Porterville Unified School District Open Until Resolved RFP
Title: PUSD 2020/2021 PAVING AND CONCRETE PROJECTS
Deadline: 12/28/2020 3:00 PM (UTC-08:00) Pacific Time (US & Canada)
Status: Deadline Expired
Solicitation Number: 3
Description:
School Site Address: Multiple School Sites ASPHALT SEAL COAT, STRIPING, ASPHALT REPLACEMENT, CONCRETE REPLACEMENT AND DIRT GRADING 2021
Job Walk: December 21, 2020@1:00pm MONACHE HIGH SCHOOL
960 N NEWCOMB ST - PORTERVILLE, CA 93257
Bids Due: December 28, 2020 @ 1:00 PM
Anticipated Start date if approved Mid-January
SCOPE OF WORK PER SITE:
MONACHE HIGH SCHOOL
960 N NEWCOMB ST
PORTERVILLE, CA 93257:
1. Basketball Courts: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE” and re- stripe existing scheme on basketball courts 66,000 +/- Sq./Ft
= $______________________
SEQUOIA MIDDLE SCHOOL
1450 W CASTLE AVE
PORTERVILLE, CA 93257:
1. Admin Parking Lot: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE” and re- stripe existing scheme on basketball courts 3,000 +/- Sq/Ft
= $______________________
2. Basketball Courts: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE” and re- stripe existing scheme on basketball courts 25,500 +/- Sq/Ft = $________________________
MONTE VISTA ELEMENTRY
701 W WESTFIELD AVE
PORTERVILLE, CA 93257:
1. Admin Parking Lot: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE” and re- stripe existing scheme on parking lot 24,800 +/- Sq/Ft
= $______________________
2. Basketball Courts: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE” and re- stripe existing scheme on basketball/thederball courts 20,600 +/- Sq/Ft = $________________________
3. Fire Lane: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE” and re- stripe as required 13,200 +/- Sq/Ft
4. Demo and replace asphalt basketball area with new 2” of asphalt per the attached picture.
= $______________________
SANTA FE ELEMENTRY SCHOOL
286 E ORANGE AVE
PORTERVILLE, CA 93257:
1. Admin Parking Lot: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE” and re- stripe existing scheme on parking lot 33,200 +/- Sq/Ft. Saw cut and remove a 24’x24’ area of asphalt and replace with 3” thick and skim patch area with asphalt. Will also include painting of existing curbs in parking lot.
= $______________________
LOS ROBLES ELEMENTRY SCHOOL
500 E MULBERRY AVE
PORTERVILLE, CA 93257:
1. Demo and replace asphalt basketball area with new 2” of asphalt per the attached picture.
= $______________________
2. Replace Asphalt Basketball court area with new 5” concrete 5.5 sack mix and 1-1/2” rock.
= $______________________
3. Demo and grade site for 5” of concrete. Install 6” Base rock that will need to be installed and compacted to 95% Testing of Base rock will be handled by CTL Testing lab PUSD shall cover all testing lab cost. Concrete shall match existing concrete grades.
= $______________________
PORTERVILLE HIGH SCHOOL
465 W OLIVE AVE
PORTERVILLE, CA 93257:
1. Grade site as noted on attached drawing. Install 6” of Decompose Granite and compact with a wheel roller approximately 15,000sf +/-.
= $______________________
If you should have any questions, please feel free to contact me @ (559) 310-9274.
Thank you
Omar Flores
Project Manager
Porterville Unified School District
(559) 782-7066 ext. 4641
omarflores@portervilleschools.org
Pre-Bid Meeting Date: 12/21/2020 1:00 PM
Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.Job Walk Address Monache High School 960 N Newcomb Ave Porterville,Ca 93257
Documents:
Documents as of 12/17/2020 |
---|
PUSD CONCRETE SPECS 033000.pdf |
PUSD-2020-2021 CONC.ASPHALT SCOPE OF WORK.pdf |
Addition 1
Posted: 12/18/2020
Type of Addition: Addendum 1
Overview:
Addendum #1
1. Use attached revised scope letter and bid form.
2. Bid Job walk schedule for December 21,2020 @1:00 pm
3. Bids Due December 28,2020 @3:00 pm-Bids must be submitted via Vendor Registry
4. Job walk is mandatory and all attendees must sign in at each job location.
5. Project is subject to prevailing wage rates and DIR.
6. Bonds shall be required for any scope of work $25,000.00 or greater
7. Any Asphalt portions of work shall take place in Mid-March.
Thank you
Omar Flores
Facilities Project Manager
omarflores@portervilleschools.org
Office (559)782-7066 Ext. 4670
Deadline: 12/28/2020 3:00 PM
Pre-Bid Meeting Date: 12/21/2020 1:00 PM
Solicitation #: 3
Documents:
Posted: 12/18/2020
Type of Addition: Addendum 1
Overview:
Addendum #1
1. Use attached revised scope letter and bid form.
2. Bid Job walk schedule for December 21,2020 @1:00 pm
3. Bids Due December 28,2020 @3:00 pm-Bids must be submitted via Vendor Registry
4. Job walk is mandatory and all attendees must sign in at each job location.
5. Project is subject to prevailing wage rates and DIR.
6. Bonds shall be required for any scope of work $25,000.00 or greater
7. Any Asphalt portions of work shall take place in Mid-March.
Thank you
Omar Flores
Facilities Project Manager
omarflores@portervilleschools.org
Office (559)782-7066 Ext. 4670
Deadline: 12/28/2020 3:00 PM
Pre-Bid Meeting Date: 12/21/2020 1:00 PM
Solicitation #: 3
Documents: