Arlington County Government Sealed Solicitation
Title: 21-DES-ITB-465 GRAVITY ONE – PHASE II – 24 INCH WATER MAIN PROJECT
Deadline: 1/7/2021 2:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: In Review
Solicitation Number: 21-DES-ITB-465
Description: Scope includes the installation of 24-inch water main for approximately 3,500 feet Northwards from Lorcom Lane (Via: N. Taylor Street – N. Utah Street – N. Vacation Lane – N. Vermont Street, N. Vernon Street) to the 30-inch PCCP supply main that is located at the eastern edge of the Lee Reservoir site (N. Vernon Street at 25th Street N.). The new 24-inch main will be connected to the Phase I - 24-inch main at the intersection of N. Taylor Street and N. Vacation Lane. Another connection will be to the 30-inch PCCP at the intersection of N. Vernon Street and 25th Street N. Work also includes installation of a new 8-Inch water main to replace existing 6-Inch water main along N. Vernon St. between 25th St N. and N. Vermont St and it is approximately 960 feet.
Pre-Bid Meeting Date: 12/15/2020 10:00 AM
Documents:
Addition 3
Posted: 1/8/2021
Type of Addition: Bid Tabulation
Documents:
Posted: 1/8/2021
Type of Addition: Bid Tabulation
Documents: