos survey been done? Asbestos removal by owner?

Response: Answers are as follow by number: 1. Yes 2. Multiple 40 person bleachers on each sideline. Bleachers should have guardrails. Player benches on each sideline as well. 3. Keep natural turf. Proper drainage considerations. French drain system would be wonderful, but I’m afraid it would be out of our budget. 4. The last word "Appropriately" should be deleted from the General Information Section of page 4. 5. Hood required. 6. That portion is a part of future plans and not a part of this solicitation. 7. The only demo work that is required would be the small block concession stand and restroom buildings near existing football field. No asbestos study required based on my knowledge of those structures.

Posted: 11/20/2023

Question: Can you tell us what your budget is?

Response: Florence County does not disclose budget information in its solicitations.