Arlington County Government Sealed Solicitation

Title: 21-DES-ITB-465 GRAVITY ONE – PHASE II – 24 INCH WATER MAIN PROJECT

Deadline: 1/7/2021 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: In Review

Solicitation Number: 21-DES-ITB-465

Description: Scope includes the installation of 24-inch water main for approximately 3,500 feet Northwards from Lorcom Lane (Via: N. Taylor Street – N. Utah Street – N. Vacation Lane – N. Vermont Street, N. Vernon Street) to the 30-inch PCCP supply main that is located at the eastern edge of the Lee Reservoir site (N. Vernon Street at 25th Street N.). The new 24-inch main will be connected to the Phase I - 24-inch main at the intersection of N. Taylor Street and N. Vacation Lane. Another connection will be to the 30-inch PCCP at the intersection of N. Vernon Street and 25th Street N. Work also includes installation of a new 8-Inch water main to replace existing 6-Inch water main along N. Vernon St. between 25th St N. and N. Vermont St and it is approximately 960 feet.


Pre-Bid Meeting Date: 12/15/2020 10:00 AM


Documents:

Documents as of 12/7/2020
21-DES-ITB-465 BID FORM.pdf
Attachment A - Pricing_Sheet.xlsx
21-DES-ITB-465 Gravity One - Phase II 24 Inch Water Main Project.pdf
Attachment B - Special Conditions Horizontal.pdf
Attachment C - 2019 Arlington County Construction Standards and Specifications.pdf
Attachment D - Supplemental Specifications Horizontal.pdf
Attachment E - Construction Drawings.pdf
Attachment F - Arlington County Materials Testing Specification Reference (September 2020).pdf
Attachment G - Test Hole Reports.pdf
Attachment H - Standard Pavement Restoration for Utility Cuts M-6.1.pdf
Attachment I - LDA and VHD Permit.pdf
Attachment J - Request For Information Form.pdf
Attachment K - Change Order Template.pdf
Attachment L - State and Federal Roads in Arlington County, VA.pdf
Addition 1

Posted: 12/15/2020

Type of Addition: Attendance Sheet

Documents:

Addition 2

Posted: 12/22/2020

Type of Addition: Addendum 1

Documents:

Addition 3

Posted: 1/8/2021

Type of Addition: Bid Tabulation

Documents:

Posted: 12/15/2020

Type of Addition: Attendance Sheet

Documents:

Posted: 12/22/2020

Type of Addition: Addendum 1

Documents:

Posted: 1/8/2021

Type of Addition: Bid Tabulation

Documents: