St. Johns River Water Management District Open Until Resolved RFP
Title: Floating Dock & Gangway.
Deadline: 3/21/2023 12:00 PM (UTC-05:00) Eastern Time (US & Canada)
Status:
Solicitation Number: 38593
Description: The fabrication of an aluminum floating dock and gangway per the attached drawings. Installation is not required.
• Provide shop drawings for final approval prior to fabrication.
• Provide District with estimated fabrication and delivery schedule.
• Fabricate an 8’ x 30’ aluminum floating dock per the attached
drawing.
• Fabricate a 5’ by 30’ aluminum gangway per the attached drawings
Documents:
Documents as of 3/15/2023 |
---|
38593-QR Floating Dock & Gangway.pdf |
38593-Cost Schedule addendum #2.pdf |
38593-Drawings PG Note #1 2.pdf |
Addition 1
Posted: 3/14/2023
Type of Addition: Addendum
Overview:
First Coat (Primer): DURA-PLATE 235, 4-8 MILS DFT
Second (Final) Coat: DURA-PLATE 235, 4-8 MILS DFT
Color: Light Gray
The pile type does not need to be noted on the Cost Schedule but shall be shown on the shop drawings when submitted.
Deadline: 3/21/2023 12:00 PM
Solicitation #: 38593
Documents:
Addition 2
Posted: 3/15/2023
Type of Addition: Addendum #2
Overview: Drawings PG 2 Note #1 addendum.
Deadline: 3/21/2023 12:00 PM
Solicitation #: 38593
Documents:
Addition 3
Posted: 3/28/2023
Type of Addition: No Action
Posted: 3/14/2023
Type of Addition: Addendum
Overview:
First Coat (Primer): DURA-PLATE 235, 4-8 MILS DFT
Second (Final) Coat: DURA-PLATE 235, 4-8 MILS DFT
Color: Light Gray
The pile type does not need to be noted on the Cost Schedule but shall be shown on the shop drawings when submitted.
Deadline: 3/21/2023 12:00 PM
Solicitation #: 38593
Documents:
Posted: 3/15/2023
Type of Addition: Addendum #2
Overview: Drawings PG 2 Note #1 addendum.
Deadline: 3/21/2023 12:00 PM
Solicitation #: 38593
Documents:
Posted: 3/28/2023
Type of Addition: No Action