County of Escambia Quote
Title: Roof Repair for Prison Tool Shed
Deadline: 5/17/2022 3:00 PM (UTC-06:00) Central Time (US & Canada)
Status: Deadline Expired
Quote Number: FAC_HS_Prison Tool Shed_LB
Description:
1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers’ recommendations that apply.
2. Remove 300 SF of existing asphaltic 3-tab shingles and underlayment components down to the lumber decking. Edge metal (75 LF) and roof to wall flashings (15 LF) should also be removed and properly disposed of.
3. Once the existing roof system has been removed the lumber decking should be assessed for adverse moisture damages. Any damaged lumber should be removed and replaced with like kind and quality components. In addition to the lump sum bid, the contractor should include a unit price for lumber to accommodate for unforeseen deck conditions.
4. New synthetic underlayment (300 SF) should then be installed atop the lumber deck per manufacturer recommendations. Ensure the underlayment is positively lapped to prevent water bucking.
5. Install new aluminum edge metal (75 LF) along all rake lines and eaves. The underlayment should transition atop the edge metal at the eave or be stripped in with self-adhered membrane or roofing cement.
6. Install 300 SF of new architectural laminate shingles (aesthetics to be approved by owner) per manufacturer recommendations. Ensure fastener attachment patterns are adequate for uplift requirements.
The meeting will begin at the location indicated on the map below:
Documents:
Documents as of 4/11/2022 |
---|
Exhibit E_BID Permit App_Tool Shed.pdf |
Exhibit F_FEMA Clauses.pdf |
Exhibit R_Requirements for Non-Contract Insurance.pdf |
Addition 1
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Addition 2
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Additionally, replace Exhibit E with Exhibit K.
Documents:
Addition 3
Posted: 5/9/2022
Type of Addition: Addendum_Detailed Bid Tab
Documents:
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Additionally, replace Exhibit E with Exhibit K.
Documents:
Posted: 5/9/2022
Type of Addition: Addendum_Detailed Bid Tab
Documents: