Porterville Unified School District Open Until Resolved RFP

Title: PUSD 2020/2021 PAVING AND CONCRETE PROJECTS

Deadline: 12/28/2020 3:00 PM   (UTC-08:00) Pacific Time (US & Canada)

Status: Deadline Expired

Solicitation Number: 3

Description:

School Site Address: Multiple School Sites ASPHALT SEAL COAT, STRIPING, ASPHALT REPLACEMENT, CONCRETE REPLACEMENT AND DIRT GRADING 2021

 

 

Job Walk: December 21, 2020@1:00pm MONACHE HIGH SCHOOL

960 N NEWCOMB ST - PORTERVILLE, CA 93257

Bids Due: December 28, 2020 @ 1:00 PM

Anticipated Start date if approved Mid-January  

 

 

SCOPE OF WORK PER SITE:

 

MONACHE HIGH SCHOOL

960 N NEWCOMB ST

PORTERVILLE, CA 93257:

1.       Basketball Courts: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE”  and re- stripe existing scheme on basketball courts 66,000 +/- Sq./Ft

 = $______________________

 

 

SEQUOIA MIDDLE SCHOOL

1450 W CASTLE AVE

PORTERVILLE, CA 93257:

 

1.        Admin Parking Lot: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE”  and re- stripe existing scheme on basketball courts 3,000 +/- Sq/Ft

 = $______________________

 

2.      Basketball Courts: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE”  and re- stripe existing scheme on basketball courts  25,500 +/- Sq/Ft = $­­­­­________________________

 

MONTE VISTA ELEMENTRY

701 W WESTFIELD AVE

PORTERVILLE, CA 93257:

 

 

1.        Admin Parking Lot: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE”  and re- stripe existing scheme on parking lot 24,800 +/- Sq/Ft

 = $______________________

 

2.      Basketball Courts: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE”  and re- stripe existing scheme on basketball/thederball courts  20,600 +/- Sq/Ft = $­­­­­________________________

 

3.       Fire Lane: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE”  and re- stripe as required 13,200 +/- Sq/Ft

 

4.      Demo and replace asphalt basketball area with new 2” of asphalt per the attached picture. 

 = $______________________

 

 

SANTA FE ELEMENTRY SCHOOL

286 E ORANGE AVE

PORTERVILLE, CA 93257:

 

1.        Admin Parking Lot: Remove debris from cracks and fill w/rubberized crack filler & apply (2) coats of “TUF-COTE” and re- stripe existing scheme on parking lot 33,200 +/- Sq/Ft.  Saw cut and remove a 24’x24’ area of asphalt and replace with 3” thick and skim patch area with asphalt. Will also include painting of existing curbs in parking lot. 

 = $______________________

 LOS ROBLES ELEMENTRY SCHOOL

500 E MULBERRY AVE

PORTERVILLE, CA 93257:

 

1.      Demo and replace asphalt basketball area with new 2” of asphalt per the attached picture. 

 = $______________________

 

2.      Replace Asphalt Basketball court area with new 5” concrete 5.5 sack mix and 1-1/2” rock. 

 = $______________________

 

3.      Demo and grade site for 5” of concrete. Install 6” Base rock that will need to be installed and compacted to 95% Testing of Base rock will be handled by CTL Testing lab PUSD shall cover all testing lab cost. Concrete shall match existing concrete grades.   

= $______________________

 

PORTERVILLE HIGH SCHOOL

465 W OLIVE AVE

PORTERVILLE, CA 93257:

 

1.      Grade site as noted on attached drawing.  Install 6” of Decompose Granite and compact with a wheel roller approximately 15,000sf +/-. 

= $______________________

 

If you should have any questions, please feel free to contact me @ (559) 310-9274.

 

 

Thank you

 

 Omar Flores

Project Manager

Porterville Unified School District

(559) 782-7066 ext. 4641

omarflores@portervilleschools.org

 


Pre-Bid Meeting Date: 12/21/2020 1:00 PM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.Job Walk Address Monache High School 960 N Newcomb Ave Porterville,Ca 93257


Documents:

Documents as of 12/17/2020
PUSD CONCRETE SPECS 033000.pdf
PUSD-2020-2021 CONC.ASPHALT SCOPE OF WORK.pdf
Addition 1

Posted: 12/18/2020

Type of Addition: Addendum 1

Overview:

Addendum #1

 

1.    Use attached revised scope letter and bid form.

2.    Bid Job walk schedule for December 21,2020 @1:00 pm

3.    Bids Due December 28,2020 @3:00 pm-Bids must be submitted via Vendor Registry

4.    Job walk is mandatory and all attendees must sign in at each job location. 

5.    Project is subject to prevailing wage rates and DIR. 

6.    Bonds shall be required for any scope of work $25,000.00 or greater

7.    Any Asphalt portions of work shall take place in Mid-March.   

 

 

 

 

 

Thank you

 

Omar Flores

Facilities Project Manager

omarflores@portervilleschools.org

Office (559)782-7066 Ext. 4670

 

Deadline: 12/28/2020 3:00 PM

Pre-Bid Meeting Date: 12/21/2020 1:00 PM

Solicitation #: 3

Documents:

Posted: 12/18/2020

Type of Addition: Addendum 1

Overview:

Addendum #1

 

1.    Use attached revised scope letter and bid form.

2.    Bid Job walk schedule for December 21,2020 @1:00 pm

3.    Bids Due December 28,2020 @3:00 pm-Bids must be submitted via Vendor Registry

4.    Job walk is mandatory and all attendees must sign in at each job location. 

5.    Project is subject to prevailing wage rates and DIR. 

6.    Bonds shall be required for any scope of work $25,000.00 or greater

7.    Any Asphalt portions of work shall take place in Mid-March.   

 

 

 

 

 

Thank you

 

Omar Flores

Facilities Project Manager

omarflores@portervilleschools.org

Office (559)782-7066 Ext. 4670

 

Deadline: 12/28/2020 3:00 PM

Pre-Bid Meeting Date: 12/21/2020 1:00 PM

Solicitation #: 3