County of Beaufort Sealed Solicitation

Title: On-Call Construction Management/Construction Engineering & Inspection (CEI) Services

Deadline: 6/22/2022 3:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: In Review

Solicitation Number: RFQ 062222E

Description: It is the intent of Beaufort County to hire three (3) and possibly up to five (5) qualified consultants experienced in providing Construction Management/Construction Engineering and Inspection (CE&I) Services outlined herein. 


Pre-Bid Meeting Details: There will be no meeting


Documents:

Documents as of 5/23/2022
Login to view documents
Addition 1

Posted: 6/22/2022

Type of Addition: In Review

Addition 2

Posted: 9/12/2022

Type of Addition: Notice of Intent to Award

Overview: Notice of Intent to Award

Documents:

Question 1

Posted: 5/23/2022

Question: The RFQ indicates a limit of 15 double-sided printed pages. As this is to be an electronically-submitted response, is that equivalent to 30 single-sided PDF pages?

Response: Yes, that is correct

Question 2

Posted: 5/25/2022

Question: On page 19 of the RFQ it references “3. Experience and Qualifications of the Design Team.” Can you clarify if a design team is expected for this statement of qualifications?

Response: This should be the Experience and Qualifications of the Construction Management/CEI Team.

Question 3

Posted: 5/25/2022

Question: On page 1 of the RFQ it states that “A firm applying as a Prime will only be allowed as a subconsultant on another team as long as the role does not exceed 10% of contract value.” Can you clarify if a team can only be a subconsultant on one team or can be a subconsultant on multiple teams?

Response: A firm can be a subconsultant on multiple teams but the role for each specific team cannot exceed 10% of contract value.

Question 4

Posted: 6/1/2022

Question: Please confirm whether or not an 11x17-sized page can be utilized in a response and if so, if it counts as one or two pages.

Response: The file submission will be PDF format so all pages will be the same size and will count as 1 page.

Question 5

Posted: 6/8/2022

Question: On page 19 it states "Brief resumes of key individuals who would be assigned to the County’s program showing special experience in areas of value engineering". Is the County looking for certified Value Engineers to be submitted and/or the Construction Management/CEI Team to have value engineering experience?

Response: The County is not requiring certified Value Engineers. This applies to the Construction Management/CEI Team’s experience in value engineering.

Posted: 6/22/2022

Type of Addition: In Review

Posted: 9/12/2022

Type of Addition: Notice of Intent to Award

Overview: Notice of Intent to Award

Documents:

Posted: 5/23/2022

Question: The RFQ indicates a limit of 15 double-sided printed pages. As this is to be an electronically-submitted response, is that equivalent to 30 single-sided PDF pages?

Response: Yes, that is correct

Posted: 5/25/2022

Question: On page 19 of the RFQ it references “3. Experience and Qualifications of the Design Team.” Can you clarify if a design team is expected for this statement of qualifications?

Response: This should be the Experience and Qualifications of the Construction Management/CEI Team.

Posted: 5/25/2022

Question: On page 1 of the RFQ it states that “A firm applying as a Prime will only be allowed as a subconsultant on another team as long as the role does not exceed 10% of contract value.” Can you clarify if a team can only be a subconsultant on one team or can be a subconsultant on multiple teams?

Response: A firm can be a subconsultant on multiple teams but the role for each specific team cannot exceed 10% of contract value.

Posted: 6/1/2022

Question: Please confirm whether or not an 11x17-sized page can be utilized in a response and if so, if it counts as one or two pages.

Response: The file submission will be PDF format so all pages will be the same size and will count as 1 page.

Posted: 6/8/2022

Question: On page 19 it states "Brief resumes of key individuals who would be assigned to the County’s program showing special experience in areas of value engineering". Is the County looking for certified Value Engineers to be submitted and/or the Construction Management/CEI Team to have value engineering experience?

Response: The County is not requiring certified Value Engineers. This applies to the Construction Management/CEI Team’s experience in value engineering.