City of Daytona Beach Sealed Solicitation

Title: WESTSIDE REGIONAL WRF BIOSOlLDS DEWATERING SYSTEM IMPROVEMENTS

Deadline: 5/15/2020 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: ITB 20403

Description: The work generally consists of includes furnishing all labor, equipment, materials, and construction services to complete the project work as noted in the Project Documents.  The primary work includes installation of two 3-belt filter presses; two washwater pumps; two skid-mounted emulsion polymer blending units; one horizontal and one inclined shaftless screw conveyor; one shaftless screw truck unloading conveyor; all supporting concrete, structural walkways, supports, pipe, valves, pipe supports, and appurtenances; and all electrical and instrumentation controls at the Westside Regional Water Reclamation Facility.  


Pre-Bid Meeting Date: 4/9/2020 10:00 AM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.A Non-Mandatory Pre-Bid Conference will be conducted via teleconference, on April 9, 2020 at 10:00 AM. Interested Contractors please call 386-671-3178 no earlier than 9:45 AM. Please pre-register for this meeting online at www.codb.us/841/Purchasing. Click “Public Solicitations” link then select this solicitation.


Documents:

Documents as of 5/15/2020
ITB-20403_Westside Reg WRF Biosolids Dewatering Imps.pdf
ITB-20403_DRAWINGS_Westside Reg WRF Biosolids Dewatering.pdf
ITB-20403_BID_ITEM_SCHEDULE-Westside Reg WRF Biosolids Dewatering.xlsx
INVITATION-ITB-20403_Westside Reg WRF Biosolids Dewatering System Imps.pdf
Pre-Bid Tele-Conference Agenda 20403.pdf
PreBidSignUp-4_9_2020.pdf
Bid Tabulation.pdf
Addition 1

Posted: 4/1/2020

Type of Addition: Addendum 1

Overview: This addendum is hereby incorporated into the Bid Documents for the project referenced above. The following items are clarifications, corrections, additions, deletions and/or revisions to and shall take precedence over the original documents. Additions are indicated by underlining, deletions are indicated by strikethrough.

Solicitation #: ITB # 20403

Documents:

Addition 2

Posted: 4/2/2020

Type of Addition: Addendum 2

Overview: Answers to Bidders’ questions

Solicitation #: ITB 20403

Documents:

Addition 3

Posted: 4/14/2020

Type of Addition: Addendum 3

Overview: reschedule Friday's site visit to Wednesday, 4/15 at 11:00 AM.

Documents:

Addition 4

Posted: 4/17/2020

Type of Addition: Addendum 4

Overview: bid opening/due date change, question and answers.

Deadline: 5/8/2020 2:00 PM

Documents:

Addition 5

Posted: 4/30/2020

Type of Addition: Addendum 5

Overview: Answers Bidders' questions, provides missing and revised spec sections, includes Revised Bid Item Schedule

Deadline: 5/15/2020 2:00 PM

Solicitation #: 20403

Documents:

Addition 6

Posted: 5/4/2020

Type of Addition: Addendum 6

Overview: Provides spec Section 14900, resolves a conflict in Addendum 5.

Deadline: 5/15/2020 3:15 PM

Documents:

Addition 7

Posted: 5/8/2020

Type of Addition: Addendum 7

Overview: Answer final written questions, provide clarifications.

Deadline: 5/15/2020 2:45 PM

Solicitation #: 20403

Documents:

Addition 8

Posted: 5/12/2020

Type of Addition: Addendum 8

Overview: Corrects section number in Clarifications, provides legible version of Davis Bacon wage decision

Deadline: 5/15/2020 2:00 PM

Solicitation #: 20403

Documents:

Addition 9

Posted: 5/15/2020

Type of Addition: In Review

Addition 10

Posted: 8/7/2020

Type of Addition: Award Information

Addition 11

Posted: 8/7/2020

Type of Addition: Award Information

Overview:

Documents:

Question 1

Posted: 4/3/2020

Question: Per Section 14555, we request MLM Conveying Systems be named as an approved manufacturer. Due to this site note having the capability to provide the proposal, requested by the specifications, we will be sending the documents to all associated emails in the project information.

Response: We have already responded to this question. Please see the public solicitation.

Question 2

Posted: 4/8/2020

Question: Please confirm if the following documents are to be submitted with the bid for after the Issuance of Notice of Intent to Award. The Special Instructions indicate these documents should be submitted with the bid, however the Submittal Checklist implies they should be submitted after Issuance of Notice of Intent to Award. Attachment A - GFE Documentation Attachment B - MBE/WBE Contract Partificipation Attachment C- Bidder Employment Levels Attachment D - Subcontractor/Supplier Employment Levels a

Response: We have already responded to this question. Please see the public solicitation.

Question 3

Posted: 4/9/2020

Question: The phone number given for the Teleconference is ringing busy and will not connect. Please advise.

Response: Unfortunately, we only have 18 lines available to call in on and they maxed out for this call. Our Pre-Bid agenda is posted online through our website.

Question 4

Posted: 4/13/2020

Question: How does a contractor register for the scheduled site visit, 4/17/20 at 1pm?

Response: RSVP with company name, and the number a people attending to purchasing@codb.us

Question 5

Posted: 4/20/2020

Question: Does the City have its own MBE/WBE database of approved contractors for pricing to meet the 10% MBE/WBE participation requirement? The state database has very few local contractors that will participate.

Response: The City will accept M/WBE certification by any government agency, including the Office of Supplier Diversity. Demonstration of good faith efforts to obtain M/WBE contract participation is strictly voluntary and failure to demonstrate GFE will NOT render the bidder non-responsive

Question 6

Posted: 4/22/2020

Question: Can the contractor send a sample bucket to the City for collection of the sludge material to be dewatered, as well as collect a sample of the polymer suggested for use in solids dewatering?

Response: The City can provide a material sample as requested. Please provide the following: • Collection container (i.e. 5 gallon bucket) with appropriate pre-paid return shipping already filled out. Please provide a chain of custody if necessary. o The bucket can be sent to the attention of Jack Cheney at 3651 LPGA Blvd, Daytona Beach Fl • Collection instructions. Please note how much material you need and confirm the material (i.e. WAS). • Shipping instructions. Please note if there are any special instructions when shipping the container back, and if so, please provide the necessary materials.”

Question 7

Posted: 4/22/2020

Question: In Addendum 4, Question 3, your Answer states that there is Spec Section 14900 attached ... It was not ... Will you be uploading that section anytime soon?

Response: This section will be distributed via Addendum 5.

Question 8

Posted: 4/23/2020

Question: I am trying to Print/Save a copy of all of the Q & A's below, (1-7), and when I save or Print as a PDF, it is saved as gibberish and not what is seen on the screen. Please help.

Response: Addendum 5 will provide responses for questions posted online and is expected to be issued today, 4/24.

Posted: 4/1/2020

Type of Addition: Addendum 1

Overview: This addendum is hereby incorporated into the Bid Documents for the project referenced above. The following items are clarifications, corrections, additions, deletions and/or revisions to and shall take precedence over the original documents. Additions are indicated by underlining, deletions are indicated by strikethrough.

Solicitation #: ITB # 20403

Documents:

Posted: 4/2/2020

Type of Addition: Addendum 2

Overview: Answers to Bidders’ questions

Solicitation #: ITB 20403

Documents:

Posted: 4/14/2020

Type of Addition: Addendum 3

Overview: reschedule Friday's site visit to Wednesday, 4/15 at 11:00 AM.

Documents:

Posted: 4/17/2020

Type of Addition: Addendum 4

Overview: bid opening/due date change, question and answers.

Deadline: 5/8/2020 2:00 PM

Documents:

Posted: 4/30/2020

Type of Addition: Addendum 5

Overview: Answers Bidders' questions, provides missing and revised spec sections, includes Revised Bid Item Schedule

Deadline: 5/15/2020 2:00 PM

Solicitation #: 20403

Documents:

Posted: 5/4/2020

Type of Addition: Addendum 6

Overview: Provides spec Section 14900, resolves a conflict in Addendum 5.

Deadline: 5/15/2020 3:15 PM

Documents:

Posted: 5/8/2020

Type of Addition: Addendum 7

Overview: Answer final written questions, provide clarifications.

Deadline: 5/15/2020 2:45 PM

Solicitation #: 20403

Documents:

Posted: 5/12/2020

Type of Addition: Addendum 8

Overview: Corrects section number in Clarifications, provides legible version of Davis Bacon wage decision

Deadline: 5/15/2020 2:00 PM

Solicitation #: 20403

Documents:

Posted: 5/15/2020

Type of Addition: In Review

Posted: 8/7/2020

Type of Addition: Award Information

Posted: 8/7/2020

Type of Addition: Award Information

Overview:

Documents:

Posted: 4/3/2020

Question: Per Section 14555, we request MLM Conveying Systems be named as an approved manufacturer. Due to this site note having the capability to provide the proposal, requested by the specifications, we will be sending the documents to all associated emails in the project information.

Response: We have already responded to this question. Please see the public solicitation.

Posted: 4/8/2020

Question: Please confirm if the following documents are to be submitted with the bid for after the Issuance of Notice of Intent to Award. The Special Instructions indicate these documents should be submitted with the bid, however the Submittal Checklist implies they should be submitted after Issuance of Notice of Intent to Award. Attachment A - GFE Documentation Attachment B - MBE/WBE Contract Partificipation Attachment C- Bidder Employment Levels Attachment D - Subcontractor/Supplier Employment Levels a

Response: We have already responded to this question. Please see the public solicitation.

Posted: 4/9/2020

Question: The phone number given for the Teleconference is ringing busy and will not connect. Please advise.

Response: Unfortunately, we only have 18 lines available to call in on and they maxed out for this call. Our Pre-Bid agenda is posted online through our website.

Posted: 4/13/2020

Question: How does a contractor register for the scheduled site visit, 4/17/20 at 1pm?

Response: RSVP with company name, and the number a people attending to purchasing@codb.us

Posted: 4/20/2020

Question: Does the City have its own MBE/WBE database of approved contractors for pricing to meet the 10% MBE/WBE participation requirement? The state database has very few local contractors that will participate.

Response: The City will accept M/WBE certification by any government agency, including the Office of Supplier Diversity. Demonstration of good faith efforts to obtain M/WBE contract participation is strictly voluntary and failure to demonstrate GFE will NOT render the bidder non-responsive

Posted: 4/22/2020

Question: Can the contractor send a sample bucket to the City for collection of the sludge material to be dewatered, as well as collect a sample of the polymer suggested for use in solids dewatering?

Response: The City can provide a material sample as requested. Please provide the following: • Collection container (i.e. 5 gallon bucket) with appropriate pre-paid return shipping already filled out. Please provide a chain of custody if necessary. o The bucket can be sent to the attention of Jack Cheney at 3651 LPGA Blvd, Daytona Beach Fl • Collection instructions. Please note how much material you need and confirm the material (i.e. WAS). • Shipping instructions. Please note if there are any special instructions when shipping the container back, and if so, please provide the necessary materials.”

Posted: 4/22/2020

Question: In Addendum 4, Question 3, your Answer states that there is Spec Section 14900 attached ... It was not ... Will you be uploading that section anytime soon?

Response: This section will be distributed via Addendum 5.

Posted: 4/23/2020

Question: I am trying to Print/Save a copy of all of the Q & A's below, (1-7), and when I save or Print as a PDF, it is saved as gibberish and not what is seen on the screen. Please help.

Response: Addendum 5 will provide responses for questions posted online and is expected to be issued today, 4/24.