Central Florida Expressway Authority Sealed Solicitation

Title: SR 417 WIDENING FROM NARCOOSSEE ROAD TO SR 528; PROJECT 417-150

Deadline: 5/20/2021 1:30 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: ITB-001773

Description:

The work consists of providing all labor, materials, equipment and incidentals necessary to widened SR 417 from Narcoossee Road to SR 528 from four (4) general use lanes to six (6) general use lanes. All mainline bridges within the project limits including: OUC Railroad, Moss Park Road, Dowden Road, over the SR 417 SB to SR 528 EB ramp and over SR 528 will also be widened to accommodate the appropriate shoulder widths and additional general use lane. The work also includes, but is not limited to, construction of sound barriers, overhead sign structures and intelligent transportation systems infrastructure.


Pre-Bid Meeting Date: 4/14/2021 10:00 AM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.The purpose of the meeting will be to discuss requirements of the project in an open forum. Although not mandatory, attendance at the pre-bid meeting is highly recommended.


Documents:

Documents as of 4/5/2021
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents

PLANHOLDERS:

Date Company Name
4/5/2021 3:21:48 PM Kiewit Infrastructure South Co.
4/6/2021 10:00:45 AM Jacobs Engineering Group Inc.
4/6/2021 1:43:19 PM CFX
4/7/2021 10:52:20 AM A2B Engineering, LLC
4/7/2021 12:37:23 PM MIMS Construction Company
4/9/2021 11:34:25 AM Steel Dynamics Inc
4/9/2021 12:27:59 PM Veritas Steel LLC
4/9/2021 3:20:04 PM Keller North America, Inc.
4/10/2021 1:51:21 PM Janus Construction Corp.
4/12/2021 10:35:17 AM Kaya Associates, LLC
4/12/2021 10:57:18 AM Statewide Materials
4/13/2021 11:58:41 AM Watson Civil Construction, Inc.
4/13/2021 2:09:45 PM Independence Recycling
4/14/2021 12:38:11 PM NicNevol Engineering Services, Inc.
4/15/2021 3:28:51 PM Terracon Consultants, Inc.
4/16/2021 12:29:50 PM OHL USA, Inc
4/19/2021 11:18:49 AM Temple, Inc.
4/20/2021 11:15:39 PM KISSIMMEE B-LOGISTIC SERVICE INC
4/21/2021 2:01:55 PM Universal Signs & Accessories
4/21/2021 2:30:14 PM CFX
4/22/2021 2:11:32 PM Rogers Environmental, Inc.
4/22/2021 5:43:33 PM Blurock LLC
4/23/2021 9:21:17 AM Mrs.
4/24/2021 10:20:59 AM RS&H
4/26/2021 6:10:20 AM DS Brown Co
4/26/2021 12:33:34 PM Construction Bid Source
4/26/2021 3:38:06 PM Wilson Composites LLC
4/27/2021 8:25:41 AM The Balmoral Group
4/27/2021 3:46:45 PM Intertek/PSI (Professional Service Industries,Inc.)
5/4/2021 4:45:11 PM B & S Ironworks LLC
5/5/2021 1:59:06 PM TCB Trucking
5/6/2021 12:15:13 PM Zurich
5/9/2021 1:27:43 PM Statewide Materials
5/10/2021 8:23:05 AM Nadic Engineering Services, Inc.
5/10/2021 11:00:09 AM John B. Webb & Associates
5/11/2021 10:25:07 AM Concrete Cutting & Breaking Co.
5/12/2021 12:18:32 PM KBC CONSTRUCTION LLC
5/12/2021 1:00:05 PM JOMAR Constructors LLC
5/12/2021 4:07:13 PM H&M Electrical & Underground Utilities, Inc.
5/13/2021 8:46:20 AM Arrive Alive Traffic Control LLC
5/13/2021 9:56:17 AM Schnabel Foundation Co
5/13/2021 11:28:04 AM Surface preparation technologies llc
5/13/2021 3:13:08 PM Parsons
5/14/2021 8:53:40 AM La Costa Sod LLC
5/14/2021 11:05:34 AM RK&K
5/14/2021 12:13:55 PM CONTI LLC
5/14/2021 12:51:15 PM BEC
5/14/2021 12:56:16 PM TEG Engineering
5/14/2021 12:58:31 PM Consolidated Pipe & Supply Co., Inc.
5/14/2021 1:11:18 PM Lane Construction Corp.
5/14/2021 4:52:09 PM Florida Structural Steel
5/14/2021 5:06:21 PM On Point Surveying, Inc.
5/14/2021 8:28:20 PM AG Ltd
5/15/2021 11:43:44 AM Brevard Concrete Paving, Inc.
5/15/2021 8:41:41 PM Link Systems, LLC
5/17/2021 7:54:11 AM Southern Manufacturing/ Earnest Products
5/17/2021 7:59:55 AM SOUTHLAND CONSTRUCTION
5/17/2021 10:40:21 AM Dewberry Engineers Inc.
5/17/2021 12:43:25 PM Bob's Barricades, Inc.
5/17/2021 1:20:27 PM temple inc
5/17/2021 1:59:19 PM Maschmeyer
5/18/2021 8:32:37 AM Arrive Alive Traffic Control
5/18/2021 9:24:58 AM Central Florida Underground
5/18/2021 10:19:47 AM ABT inc.
5/18/2021 3:04:34 PM MIMS Construction
5/18/2021 4:21:34 PM Ion Electric, LLC
5/18/2021 5:26:17 PM ABC Rebar
5/19/2021 7:52:54 AM AWK Consulting Engineers
5/19/2021 9:28:19 AM Cosmec, Inc.
5/19/2021 11:40:33 AM under power corp
5/19/2021 2:05:45 PM Traffic Control Devices, LLC
5/19/2021 4:47:04 PM Pearls Construction, LLC
5/19/2021 9:23:43 PM GPI
5/20/2021 8:59:25 AM Southern Development & Construction
5/20/2021 9:26:20 AM Condotte America, Inc.
5/20/2021 9:41:52 AM RFE Construction & Fence Services, Inc
5/20/2021 10:02:59 AM SiteScope Inc.
5/20/2021 10:34:35 AM Seminole Masonry
5/20/2021 1:45:19 PM Tricon Precas LTD
5/20/2021 2:08:59 PM Traffic Control Products of Fl, Inc
5/20/2021 2:10:28 PM JC Machine Works Corp
5/20/2021 2:11:15 PM Elipsis Engineering & Consulting LLC
5/20/2021 2:11:38 PM Skanska USA Civil SE
5/20/2021 2:12:12 PM Junior Davis Construction Company, Inc.
5/20/2021 2:12:17 PM Ram Tool And Supply
5/20/2021 2:13:20 PM Tensor Engineering
5/20/2021 2:16:11 PM geotechnical foundations
5/20/2021 2:19:44 PM Chubb Surety
5/20/2021 2:19:58 PM BKW CONSTRUCTION LLC
5/20/2021 2:21:56 PM Consor
5/20/2021 2:23:50 PM A2 Group, Inc.
5/20/2021 2:33:44 PM OHL/Community Asphalt Cop
5/20/2021 2:59:03 PM ASAP Installations
5/20/2021 3:16:05 PM Skanska USA Civil Southeast Inc.
5/20/2021 3:26:56 PM Universal Engineering Science, LLC
5/20/2021 3:37:09 PM CEMEX
5/20/2021 3:53:50 PM Terracon
5/20/2021 4:03:23 PM Top Star Construction, LLC
5/20/2021 4:22:47 PM Standard Concrete Products, Inc.
5/20/2021 5:00:19 PM GLF Construction Corporation
5/20/2021 5:42:47 PM Blue Iron Foundations & Shoring LLC
5/20/2021 5:54:05 PM PSI
5/21/2021 7:06:53 AM Brevard Concrete Paving
5/21/2021 8:42:16 AM PCC
5/21/2021 8:51:43 AM Synergy Earth Systems, LLC
5/21/2021 10:34:04 AM UES
5/21/2021 1:24:42 PM MC Squared, Inc.
5/21/2021 5:07:19 PM The Lane Construction Corporation
5/22/2021 8:18:48 AM Granite Construction
5/22/2021 1:07:36 PM Cananea Consulting
5/24/2021 9:16:38 AM Moffatt & Nichol, Inc.
5/24/2021 10:33:14 AM Surface Preparation Technologies, LLC
5/25/2021 2:54:24 PM Maylor Foundation Contractors
5/25/2021 4:19:18 PM Shelby Erectors
5/25/2021 5:01:04 PM Archer Western Construction, LLC
5/26/2021 9:42:52 AM Daktronics, Inc.
5/26/2021 1:12:24 PM ConstructConnect
5/27/2021 7:41:27 AM Leware Construction Company
5/27/2021 8:39:07 AM Atlas Engineering Group Inc
5/27/2021 9:08:02 AM Harris Rebar
5/28/2021 7:44:26 AM SEMA Construction, Inc.
5/28/2021 11:28:55 AM A2 Group, Inc.
5/31/2021 1:46:33 PM EMSI
6/1/2021 1:04:35 PM Traffic Engineering and Management
6/1/2021 4:21:27 PM Scalar Consulting Group, Inc.
6/3/2021 8:57:40 AM Highway Safety Devices, Inc.
6/3/2021 9:43:38 AM D-MAC Industries Inc.
6/7/2021 12:04:54 PM Superior Roadway Services
6/7/2021 3:20:56 PM Cloverleaf Corporation
6/9/2021 8:47:18 AM GLF Construction
6/10/2021 12:11:50 PM Concrete Impressions of Florida, Inc.
6/10/2021 12:27:29 PM Precision Contracting Services, Inc.
6/10/2021 12:37:29 PM The Lane Construction Corporation
6/10/2021 12:40:24 PM Blount-Sanford Contracting Company, Inc.
6/10/2021 12:45:31 PM Turtle Infrastructure Partners, LLC
6/10/2021 12:59:29 PM Jr. Davis Construction Co., Inc.
6/10/2021 1:06:59 PM SEMA Construction, Inc.
6/10/2021 1:53:49 PM GLF Construction Corporation
6/10/2021 2:36:08 PM BCC Engineering, LLC
6/10/2021 3:24:52 PM BCC Engineering
6/10/2021 3:31:18 PM cdr environmental
6/10/2021 3:36:19 PM Dane Construction and Company, Inc.
6/10/2021 4:01:28 PM Dodge Data
6/10/2021 4:31:02 PM CFX
6/10/2021 5:00:23 PM Kimley-Horn and Associates, Inc.
6/10/2021 9:43:16 PM Montalvo Mejia Construction
6/11/2021 8:51:18 AM Cathcart Construction Company-Florida, LLC
6/11/2021 10:37:56 AM Kisinger Campo and Associates, Inc.
6/14/2021 1:38:19 PM Earth Wall Products
6/14/2021 2:05:46 PM RK&K (Rummel, Klepper & Kahl, LLP)
6/15/2021 10:46:42 AM vsl electrical signing lighting
6/15/2021 11:06:34 AM Horizon Engineering Group
6/15/2021 11:10:54 AM A2 Group, Inc.
6/15/2021 5:59:53 PM AJ General Construct.com
6/16/2021 9:34:20 AM Ferguson Water Works
6/18/2021 12:56:52 PM Prince Contracting, LLC
6/21/2021 1:16:09 PM SICE, Inc.
6/22/2021 8:51:31 AM Skanska USA Civil Southeast Inc.
6/22/2021 4:45:41 PM Smith Site Development South LLC
6/22/2021 6:19:07 PM Sacyr
6/23/2021 10:42:55 AM Skanska USA Civil Southeast
6/23/2021 3:26:08 PM McShea Contracting
6/24/2021 12:43:44 PM RK&K
6/25/2021 10:25:10 AM Southland Construction, Inc.
6/29/2021 10:28:55 AM MRM Construction LLC
6/29/2021 2:54:41 PM Nadic Engineering Services
7/8/2021 7:24:34 AM Transportation Systems Inc.
7/9/2021 10:30:54 AM Construction Journal
7/12/2021 1:56:12 PM Spring Precast LLC
7/16/2021 12:46:07 PM Atlantic Pipe Services, LLC
7/19/2021 10:00:41 AM SEMA Construction
7/19/2021 4:59:39 PM OHL USA
7/20/2021 1:55:34 PM Bob's Barricades
7/20/2021 7:11:17 PM Superior Construction Company Southeast, LLC
7/20/2021 11:01:05 PM Triple Crown Construction, LLC
7/21/2021 7:48:47 AM Lane Construction
7/21/2021 2:18:18 PM Mill-It Corporation
7/21/2021 4:58:43 PM Straight Edge COncrete LLC
7/22/2021 7:55:55 AM COLECON
7/22/2021 4:45:25 PM RAINBOW DISTRIBUTORS USA
7/22/2021 7:56:15 PM Florida Bridge and Transportation, Inc.
7/27/2021 8:58:56 AM United Signs and Signals
7/27/2021 2:40:52 PM DRMP
7/28/2021 11:34:44 AM ADS
7/29/2021 2:32:46 PM Gosalia Concrete Constructors, Inc.
7/30/2021 9:03:39 AM Middlesex Paving, LLC.
8/3/2021 7:44:00 AM Hubbard Construction Company
8/6/2021 3:06:06 PM Gibbs & Register, Inc.
8/11/2021 2:38:07 PM A.J. Murray & Sons, Inc.
8/16/2021 4:04:02 PM Penhall Company
8/20/2021 3:49:08 PM Granite Construction
8/24/2021 4:29:15 PM Reliable Constructors, Inc.
8/25/2021 10:08:06 AM Mehta and Associates, Inc.
9/15/2021 10:49:20 AM Sterling Enterprises
9/16/2021 4:38:26 PM A2 Group, Inc.
9/20/2021 11:21:55 AM Chinchor Electric, Inc.
9/20/2021 11:27:05 AM Absolute Line Technologies, Inc.
9/20/2021 2:48:09 PM Ledstar, Inc.
9/23/2021 7:19:38 AM Timmons Contracting Inc
9/27/2021 7:03:51 AM Redland Company
9/29/2021 4:17:46 PM Civil Site Engineering, Inc.
9/30/2021 11:56:15 AM County Materials
10/1/2021 12:33:00 PM Tierra, Inc.
10/6/2021 2:29:16 PM T.Y. Lin International
10/9/2021 4:58:49 PM RFx Analyst, Inc.
10/13/2021 9:18:21 AM Southeast Highway
10/14/2021 8:41:44 PM TranSystems
11/2/2021 2:06:55 PM Florida Industrial Electric
11/19/2021 11:04:01 AM Eco Partnering Innovations, LLC
12/2/2021 12:10:11 PM AngleRight Surveying, LLC
12/7/2021 10:34:27 AM Rampart Hydro Services, LP
12/10/2021 9:01:45 AM AECOM
12/10/2021 2:29:19 PM Kiewit Infrastructure South Co.
1/14/2022 7:04:57 PM CTI-Construction Testing & Inspection
2/4/2022 3:46:32 PM Garcia Civil Contractors, LLC
2/7/2022 4:08:20 PM Finishing Systems of Florida
2/8/2022 1:13:37 AM Porter Pipe Installation
2/15/2022 8:21:24 AM JB Supply LLC
3/17/2022 10:34:23 AM A2 Group, Inc.
4/6/2022 1:45:10 PM Ranger Construction Industries, Inc.
4/6/2022 8:15:43 PM BASE Consultants
5/17/2022 8:39:45 AM DRMP Inc.
5/17/2022 11:11:03 AM exp U.S. services inc
5/18/2022 1:34:26 PM Hubbard Construction Company
5/19/2022 10:08:22 AM Danton Hydroblasting
6/13/2022 3:50:26 PM KCG Transportation Services
7/12/2022 11:34:36 AM Deltek
7/18/2022 8:47:38 AM Scalar Consulting Group Inc.
8/11/2022 7:18:26 PM PMA
8/15/2022 3:13:07 PM Seminole Precast LLC
1/18/2023 2:18:39 PM Valtir, LLC
1/18/2023 6:12:38 PM Qualis Concrete LLC
3/29/2023 2:48:31 PM J. Mori Painting, Inc.
4/25/2023 10:37:33 AM Selective Construction
5/1/2023 11:26:46 AM The Reinforced Earth Company
6/2/2023 5:03:30 PM Sacyr Construction USA
7/18/2023 8:53:49 AM HDR
9/7/2023 10:07:16 AM Southern Striping Solutions, LLC.
10/1/2023 12:54:26 PM DRMP
10/17/2023 10:11:46 AM VHB
12/22/2023 4:12:05 PM Wavetronix, LLC
2/12/2024 3:04:41 AM PWXPress
2/16/2024 12:40:35 PM CDM Smith
2/29/2024 10:37:39 AM AECOM
4/10/2024 1:05:05 PM The Middlesex Corporation
4/10/2024 3:20:54 PM Dixie Lime And Stone Company
4/17/2024 11:37:23 AM Preferred Materials, Inc.
5/10/2024 3:57:55 PM C. Slagter Construction, Inc.
6/7/2024 7:16:09 AM Preferred Materials Inc
7/30/2024 3:50:26 PM Protean Design Group, Inc.
9/27/2024 9:37:26 AM DRMP Inc.
10/15/2024 7:57:36 AM Ardurra Group, Inc.
11/19/2024 2:18:25 PM Integrated Synergy Inc.
12/6/2024 9:38:56 AM Oglesby Construction Inc.
Addition 1

Posted: 4/5/2021

Type of Addition: 001773 Public Notice

Overview: 001773 Bid Opening 5/13/2021

Documents:

Addition 2

Posted: 4/14/2021

Type of Addition: PUBLIC NOTICE 001773

Overview: 001773 Pre-Bid Meeting Sign-In Sheet

Documents:

Addition 3

Posted: 4/23/2021

Type of Addition: Addendum No. 1

Overview:

This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated April 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 6 pages and the following attachments: Reference Documents (Project Roll Plot and KMZ files); Revised Plansheets; and New Plansheet.

Deadline: 5/20/2021 1:30 PM

Solicitation #: 001773

Documents:

Addition 4

Posted: 4/24/2021

Type of Addition: Addendum No. 1A

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated April 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 1 page.

Documents:

Addition 5

Posted: 5/7/2021

Type of Addition: Revised - Public Notice

Overview: Revised - Bid Opening Notice 5/20/2021

Documents:

Addition 6

Posted: 5/7/2021

Type of Addition: Addendum No. 2

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated April 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 9 pages and the following attachment: R.W. Summer General Requirements. Revised Plansheets and New Plansheets are included as separate documents.

Solicitation #: 001773

Documents:

Addition 7

Posted: 5/14/2021

Type of Addition: Addendum No. 3

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated April 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 16 pages and the following attachments: 417-150 Pavement Cores (Reference Document); Revised Bid Form; Fuel Adjustment Worksheet; Revised Plansheets; and New Plansheets are included as separate documents.

Solicitation #: 001773

Documents:

Addition 8

Posted: 5/20/2021

Type of Addition: In Review

Overview: The Bid Opening for SR 417 WIDENING FROM NARCOOSSEE ROAD TO SR 528; Project No. 417-150; ITB-001773 was held at a duly noticed meeting on Thursday, May 20, 2021, commencing at 1:30 p.m.

Documents:

Addition 9

Posted: 6/10/2021

Type of Addition: Bid Tabulation 001173

Overview:

Documents:

Addition 10

Posted: 6/10/2021

Type of Addition: Award Information

Overview: On June10, 2021 the CFX Board members awarded the Contract to the following firm, contingent upon final execution of the contract by both parties: Sacyr Construccion SA, Inc., 3191 Coral Way, Suite 510 Miami, Florida 33145

Amount: $92,279,567.00

Documents:

Posted: 4/5/2021

Type of Addition: 001773 Public Notice

Overview: 001773 Bid Opening 5/13/2021

Documents:

Posted: 4/14/2021

Type of Addition: PUBLIC NOTICE 001773

Overview: 001773 Pre-Bid Meeting Sign-In Sheet

Documents:

Posted: 4/23/2021

Type of Addition: Addendum No. 1

Overview:

This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated April 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 6 pages and the following attachments: Reference Documents (Project Roll Plot and KMZ files); Revised Plansheets; and New Plansheet.

Deadline: 5/20/2021 1:30 PM

Solicitation #: 001773

Documents:

Posted: 4/24/2021

Type of Addition: Addendum No. 1A

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated April 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 1 page.

Documents:

Posted: 5/7/2021

Type of Addition: Revised - Public Notice

Overview: Revised - Bid Opening Notice 5/20/2021

Documents:

Posted: 5/7/2021

Type of Addition: Addendum No. 2

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated April 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 9 pages and the following attachment: R.W. Summer General Requirements. Revised Plansheets and New Plansheets are included as separate documents.

Solicitation #: 001773

Documents:

Posted: 5/14/2021

Type of Addition: Addendum No. 3

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated April 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 16 pages and the following attachments: 417-150 Pavement Cores (Reference Document); Revised Bid Form; Fuel Adjustment Worksheet; Revised Plansheets; and New Plansheets are included as separate documents.

Solicitation #: 001773

Documents:

Posted: 5/20/2021

Type of Addition: In Review

Overview: The Bid Opening for SR 417 WIDENING FROM NARCOOSSEE ROAD TO SR 528; Project No. 417-150; ITB-001773 was held at a duly noticed meeting on Thursday, May 20, 2021, commencing at 1:30 p.m.

Documents:

Posted: 6/10/2021

Type of Addition: Bid Tabulation 001173

Overview:

Documents:

Posted: 6/10/2021

Type of Addition: Award Information

Overview: On June10, 2021 the CFX Board members awarded the Contract to the following firm, contingent upon final execution of the contract by both parties: Sacyr Construccion SA, Inc., 3191 Coral Way, Suite 510 Miami, Florida 33145

Amount: $92,279,567.00

Documents: