City of Framingham/IPT Sealed Solicitation
Title: IFB#8704 Framingham Centralized Dispatch Filed sub bid for Tile
Deadline: 6/23/2025 1:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Deadline Expired
Solicitation Number: 8704
Description: The City of Framingham, through the Mayor of Framingham Massachusetts, the Awarding Authority invites sealed bids for IFB# 8704 Framingham Centralized Dispatch. The project consists of exterior and interior renovations to the existing office building and site at 188 concord street. the exterior building renovations involve improvements to the existing structural bracing and structural roof design and upgrades to the cladding, glazing, and wall and roof insulation assemblies. the interior upgrades involve renovating approximately 6,900 sf on the 3rd and 4th floors for a new regional dispatch and emergency communications center and upgrades to the common areas of the 1st and 2nd floor for accessibility. the exterior site renovations include modifications to the existing parking configuration for a new building generator, new accessible parking, and new EV charging stations.
Pre-Bid Meeting Date: 6/4/2025 10:00 AM
Pre-Bid Meeting Details: A pre-bid site visit will be held on Wednesday June 4, 2025 at 10:00 A.M. at 188 Concord Street. Meet at the rear parking lot.
Documents:
| Documents as of 5/28/2025 |
|---|
| Login to view documents |
PLANHOLDERS:
| Date | Company Name |
|---|---|
| 6/20/2025 5:39:56 PM | Deltek |
| 6/20/2025 8:30:58 PM | AG Ltd |
| 6/20/2025 10:00:54 PM | ConstructConnect |
| 6/23/2025 4:03:05 PM | GIBSON ROOFS, INC. |
| 6/24/2025 9:35:31 AM | Pavilion Floors, Inc. |
| 6/30/2025 10:46:23 AM | GVW, INC |
| 7/5/2025 5:46:40 PM | Dodge Data & Analytics |
Addition 1
Posted: 5/29/2025
Type of Addition: Addendum No.1
Overview: Estimated cost of project, bid docs separated plans, specs
Documents:
Addition 2
Posted: 5/29/2025
Type of Addition: Addendum NO.1 date should be May 29
Documents:
Addition 3
Posted: 6/17/2025
Type of Addition: Addendum #3
Overview: 1) Responses to questions – see attached
2) Revisions to drawings – see attached
3) Modifications to previously issued Addenda
a. Delete Specification Section 08 00 01 – Metal Windows
4) Revisions to specifications:
a. Modifications to Bidding Form 00000-4 for General Bid –see attached
Documents:
Addition 4
Posted: 6/20/2025
Type of Addition: Addendum #4
Overview: Addendum #3 Signature Page
Documents:
Addition 5
Posted: 6/23/2025
Type of Addition: #8704 - Framingham Centralized Dispatch Filed Sub Bid Opening Results
Overview: Sub Bid Opening Results - June 23, 2025
Documents:
Addition 6
Posted: 6/25/2025
Type of Addition: #8704 - Framingham Centralized Dispatch Filed Sub Bid Opening Results - June 24, 2025
Overview: Resilient Flooring, Painting, Fire Protection Systems, Plumbing, HVAC and Electrical
Documents:
Posted: 5/29/2025
Type of Addition: Addendum No.1
Overview: Estimated cost of project, bid docs separated plans, specs
Documents:
Posted: 5/29/2025
Type of Addition: Addendum NO.1 date should be May 29
Documents:
Posted: 6/17/2025
Type of Addition: Addendum #3
Overview: 1) Responses to questions – see attached
2) Revisions to drawings – see attached
3) Modifications to previously issued Addenda
a. Delete Specification Section 08 00 01 – Metal Windows
4) Revisions to specifications:
a. Modifications to Bidding Form 00000-4 for General Bid –see attached
Documents:
Posted: 6/20/2025
Type of Addition: Addendum #4
Overview: Addendum #3 Signature Page
Documents:
Posted: 6/23/2025
Type of Addition: #8704 - Framingham Centralized Dispatch Filed Sub Bid Opening Results
Overview: Sub Bid Opening Results - June 23, 2025
Documents:
Posted: 6/25/2025
Type of Addition: #8704 - Framingham Centralized Dispatch Filed Sub Bid Opening Results - June 24, 2025
Overview: Resilient Flooring, Painting, Fire Protection Systems, Plumbing, HVAC and Electrical
Documents: