Peralta Community College District Sealed Solicitation

Title: LANEY COLLEGE FABRICATION LAB RELOCATION PROJECT

Deadline: 3/13/2024 3:00 PM   (UTC-08:00) Pacific Time (US & Canada)

Status: Deadline Expired

Solicitation Number: Bid # 23-24/06

Description: This project consists of Relocation of the existing Fabrication Lab from the South Side of the Theatre Building by the Outdoor Work Area to the Art Center Building. The scope of work includes but is not limited to demolition of existing partitions, and providing new framing and partitions in the new Fabrication Lab space in the Art Center Building as well as Mechanical, Electrical, Plumbing and Structural work. Also included is providing a new DSA-Approved Steel Canopy at the outside courtyard area of the Art Center Building.


Pre-Bid Meeting Date: 2/21/2024 10:00 AM

Pre-Bid Meeting Details: SERAPHINE NZOMO is inviting you to a scheduled Zoom meeting. Topic: Laney College Fabrication Lab Relocation Project (Bid No. 23-24/06) Time: Feb 21, 2024 10:00 AM Pacific Time (US and Canada) Join Zoom Meeting https://peralta-edu.zoom.us/j/84190563906 Meeting ID: 841 9056 3906 --- One tap mobile +16694449171,,84190563906# US +17207072699,,84190563906# US (Denver) --- Dial by your location • +1 669 444 9171 US • +1 720 707 2699 US (Denver) • +1 253 205 0468 US • +1 253 215 8782 US (Tacoma) • +1 346 248 7799 US (Houston) • +1 719 359 4580 US • +1 309 205 3325 US • +1 312 626 6799 US (Chicago) • +1 360 209 5623 US • +1 386 347 5053 US • +1 507 473 4847 US • +1 564 217 2000 US • +1 646 558 8656 US (New York) • +1 646 931 3860 US • +1 689 278 1000 US • +1 301 715 8592 US (Washington DC) • +1 305 224 1968 US Meeting ID: 841 9056 3906 Find your local number: https://peralta-edu.zoom.us/u/kb9VEprTjX


Documents:

Documents as of 2/23/2024
Advertisement_Bid_23_24_06_Laney_Fab_Lab_Relocation_Project.pdf
Drawing_01_120289_DWG_A.pdf
DSA_01_120289_103_A.pdf
Spec_01_120289_SPC_A.pdf
00_45_46.13_SLBE_SELBE_Program.pdf
Bid_23_24_06_Manual.pdf
Pre_Bid_Mandatory_Site_Visit_Sign_in_Sheet.pdf
Addition 1

Posted: 3/8/2024

Type of Addition: Addendum One

Documents:

Addition 2

Posted: 3/13/2024

Type of Addition: Bid Opening Results

Overview:

Documents:

Question 1

Posted: 2/23/2024

Question: Question No. 1: Will all equipment listed on the equipment schedule per Plan A2.01 and Plan A9.00 be provided by the PCCD Laney College? Question No. 2: Please advise if there is any work scope/demo at the existing fabrication lab that the GC or subcontractors need to be done to move over to the new location of the fabrication lab?

Response: Question # 1: Provide the following equipment as a part of the contract. All other equipment in the schedule will be furnished by the District: a. E-14 Whiteboard b. E-36 Electric Reels c. E-46 Compressed Air Drops/Reels Contractor is responsible for providing appropriate backing and anchoring of existing equipment where intended to be installed in permanent locations. Question # 2: No work is anticipated at the existing fabrication lab location.

Question 2

Posted: 2/26/2024

Question: Question No. 3: What will be the approved copper piping for the air lines? i.e, Type L or Type K. Question No. 4: Per Plan A9.0, please identify all equipment that the plumbing contractor will be responsible for in relation to Per Plan P2.01. Question No. 5: Per Plan P2.01, please confirm if E-41, E-47 and E-45 will require compressed air drops (E-46).

Response: Question # 3: See P0.02 for plumbing specifications. Question # 4: The contract requires the content shown on P2.01 to be furnished by the contract. General Contractor to coordinate work responsibilities. Question # 5: P2.01 show compressed air connection to the retractable compressor hose reels. (E-46). E-41, E-45, and E-47 do not require compressed air connections.

Question 3

Posted: 2/27/2024

Question: Per Spec Section 02 41 19 Article 1.8: E. Hazardous Materials: Present in buildings and structures to be selectively demoed. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present. Please provide the Hazardous Material Survey report for review.

Response: Per the District, no hazardous material survey report is available and hazardous materials are not anticipated.

Question 4

Posted: 2/28/2024

Question: The bid form seems to be an edit version. Is there a final version that we should use?

Response: No. Please use the edit version provided.

Question 5

Posted: 2/28/2024

Question: The Federal Byrd Anti-Lobbying Certificate is not in the Specs. Please advise.

Response: This certificate is not needed for this project.

Posted: 3/8/2024

Type of Addition: Addendum One

Documents:

Posted: 3/13/2024

Type of Addition: Bid Opening Results

Overview:

Documents:

Posted: 2/23/2024

Question: Question No. 1: Will all equipment listed on the equipment schedule per Plan A2.01 and Plan A9.00 be provided by the PCCD Laney College? Question No. 2: Please advise if there is any work scope/demo at the existing fabrication lab that the GC or subcontractors need to be done to move over to the new location of the fabrication lab?

Response: Question # 1: Provide the following equipment as a part of the contract. All other equipment in the schedule will be furnished by the District: a. E-14 Whiteboard b. E-36 Electric Reels c. E-46 Compressed Air Drops/Reels Contractor is responsible for providing appropriate backing and anchoring of existing equipment where intended to be installed in permanent locations. Question # 2: No work is anticipated at the existing fabrication lab location.

Posted: 2/26/2024

Question: Question No. 3: What will be the approved copper piping for the air lines? i.e, Type L or Type K. Question No. 4: Per Plan A9.0, please identify all equipment that the plumbing contractor will be responsible for in relation to Per Plan P2.01. Question No. 5: Per Plan P2.01, please confirm if E-41, E-47 and E-45 will require compressed air drops (E-46).

Response: Question # 3: See P0.02 for plumbing specifications. Question # 4: The contract requires the content shown on P2.01 to be furnished by the contract. General Contractor to coordinate work responsibilities. Question # 5: P2.01 show compressed air connection to the retractable compressor hose reels. (E-46). E-41, E-45, and E-47 do not require compressed air connections.

Posted: 2/27/2024

Question: Per Spec Section 02 41 19 Article 1.8: E. Hazardous Materials: Present in buildings and structures to be selectively demoed. A report on the presence of hazardous materials is on file for review and use. Examine report to become aware of locations where hazardous materials are present. Please provide the Hazardous Material Survey report for review.

Response: Per the District, no hazardous material survey report is available and hazardous materials are not anticipated.

Posted: 2/28/2024

Question: The bid form seems to be an edit version. Is there a final version that we should use?

Response: No. Please use the edit version provided.

Posted: 2/28/2024

Question: The Federal Byrd Anti-Lobbying Certificate is not in the Specs. Please advise.

Response: This certificate is not needed for this project.