St. Johns River Water Management District Sealed Solicitation
Title: Second Call' Crane Creek M-1 Canal Restoration
Deadline: 12/1/2022 2:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: In Review
Solicitation Number: 38004-1
Description: The Work of this Project consists of the construction of six primary project elements:
1. An operable control structure within the M-1 Canal east of Evans Road, including pneumatic crest gates (weirs), concrete hardened flow channel, flow channel center dividing wall, flow attenuation blocks, foundations, rip rap, mechanical equipment, power supply and equipment, concrete slabs, instrumentation and controls, paving, grading, and other incidental work.
2. A stormwater pumping station, located east of I-95 adjacent to the M-1 Canal along Coastal Lane. Work includes intake structure and screens, intake piping and manholes, concrete wetwells, pumps, discharge piping, valves, pipe supports, power supply and equipment, concrete slabs and pavement, instrumentation and controls, paving, grading, and other incidental work.
3. A stormwater pumping station, located west of the St. Johns Heritage Parkway. Work includes intake structure and screens, intake piping and manholes, concrete wetwell, pumps, discharge piping, valves, pipe supports, power supply and equipment, concrete slabs and pavement, instrumentation and controls, paving, grading, and other incidental work.
4. A section of 24-inch-diameter underground high-density polyethylene (HDPE) stormwater force main from the east pump stations to the STA. Installation by horizontal directional drilling and open-cut trenching, valves, fittings, surface restoration, plantings to restore temporary construction easements and other project areas, a precast outfall structure into the STA, and other incidental work.
5. A section of 24-inch-diameter underground high-density polyethylene (HDPE) stormwater force main from the west pump station. Installation by horizontal directional drilling and open-cut trenching, valves, fittings, surface restoration, plantings to restore temporary construction easements and other project areas, an outfall structure north of 192, and other incidental work.
6. A stormwater treatment area (STA) west of the St. Johns Heritage Parkway. The STA will include earthwork for regrading slopes of an existing borrow pit, an access road, and other incidental work.
Pre-Bid Meeting Date: 11/15/2022 10:00 AM
Pre-Bid Meeting Details: A Mandatory Pre-Bid Conference is scheduled for November 15, 2022, at 10:00 a.m., at the District’s Palm Bay Service Center, located at 525 Community College Parkway, S.E., Palm Bay, FL 32909. Potential bidders may attend the conference in-person at the District’s Palm Bay Service Center or virtually by following the instructions below. Attendance either in person or virtually will satisfy the mandatory attendance requirement to qualify as bidder. Minutes of the conference will not be created. Instructions for virtual attendance at mandatory pre-bid conference: For MS TEAMS or Skype: Meeting ID 261 695 434 187 Passcode fECHsz Or audio only: Conference phone number 1-386-256-1151 Meeting ID 465 486 729
Documents:
Addition 1
Posted: 11/16/2022
Type of Addition: Pre-bid Meeting Sign in sheet
Solicitation #: 38004-1
Documents:
Addition 2
Posted: 11/18/2022
Type of Addition: Addendum
Overview: Addendum 1
Solicitation #: 38004-1
Documents:
Addition 3
Posted: 12/6/2022
Type of Addition: In Review
Overview: Notice of Intended Decision
Documents:
Posted: 11/16/2022
Type of Addition: Pre-bid Meeting Sign in sheet
Solicitation #: 38004-1
Documents:
Posted: 11/18/2022
Type of Addition: Addendum
Overview: Addendum 1
Solicitation #: 38004-1
Documents:
Posted: 12/6/2022
Type of Addition: In Review
Overview: Notice of Intended Decision