Arlington County Government Sealed Solicitation

Title: 23-DPR-ITBPW-450 Arlington Junction Park

Deadline: 2/12/2024 2:30 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: 23-DPR-ITBPW-450

Description: For the provision of demolition of existing park and portion of 11th Street, proposed site work, stormwater management and metal bridge, walkways, a raised crosswalk across 11th Street, seating areas, a dog relief spot, custom site furnishing, signage/wayfinding pylons, mist emitting structures, boulder walls, bermed landscape beds and landscaping, irrigation and site lighting

and

the realignment of the east curb line to establish a street grade bike only lane on the east side of Eads Street between army navy drive and south 12th Street. The improvements include but are not limited to: installing sidewalks, constructing a boardwalk over existing tree roots, asphalt pavement, street lights, stormwater infrastructure improvements, landscaping, and VDOT informational signage installation. 


Pre-Bid Meeting Date: 1/10/2024 9:00 AM

Pre-Bid Meeting Details: A virtual prebid conference will be held at 9:00 a.m. on Wednesday, January 10th, 2024, on Microsoft Teams to allow potential Bidders an opportunity to obtain clarification of the specifications and requirements of the solicitation. To join the meeting, please click the link in the solicitation, or join by dialing +1 347-973-6905 and enter Conference ID 657 781 289#. ATTENDANCE AT THE PREBID CONFERENCE IS OPTIONAL. Minutes of the prebid conference will be recorded by the County and may be incorporated into the solicitation documents through an Addendum. Interested Bidders are, however, urged to attend.


Documents:

Documents as of 2/1/2024
23-DPR-ITB-450 Attachment B - Special Conditions Horizontal.pdf
23-DPR-ITB-450 Attachment C - CC13 Civil Design Plans.pdf
23-DPR-ITBPW-450 Attachment D - Arlington County RFI Form Template.pdf
23-DPR-ITBPW-450 Attachment E - Lane Closure Guidelines_NOVA Dist.pdf
23-DPR-ITBPW-450 Attachment F - Arlington County Master Transportation Plan.pdf
23-DPR-ITBPW-450 Attachment G - Arlington County Materials Testing Specification Reference.pdf
23-DPR-ITBPW-450 Attachment H - State and Federal Roads in Arlington County, VA.PDF
23-DPR-ITBPW-450 Attachment I - Arlington Junction Park Plan.pdf
23-DPR-ITBPW-450 Attachment J - Arlington Junction Park Project Manual.pdf
23-DPR-ITBPW-450 Attachment K - Geotechnical Engineering Report.pdf
23-DPR-ITBPW-450 Attachment L - Test Hole Data.pdf
23-DPR-ITBPW-450 Attachment M - South Parcel Pages from Geotechnical Engineering Report.pdf
23-DPR-ITBPW-450 Attachment N - Bidder Qualification Matrix.xlsx
23-DPR-ITBPW-450 Attachment O - Wage Determination.pdf
23-DPR-ITBPW-450.pdf
23-DPR-ITBPW-450 Addendum 1.pdf
Prebid Attendance.xlsx
L101 Revised.pdf
L110 Revised.pdf
L311A Revised.pdf
P315 Revised.pdf
23-DPR-ITBPW-450 Addendum 2.pdf
23-DPR-ITBPW-450 Attachment A - Pricing Sheet Revised.xlsx
Addition 1

Posted: 2/12/2024

Type of Addition: In Review

Documents:

Addition 2

Posted: 4/26/2024

Type of Addition: Award Information

Documents:

Question 1

Posted: 1/7/2024

Question: Can you please provide a better copy of the ITB file and bid forms? There seems to be a large empty space on the right hand side of every sheet currently provided. The pricing sheet also has a lot of errors that need to be corrected (totals, subtotals, category titles, etc.).

Response: Attachment A has been revised as of addendum 1

Question 2

Posted: 1/10/2024

Question: Do you have a suggested staging area you recommend?

Response: Please refer to addendum 1

Question 3

Posted: 1/10/2024

Question: Will the owner reimburse for existing utilities damaged if not shown on the plans?

Response: Please refer to addendum 1

Question 4

Posted: 1/10/2024

Question: Due to current supply chain issues, will the owner consider issuing a second NTP for delays due to material availability?

Response: Please refer to addendum 1

Question 5

Posted: 1/10/2024

Question: When actual conditions are different from the geotechnical report/information provided, will the contractor be entitled for additional compensation?

Response: Please refer to addendum 1

Question 6

Posted: 1/10/2024

Question: Please confirm that all work on plans of attachment I is paid for in lump sum (Tab 1 of the price sheet).

Response: Please refer to addendum 1

Question 7

Posted: 1/10/2024

Question: Is and LUP Permit required? If so, can you provide a budget cost for the LUP Estimate so we may factor in the bond cost?

Response: Please refer to addendum 1

Question 8

Posted: 1/10/2024

Question: Were the grass and topsoil necessary for the raised median MS-1A included in items 02800-C11-00020 & 02801-C11-00060?

Response: Please refer to addendum 1

Question 9

Posted: 1/10/2024

Question: Under which bid item will the demolition that is not incidental to the excavation be paid?

Response: Please refer to addendum 1

Question 10

Posted: 1/10/2024

Question: Under which bid item will the removal/relocation of existing pay station be paid?

Response: Please refer to addendum 1

Question 11

Posted: 1/10/2024

Question: Under which bid item will the demolition of the remaining foundation ad fixtures of Existing Pay Station not incidental to the excavation be paid?

Response: Please refer to addendum 1

Question 12

Posted: 1/10/2024

Question: There are two details for tree protection, please clarify which one must be used. If both are applicable, where should one or the other be installed.?

Response: Please refer to addendum 1

Question 13

Posted: 1/10/2024

Question: In the Parks & Recreation portion, there is some scope of work that indicates "Add Alternate," but in the bid pricing sheet it not indicated where to include those Add Alternate pricings.

Response: Please refer to addendum 1

Question 14

Posted: 1/10/2024

Question: What are the size ranges for the boulders?

Response: Please refer to addendum 1

Question 15

Posted: 1/10/2024

Question: Type L3 Linear LED fixture is referenced on Sheets L109, L110 & E.001. What are counts & distances required for the LED strips?

Response: Please refer to addendum 1

Question 16

Posted: 1/10/2024

Question: Type L3 Linear LED fixture is referenced on Sheets L109, L110 & E.001. What are counts & distances required for the LED strips?

Response: Please refer to addendum 1

Question 17

Posted: 1/10/2024

Question: Type L5 Power Pedestal is referenced on both L109 & L110. Is this the same product as that noted as Item 9 on Sheet L320? Additionally, the Site Plan (ES.001) does not depict any “Power Pedestal”. What are the details of this pedestal? Where are they located? How are they fed? What do they feed?

Response: Please refer to addendum 1

Question 18

Posted: 1/10/2024

Question: Will a revised pay item schedule be issued to include all park electrical work?

Response: Please refer to addendum 1

Question 19

Posted: 1/10/2024

Question: Please verify if the Grand Total Pricing Sheet, Grand Total DPR is for the Work Show and Reflected in plan set named Arlington Junction Park Plan.

Response: Please refer to addendum 1

Question 20

Posted: 1/10/2024

Question: There is an insufficient amount of time from advertisement to bid date with the number of specialties items required to bid. Will Arlington County please extend the bid date to provide adequate time to bid?

Response: The new bid close date is 2/12, please see addendum 1

Question 21

Posted: 1/10/2024

Question: The Bid Documents / Plans reference Bid Alternates for the Park Scope of work. The Pricing Sheets provided have no method to capture these alternates. Could the bid form be updated to reflect these alternative pricing requests.

Response: Please refer to addendum 1

Question 22

Posted: 1/11/2024

Question: Can the deadline for bid submission be extended given the amount of work needed for the preparation of the bid?

Response: The new bid close date is 2/12, please see addendum 1

Question 23

Posted: 1/11/2024

Question: How will the add alternates be measured and paid? will the bid form be revised?

Response: Please refer to addendum 1

Question 24

Posted: 1/11/2024

Question: Wil a sign in sheet from the pre-bid meeting be posted?

Response: This was attached with addendum 1

Question 25

Posted: 1/24/2024

Question: No pay item for ornamental grasses provided on plan sheet C091.1 of attachment C. Will a pay item be added to the price sheet?

Response: Please refer to addendum 2. The Pricing Sheet has been corrected

Question 26

Posted: 1/29/2024

Question: On the narrative of erosion & sediment control plan sheet C8.020 of attachment I, phase 1B reads "The contractor shall begin demolition of the existing building". Which building does this note refer to?

Response: Please refer to addendum 2.

Question 27

Posted: 1/30/2024

Question: Please indicate where the irrigation system will be connected to the water service? The plans only show water service for the mister and the dog fountain.

Response: Please refer to addendum 2.

Posted: 2/12/2024

Type of Addition: In Review

Documents:

Posted: 4/26/2024

Type of Addition: Award Information

Documents:

Posted: 1/7/2024

Question: Can you please provide a better copy of the ITB file and bid forms? There seems to be a large empty space on the right hand side of every sheet currently provided. The pricing sheet also has a lot of errors that need to be corrected (totals, subtotals, category titles, etc.).

Response: Attachment A has been revised as of addendum 1

Posted: 1/10/2024

Question: Do you have a suggested staging area you recommend?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Will the owner reimburse for existing utilities damaged if not shown on the plans?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Due to current supply chain issues, will the owner consider issuing a second NTP for delays due to material availability?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: When actual conditions are different from the geotechnical report/information provided, will the contractor be entitled for additional compensation?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Please confirm that all work on plans of attachment I is paid for in lump sum (Tab 1 of the price sheet).

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Is and LUP Permit required? If so, can you provide a budget cost for the LUP Estimate so we may factor in the bond cost?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Were the grass and topsoil necessary for the raised median MS-1A included in items 02800-C11-00020 & 02801-C11-00060?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Under which bid item will the demolition that is not incidental to the excavation be paid?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Under which bid item will the removal/relocation of existing pay station be paid?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Under which bid item will the demolition of the remaining foundation ad fixtures of Existing Pay Station not incidental to the excavation be paid?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: There are two details for tree protection, please clarify which one must be used. If both are applicable, where should one or the other be installed.?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: In the Parks & Recreation portion, there is some scope of work that indicates "Add Alternate," but in the bid pricing sheet it not indicated where to include those Add Alternate pricings.

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: What are the size ranges for the boulders?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Type L3 Linear LED fixture is referenced on Sheets L109, L110 & E.001. What are counts & distances required for the LED strips?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Type L3 Linear LED fixture is referenced on Sheets L109, L110 & E.001. What are counts & distances required for the LED strips?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Type L5 Power Pedestal is referenced on both L109 & L110. Is this the same product as that noted as Item 9 on Sheet L320? Additionally, the Site Plan (ES.001) does not depict any “Power Pedestal”. What are the details of this pedestal? Where are they located? How are they fed? What do they feed?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Will a revised pay item schedule be issued to include all park electrical work?

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: Please verify if the Grand Total Pricing Sheet, Grand Total DPR is for the Work Show and Reflected in plan set named Arlington Junction Park Plan.

Response: Please refer to addendum 1

Posted: 1/10/2024

Question: There is an insufficient amount of time from advertisement to bid date with the number of specialties items required to bid. Will Arlington County please extend the bid date to provide adequate time to bid?

Response: The new bid close date is 2/12, please see addendum 1

Posted: 1/10/2024

Question: The Bid Documents / Plans reference Bid Alternates for the Park Scope of work. The Pricing Sheets provided have no method to capture these alternates. Could the bid form be updated to reflect these alternative pricing requests.

Response: Please refer to addendum 1

Posted: 1/11/2024

Question: Can the deadline for bid submission be extended given the amount of work needed for the preparation of the bid?

Response: The new bid close date is 2/12, please see addendum 1

Posted: 1/11/2024

Question: How will the add alternates be measured and paid? will the bid form be revised?

Response: Please refer to addendum 1

Posted: 1/11/2024

Question: Wil a sign in sheet from the pre-bid meeting be posted?

Response: This was attached with addendum 1

Posted: 1/24/2024

Question: No pay item for ornamental grasses provided on plan sheet C091.1 of attachment C. Will a pay item be added to the price sheet?

Response: Please refer to addendum 2. The Pricing Sheet has been corrected

Posted: 1/29/2024

Question: On the narrative of erosion & sediment control plan sheet C8.020 of attachment I, phase 1B reads "The contractor shall begin demolition of the existing building". Which building does this note refer to?

Response: Please refer to addendum 2.

Posted: 1/30/2024

Question: Please indicate where the irrigation system will be connected to the water service? The plans only show water service for the mister and the dog fountain.

Response: Please refer to addendum 2.