St. Johns River Water Management District Open Until Resolved RFP

Title: Floating Dock & Gangway.

Deadline: 3/21/2023 12:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status:

Solicitation Number: 38593

Description: The fabrication of an aluminum floating dock and gangway per the attached drawings. Installation is not required.

• Provide shop drawings for final approval prior to fabrication.

• Provide District with estimated fabrication and delivery schedule.

• Fabricate an 8’ x 30’ aluminum floating dock per the attached

drawing.

• Fabricate a 5’ by 30’ aluminum gangway per the attached drawings


Documents:

Documents as of 3/15/2023
38593-QR Floating Dock & Gangway.pdf
38593-Cost Schedule addendum #2.pdf
38593-Drawings PG Note #1 2.pdf
Addition 1

Posted: 3/14/2023

Type of Addition: Addendum

Overview:

Cost Schedule- addendum

*Piles shall be 8” diameter Schedule 40 aluminum per the drawings or 8” diameter Schedule 40 A53 Grade B Steel. If the steel pipe is chosen, the pipe shall be hot-dipped galvanized in accordance with ASTM A123 or painted as follows:
First Coat (Primer): DURA-PLATE 235, 4-8 MILS DFT
Second (Final) Coat: DURA-PLATE 235, 4-8 MILS DFT
Color: Light Gray
The pile type does not need to be noted on the Cost Schedule but shall be shown on the shop drawings when submitted.

Deadline: 3/21/2023 12:00 PM

Solicitation #: 38593

Documents:

Addition 2

Posted: 3/15/2023

Type of Addition: Addendum #2

Overview: Drawings PG 2 Note #1 addendum.

Under General Design Notes on Page 2 of the Construction Drawings, Note #1 is revised to indicate: The design live load for the gangway, landings and floating dock shall be 30 PSF.

Deadline: 3/21/2023 12:00 PM

Solicitation #: 38593

Documents:

Addition 3

Posted: 3/28/2023

Type of Addition: No Action

Posted: 3/14/2023

Type of Addition: Addendum

Overview:

Cost Schedule- addendum

*Piles shall be 8” diameter Schedule 40 aluminum per the drawings or 8” diameter Schedule 40 A53 Grade B Steel. If the steel pipe is chosen, the pipe shall be hot-dipped galvanized in accordance with ASTM A123 or painted as follows:
First Coat (Primer): DURA-PLATE 235, 4-8 MILS DFT
Second (Final) Coat: DURA-PLATE 235, 4-8 MILS DFT
Color: Light Gray
The pile type does not need to be noted on the Cost Schedule but shall be shown on the shop drawings when submitted.

Deadline: 3/21/2023 12:00 PM

Solicitation #: 38593

Documents:

Posted: 3/15/2023

Type of Addition: Addendum #2

Overview: Drawings PG 2 Note #1 addendum.

Under General Design Notes on Page 2 of the Construction Drawings, Note #1 is revised to indicate: The design live load for the gangway, landings and floating dock shall be 30 PSF.

Deadline: 3/21/2023 12:00 PM

Solicitation #: 38593

Documents:

Posted: 3/28/2023

Type of Addition: No Action