City of Callaway Sealed Solicitation

Title: CHERRY STREET RESURFACING, SIDEWALKS & DRAINAGE

Deadline: 6/1/2022 2:00 PM   (UTC-06:00) Central Time (US & Canada)

Status:

Solicitation Number: PW2022-09

Description: The project consists of approximately 1.5 miles of ADA compliant, six-foot wide pedestrian concrete sidewalk within the northern ROW and roadway reconstruction from Tyndall Parkway (US 98) to Star Avenue. Additional project components include residential and commercial driveway connections, crosswalk striping, signage, traffic signal loops at Berthe Avenue and coordination with simultaneous construction efforts from the Cherry Street Drainage infrastructure project (27655.01).


Pre-Bid Meeting Date: 5/16/2022 1:30 PM

Pre-Bid Meeting Details: Non-Mandatory


Documents:

Documents as of 5/24/2022
PW2022-09 Cherry Street Rehab Bid Packet.pdf
Plans - Cherry St. Drainage Infrastructure Tyndall Pkwy to Star.pdf
Cherry Street Construction Plans.pdf
Planholder List.pdf
Addendum 1 - Cherry Street Project.pdf
Addition 1

Posted: 6/6/2022

Type of Addition: In Review

Overview: One bid was received.

Addition 2

Posted: 2/28/2023

Type of Addition: No Action

Posted: 6/6/2022

Type of Addition: In Review

Overview: One bid was received.

Posted: 2/28/2023

Type of Addition: No Action