Description:
Pre-Bid Meeting Date: 3/24/2020 9:00 AM
Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.A NON-MANDATORY PRE-PROPOSAL CONFERENCE will be held via teleconference, on March 24, 2020 at 9:00 AM. Interested contractors should call 386.671.3178 no earlier than 15 minutes before. Please pre-register so we have an idea how many are attending.
Documents:
Addition 1
Posted: 3/17/2020
Type of Addition: Addendum 1
Overview: changing the method and location of the Prebid Conference.
Documents:
Addition 2
Posted: 3/19/2020
Type of Addition: Addendum 2
Overview: Allow Electronic Bidding
Addition 3
Posted: 3/23/2020
Type of Addition: Addendum 2
Solicitation #: ITB 20383
Documents:
Addition 4
Posted: 3/25/2020
Type of Addition: Addendum 3
Overview: Accepting online bids only.
Documents:
Addition 5
Posted: 3/31/2020
Type of Addition: Addendum 4
Overview: Questions & Answers, revised plans. Plans cover states Addendum 3, but is really Add 4.
Addition 6
Posted: 3/31/2020
Type of Addition: Addendum 4
Overview: Questions & Answers, revised plans. Revised Bid Schedule .
Documents:
Addition 7
Posted: 4/1/2020
Type of Addition: Addendum 5
Overview: Revised forms removing notary requirements.
Documents:
Addition 8
Posted: 4/13/2020
Type of Addition: Addendum 6
Overview: Questions and Answers, additional forms, revised Bid Schedule.
Documents:
Addition 9
Posted: 4/14/2020
Type of Addition: Addendum 7
Overview: Question and Answers
Documents:
Addition 10
Posted: 4/16/2020
Type of Addition: Addendum 8
Overview: Question & Answer, planholders list.
Documents:
Addition 11
Posted: 4/21/2020
Type of Addition: In Review / Bid Tabulation Sheet
Documents:
Addition 12
Posted: 6/4/2020
Type of Addition: Award Information
Documents:
Question 1
Posted: 3/21/2020
Question: Would the City please reconsider abandoning the existing wall behind the proposed bulkhead wall ?
Response: See addendum 4, Question 11.
Question 2
Posted: 3/23/2020
Question: Reference the "Item(s) Required with Submittal", page 11 of 154, the "Minority and Women Owned Business Enterprises Certification Forms" and "Minority and Women Owned Business Enterprises Officer Certification Forms", please provide the forms, we were not able to locate the forms in the Bid Package.
Response: MBE/WBE form are part of the bid packet (pages 20-24).
Question 3
Posted: 3/27/2020
Question: Is there an approved or projected budget for this project?
Response: the current Engineers Estimate is $3,326,655.00
Question 4
Posted: 4/7/2020
Question: 1) Is there a water source available on site for Contractor? Hydrant or hose bib? Where are they located? 2) The Aluminum C Channel CS 6x6.42 doesn't seem to be available given it is a Canadian Standard Channel. Do you have an alternate or a supplier?
Response: If you plan on using City water, note there is a $3,398 deposit for the hydrant meter and water is billed out at approximately $5.75/ 1,000 gallons.
Question 5
Posted: 4/8/2020
Question: The detail provided for the Guard At Pipe Outfalls only provides details for pipe up 42". There is one 60" pipe out falls. Can details or direction be provided for the 60" outfall pipe guard?
Response: The guards are available for 60” pipe as well. Shop drawing approval will b required prior to ordering. Environmental Composites, Inc. (352) 343-3449 has been contacted to confirm any size can be fabricated.
Question 6
Posted: 4/9/2020
Question: The "Minority and Women Owned Business Enterprises Certification Form" and "Minority and Women Owned Business Enterprises Officer Certification Form" are not in the bid documents, please provide these 2 forms if they are to be part of the package to submit at bid time.
Response: This will be covered under Question 36 of Addendum #6 which will be coming out soon. Copies of these forms will be included in Addendum 6 as well.
Question 7
Posted: 4/14/2020
Question: With regards to pay item # 5 Demolition, Hauling and Disposal. Certain items will be taken to recycling facilities which may not have the capability to measure incoming loads, how will payment be made for those items without scale tickets?
Response: If contractor elects to recycle any material, contractor will need to provide supporting documentation for the weight of the material recycled. A Public Works Inspector will be assigned to the project and they will need to see all loads prior to transport to the recycler.
Question 8
Posted: 4/14/2020
Question: May you provide the color code for the railing please
Response: Color to be approved during the shop drawing review for the handrail, use Color Code No. 34058.
Posted: 3/17/2020
Type of Addition: Addendum 1
Overview: changing the method and location of the Prebid Conference.
Documents:
Posted: 3/19/2020
Type of Addition: Addendum 2
Overview: Allow Electronic Bidding
Posted: 3/23/2020
Type of Addition: Addendum 2
Solicitation #: ITB 20383
Documents:
Posted: 3/25/2020
Type of Addition: Addendum 3
Overview: Accepting online bids only.
Documents:
Posted: 3/31/2020
Type of Addition: Addendum 4
Overview: Questions & Answers, revised plans. Plans cover states Addendum 3, but is really Add 4.
Posted: 3/31/2020
Type of Addition: Addendum 4
Overview: Questions & Answers, revised plans. Revised Bid Schedule .
Documents:
Posted: 4/1/2020
Type of Addition: Addendum 5
Overview: Revised forms removing notary requirements.
Documents:
Posted: 4/13/2020
Type of Addition: Addendum 6
Overview: Questions and Answers, additional forms, revised Bid Schedule.
Documents:
Posted: 4/14/2020
Type of Addition: Addendum 7
Overview: Question and Answers
Documents:
Posted: 4/16/2020
Type of Addition: Addendum 8
Overview: Question & Answer, planholders list.
Documents:
Posted: 4/21/2020
Type of Addition: In Review / Bid Tabulation Sheet
Documents:
Posted: 3/21/2020
Question: Would the City please reconsider abandoning the existing wall behind the proposed bulkhead wall ?
Response: See addendum 4, Question 11.
Posted: 3/23/2020
Question: Reference the "Item(s) Required with Submittal", page 11 of 154, the "Minority and Women Owned Business Enterprises Certification Forms" and "Minority and Women Owned Business Enterprises Officer Certification Forms", please provide the forms, we were not able to locate the forms in the Bid Package.
Response: MBE/WBE form are part of the bid packet (pages 20-24).
Posted: 3/27/2020
Question: Is there an approved or projected budget for this project?
Response: the current Engineers Estimate is $3,326,655.00
Posted: 4/7/2020
Question: 1) Is there a water source available on site for Contractor? Hydrant or hose bib? Where are they located? 2) The Aluminum C Channel CS 6x6.42 doesn't seem to be available given it is a Canadian Standard Channel. Do you have an alternate or a supplier?
Response: If you plan on using City water, note there is a $3,398 deposit for the hydrant meter and water is billed out at approximately $5.75/ 1,000 gallons.
Posted: 4/8/2020
Question: The detail provided for the Guard At Pipe Outfalls only provides details for pipe up 42". There is one 60" pipe out falls. Can details or direction be provided for the 60" outfall pipe guard?
Response: The guards are available for 60” pipe as well. Shop drawing approval will b required prior to ordering. Environmental Composites, Inc. (352) 343-3449 has been contacted to confirm any size can be fabricated.
Posted: 4/9/2020
Question: The "Minority and Women Owned Business Enterprises Certification Form" and "Minority and Women Owned Business Enterprises Officer Certification Form" are not in the bid documents, please provide these 2 forms if they are to be part of the package to submit at bid time.
Response: This will be covered under Question 36 of Addendum #6 which will be coming out soon. Copies of these forms will be included in Addendum 6 as well.
Posted: 4/14/2020
Question: With regards to pay item # 5 Demolition, Hauling and Disposal. Certain items will be taken to recycling facilities which may not have the capability to measure incoming loads, how will payment be made for those items without scale tickets?
Response: If contractor elects to recycle any material, contractor will need to provide supporting documentation for the weight of the material recycled. A Public Works Inspector will be assigned to the project and they will need to see all loads prior to transport to the recycler.
Posted: 4/14/2020
Question: May you provide the color code for the railing please