Town of Medley Sealed Solicitation
Title: LEHIGH LAKE SHORELINE REPAIRS
Deadline: 1/29/2019 3:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: 2019-009
Description:
The
Contractor must furnish all supervision, labor, materials, tools, equipment,
and perform all operations required to construct a concrete retaining wall at
the Medley Lakeside Retirement Park located along NW 105th Way in
accordance with the Contract Documents and as described in the Drawings,
General Notes, and Technical Specifications.
Work
includes, but is not limited to, the construction of the concrete wall which is
approximately 760 ft. in length along three sections of the NW 105th
Way (Lehigh Lake Shoreline).
1.
The
new concrete wall will consist of a precast concrete L-section and a cast in
place part. The precast section part is instead to be use in the bottom
(underwater) part of the wall and the cast in place above the water level.
2.
There
is an existing gabion wall that is going to remain in place.
3.
A
suggested method of placement of the precast section is included in the
drawings, however the CONTRACTOR may propose alternative methods for approval
by the Engineer.
4.
The
CONTRACTOR must provide a minimum of 3 feet excavation into the natural
limestone conditions per the Geotechnical Report dated July 24, 2018.
Work shall include
disposal of all construction debris, unused excavated material, and all unsuitable
material. The forgoing is herein referred to as the “Project” or the “Work”, as
shown on the Drawings prepared by R. J. Behar & Company, Inc. and this
Project Manual.
Pre-Bid Meeting Date: 12/20/2018 10:00 AM
Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-solicitation meeting.
Documents:
Documents as of 12/6/2018 |
---|
Login to view documents |
Login to view documents |
Addition 1
Posted: 12/20/2018
Type of Addition: Pre Bid Meeting Sign In Sheet
Documents:
Addition 2
Posted: 1/3/2019
Type of Addition: Addendum #1
Overview:
Addendum #1 does
the following:
Revisions to
the
Solicitation Documents as follows (additions underlined,
deletions strikethrough):
1.
Part 1 – General Bid Information – Schedule of
Events
3. FINAL DAY FOR BIDDER QUESTIONS January 3, 2019 January
7, 2019
4. OPENING OF BIDS January
8, 2019 January 14, 2019
Deadline: 1/14/2019 3:00 PM
Solicitation #: ITB 2019-009
Documents:
Addition 3
Posted: 1/14/2019
Type of Addition: Addendum #2
Overview:
Addendum #2 does
the following:
Revisions to
the
Solicitation Documents as follows (additions underlined,
deletions strikethrough):
1.
Part 1 – General Bid Information – Schedule of
Events
3. FINAL DAY FOR BIDDER QUESTIONS January 7, 2019 January 21, 2019
4. OPENING OF BIDS January 14, 2019 January
29, 2019
5. RECOMMENDATION OF AWARD January 16, 2019 February
6, 2019
6. AWARD OF PROJECT BY THE TOWN COUNCIL February
4, 2019 March 4, 2019
7. NOTICE OF AWARD GIVEN TO CONTRACTOR February
5, 2019 March 5, 2019
8. CONTRACT DOCUMENTS EXECUTION February 19, 2019 March 19, 2019
9. NOTICE TO PROCEED ISSUED TO CONTRACTOR February 20, 2019 March
20, 2019
10. SUBSTANTIAL COMPLETION (240 DAYS) October
20, 2019 November 20, 2019
11. FINAL COMPLETION (30 DAYS) November
20, 2019 December 20, 2019
12. PROJECT CLOSEOUT (45 DAYS) January
6, 2020 February 6, 2020
13. WARRANTY INSPECTION December 6, 2020 January 6, 2021
Deadline: 1/29/2019 3:00 PM
Solicitation #: 2019-009
Documents:
Addition 5
Posted: 2/7/2019
Type of Addition: Bid Tabulation Report
Overview:
Addition 6
Posted: 2/7/2019
Type of Addition: Bid Tabulation Report
Overview:
Documents:
Addition 7
Posted: 2/7/2019
Type of Addition: Bid Tabulation Report
Overview:
Documents:
Addition 8
Posted: 4/25/2019
Type of Addition: Award Information
Amount: $1,427,064.00
Documents:
Posted: 12/20/2018
Type of Addition: Pre Bid Meeting Sign In Sheet
Documents:
Posted: 1/3/2019
Type of Addition: Addendum #1
Overview:
Addendum #1 does
the following:
Revisions to
the
Solicitation Documents as follows (additions underlined,
deletions strikethrough):
1.
Part 1 – General Bid Information – Schedule of
Events
3. FINAL DAY FOR BIDDER QUESTIONS January 3, 2019 January
7, 2019
4. OPENING OF BIDS January
8, 2019 January 14, 2019
Deadline: 1/14/2019 3:00 PM
Solicitation #: ITB 2019-009
Documents:
Posted: 1/14/2019
Type of Addition: Addendum #2
Overview:
Addendum #2 does
the following:
Revisions to
the
Solicitation Documents as follows (additions underlined,
deletions strikethrough):
1.
Part 1 – General Bid Information – Schedule of
Events
3. FINAL DAY FOR BIDDER QUESTIONS January 7, 2019 January 21, 2019
4. OPENING OF BIDS January 14, 2019 January
29, 2019
5. RECOMMENDATION OF AWARD January 16, 2019 February
6, 2019
6. AWARD OF PROJECT BY THE TOWN COUNCIL February
4, 2019 March 4, 2019
7. NOTICE OF AWARD GIVEN TO CONTRACTOR February
5, 2019 March 5, 2019
8. CONTRACT DOCUMENTS EXECUTION February 19, 2019 March 19, 2019
9. NOTICE TO PROCEED ISSUED TO CONTRACTOR February 20, 2019 March
20, 2019
10. SUBSTANTIAL COMPLETION (240 DAYS) October
20, 2019 November 20, 2019
11. FINAL COMPLETION (30 DAYS) November
20, 2019 December 20, 2019
12. PROJECT CLOSEOUT (45 DAYS) January
6, 2020 February 6, 2020
13. WARRANTY INSPECTION December 6, 2020 January 6, 2021
Deadline: 1/29/2019 3:00 PM
Solicitation #: 2019-009
Documents:
Posted: 2/7/2019
Type of Addition: Bid Tabulation Report
Overview:
Posted: 2/7/2019
Type of Addition: Bid Tabulation Report
Overview:
Documents:
Posted: 2/7/2019
Type of Addition: Bid Tabulation Report
Overview:
Documents:
Posted: 4/25/2019
Type of Addition: Award Information
Amount: $1,427,064.00