St. Johns River Water Management District Sealed Solicitation
Title: S-96 Rehabilitation
Deadline: 8/26/2021 2:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: In Review
Solicitation Number: 36965
Description:
The
objective of this water control structure rehabilitation project is to repair
the damaged and aging concrete, repair and paint the sheet pile wing walls,
repair and paint the roller gate, replace the existing hydraulic gate operators
with electric operated cable drum hoists, replace the upstream and downstream
safety barriers, replace fencing, and other miscellaneous site work. This work
is necessary to ensure the operational readiness of Structure S-96 and to
satisfy the requirements of the United States Army Corps of Engineers.
Structure S-96 is located between
St. Johns Water Management Area (SJWMA) and the western terminus of Canal C-54
within the Upper St. Johns River Basin Project in Brevard County, Florida at
approximate GPS coordinates of latitude 27.823850°, longitude -80.707279°.
Pre-Bid Meeting Date: 7/20/2021 10:00 AM
Pre-Bid Meeting Details: A Non-Mandatory Pre-Bid Conference is scheduled for July 20, 2021, at 10:00 a.m., at at the pavilion at the Fellsmere Grade Recreation Area at the end of Fellsmere Grade Road, Fellsmere, Florida, approximate GPS coordinates of latitude 27.823021°, longitude -80.707882°.. The purpose of the pre-bid conference is to clarify requirements of this solicitation.
Documents:
Documents as of 7/6/2021 |
---|
IFB_36965_S-96 Rehabilitation.pdf |
S-96 REHAB IFB 05-14-2021.pdf |
S-96 As-Built_1small.pdf |
S-96 As-Built_2small.pdf |
S-96 As-Built_3small.pdf |
IFB 36965 S96 Rehab Addendum 1.pdf |
Addition 1
Posted: 6/28/2021
Type of Addition: As Builts
Documents:
Addition 2
Posted: 7/6/2021
Type of Addition: Addendum
Overview: Addendum 1
Solicitation #: 36965
Documents:
Addition 3
Posted: 7/13/2021
Type of Addition: Addendum
Overview: Addendum 2
Documents:
Addition 4
Posted: 7/19/2021
Type of Addition: Addendum
Overview: Addendum 3
Solicitation #: 36965
Documents:
Addition 5
Posted: 7/19/2021
Type of Addition: Addendum
Overview: Addendum 3 attachments
Solicitation #: 36965
Documents:
Addition 6
Posted: 7/27/2021
Type of Addition: Addendum
Overview: Addendum 4
Deadline: 8/26/2021 2:00 PM
Solicitation #: 36965
Documents:
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
Addition 7
Posted: 7/27/2021
Type of Addition: Addendum
Overview: Addendum 4
Deadline: 8/26/2021 2:00 PM
Solicitation #: 36965
Documents:
Addition 8
Posted: 8/3/2021
Type of Addition: Addendum
Overview: Addendum 5
Solicitation #: 36965
Documents:
Addition 9
Posted: 8/10/2021
Type of Addition: Addendum
Overview: Addendum 6
Solicitation #: 36965
Documents:
Addition 10
Posted: 8/10/2021
Type of Addition: Addendum
Overview: Addendum 6
Solicitation #: 36965
Documents:
Addition 11
Posted: 8/13/2021
Type of Addition: Addendum
Overview: Addendum 7
Solicitation #: 36965
Documents:
Addition 12
Posted: 8/20/2021
Type of Addition: Addendum
Overview: Addendum 8
Solicitation #: 36965
Documents:
Addition 13
Posted: 8/27/2021
Type of Addition: In Review
Overview: Notice of Intended Decision
Documents:
Posted: 6/28/2021
Type of Addition: As Builts
Documents:
Posted: 7/6/2021
Type of Addition: Addendum
Overview: Addendum 1
Solicitation #: 36965
Documents:
Posted: 7/13/2021
Type of Addition: Addendum
Overview: Addendum 2
Documents:
Posted: 7/19/2021
Type of Addition: Addendum
Overview: Addendum 3
Solicitation #: 36965
Documents:
Posted: 7/19/2021
Type of Addition: Addendum
Overview: Addendum 3 attachments
Solicitation #: 36965
Documents:
Posted: 7/27/2021
Type of Addition: Addendum
Overview: Addendum 4
Deadline: 8/26/2021 2:00 PM
Solicitation #: 36965
Documents:
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- SPECIFICATION SECTION 09900 - PROTECTIVE COATINGS.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- SPECIFICATION SECTION 14611 - VERTICAL LIFT GATE OPERATING SYSTEMS.pdf
- S-96 REHAB SHEET C3 NOTES FINAL 2021-07-23.pdf
- IFB 36965 S96 Rehab Addendum 4.pdf
Posted: 7/27/2021
Type of Addition: Addendum
Overview: Addendum 4
Deadline: 8/26/2021 2:00 PM
Solicitation #: 36965
Documents:
Posted: 8/3/2021
Type of Addition: Addendum
Overview: Addendum 5
Solicitation #: 36965
Documents:
Posted: 8/10/2021
Type of Addition: Addendum
Overview: Addendum 6
Solicitation #: 36965
Documents:
Posted: 8/10/2021
Type of Addition: Addendum
Overview: Addendum 6
Solicitation #: 36965
Documents:
Posted: 8/13/2021
Type of Addition: Addendum
Overview: Addendum 7
Solicitation #: 36965
Documents:
Posted: 8/20/2021
Type of Addition: Addendum
Overview: Addendum 8
Solicitation #: 36965
Documents:
Posted: 8/27/2021
Type of Addition: In Review
Overview: Notice of Intended Decision
Documents: