Lee College District Purchasing Dept. Sealed Solicitation

Title: Student Center Renovation & Addition

Deadline: 5/3/2022 1:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Awarded

Solicitation Number: 220503-01

Description: The Lee College District (“Lee College” or the “College”) is requesting Competitive Sealed Proposals for the Student Center Renovation & Addition project. The Proposer shall furnish all labor, materials, and equipment when performing all work.


All proposals must be uploaded to Vendor Registry by Tuesday, May 3, 2022, 10:00 AM. An optional pre-proposal meeting will be held at 10:00 AM on Wednesday, April 20 at 200 Lee Dr., Baytown Texas, 77520 Suite 216. The deadline for questions is Friday, April 22 at 5:00 PM. Questions regarding this solicitation shall be submitted via Vendor Registry.

For questions related to using Vendor Registry, use the help option/chat for assistance on their website. If you need further assistance, please contact lcsolicitations@lee.edu . Emailed and faxed proposals will not be accepted and will be returned unopened. Vendors will receive confirmation from Vendor Registry when their proposal is successfully received. In addition to your submittal on Vendor Registry, one (1) electronic version (flash drive/ USB) and two (2) sealed proposals, with pricing, shall be delivered to: P.O. BOX 818 Baytown, Texas 77520-0818. Hand deliver proposals to the Purchasing Department located at 200 Lee Dr., Suite RH 209, Baytown, Texas 77520. Mondays-Thursdays 7:30 am to 4:30 pm. Friday 7:30 am – 12:00pm.

The project consists of remodeling the Lee College's Student Center. In addition, the remodel includes working with, but not limited to; demolition, hazardous material abatement, concrete, masonry, metals electrical, communications / information technology, roofing, fire protection, carpentry, mechanical, plumbing, thermal and moisture protections. This project also includes all incidentals required for the completion of the project.

Upon recommendation of the proposal(s), the College Board of Regents plans to award a Contract; however, the College reserves the right to reject any and all proposals, to waive any and all irregularities and technicalities, and to accept any proposal(s) which it deems beneficial to it. Each proposer agrees to waive any claim it has or may have against the Owner, the Engineer, and their respective employees, arising out of or in connection, with the administration, evaluation, or recommendation of any bid.


Publication in Baytown Sun of CSP #1 = April 7, 2022
Publication in Baytown Sun of CSP #2 = April 14, 2022
Pre-Proposal Meeting = April 20, 2022 at 10:00 AM 
Deadline for Submission of Written Questions = April 22, 2022 at 5:00 PM 
Deadline for Submission of Written Answers = April 25, 2022 at 5:00 PM 
Due Date for Proposal Submission/Opening Proposal Meeting = May 3, 2022 at 10:00 AM 


Pre-Bid Meeting Date: 4/20/2022 10:00 AM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-proposal meeting. The meeting is optional and will be held at 200 Lee Dr. Suite 216., Baytown Texas, 77521.


Documents:

Documents as of 4/22/2022
Login to view documents
Login to view documents
Login to view documents
Login to view documents

PLANHOLDERS:

Date Company Name
4/7/2022 12:14:55 PM Portfolio Builders
4/7/2022 1:48:54 PM CMST, LLC
4/7/2022 1:51:51 PM Construction Managers of Southeast Texas
4/8/2022 11:40:51 AM Anslow Bryant Construction, Ltd.
4/11/2022 9:41:59 AM Progressive Commercial Aquatics
4/11/2022 10:26:15 AM MTM Builders Inc.
4/11/2022 2:17:00 PM FMG Construction Group, LLC
4/11/2022 2:47:41 PM Team Marathon Fitness, Inc.
4/11/2022 2:56:05 PM J R Jones Roofing & Waterproofing
4/11/2022 3:14:11 PM Construction Masters of Houston, Inc.
4/11/2022 3:30:56 PM Dunhill Development and Construction
4/11/2022 5:11:40 PM Satterfield & Pontikes Construction, Inc.
4/12/2022 7:44:56 AM Strategic Partnerships, Inc
4/12/2022 8:50:17 AM Randall Scott Architects
4/13/2022 7:53:42 AM Brookstone, LP
4/13/2022 7:56:11 AM Centennial Contractors
4/13/2022 8:02:31 AM Har-Con Mechanical LLC
4/13/2022 5:31:31 PM Interstate Restoration LLC
4/14/2022 11:44:31 AM QTO Solutions
4/18/2022 3:26:40 PM O'Donnell/Snider Construction
4/19/2022 9:39:04 AM AK Telecom, LLC
4/19/2022 10:32:15 AM Workplace Solutions
4/20/2022 3:10:55 PM CDI Technologies
4/21/2022 11:29:35 AM Livers Bronze Co.
4/25/2022 8:04:32 AM DT Construction, LP
4/26/2022 10:39:52 AM AGC of Southeast Texas
4/27/2022 7:08:47 AM Construction Journal
4/28/2022 7:58:14 AM East End Transfer & Storage
4/28/2022 10:04:39 AM Cook Mechanical
5/1/2022 10:22:27 AM Ad-centives
5/2/2022 11:01:24 AM Nash Industries Inc
5/3/2022 12:15:55 PM ConstructConnect
5/3/2022 4:52:00 PM E Contractors USA , LLC
5/3/2022 5:02:43 PM The Gonzalez Group
5/4/2022 7:24:38 AM Construction Journal
5/4/2022 7:55:32 AM Comex Corporation
5/4/2022 2:49:35 PM dodge data and analytics
5/6/2022 3:35:39 AM Dodge Data
5/6/2022 3:06:56 PM Generocity Services Inc.
5/25/2022 4:32:12 PM SMART Vending
6/1/2022 9:47:14 AM Virtual Builders Exchanges
6/14/2022 2:46:46 PM AAR Incorporated
1/10/2023 8:43:34 AM M Scott Construction
4/19/2023 8:22:05 AM Axis Builders, LLC
Addition 1

Posted: 4/25/2022

Type of Addition: Addendum 1

Overview: Addendum (1) one includes:


  1. Pre-proposal/ bid questions
  2. Pre-proposal conference sign in sheet
  3. Pre-proposal agenda
  4. Changes to drawings and specifications

Deadline: 5/3/2022 10:00 AM

Solicitation #: 220503-01

Documents:

Addition 2

Posted: 4/25/2022

Type of Addition: Addendum 2

Overview: PBK Professionals have submitted the following:
• responses to proposer/ bidder questions that have been posted on the question section of Vendor Registry
• changes to the specification and drawings

Deadline: 5/3/2022 10:00 AM

Solicitation #: 220503-01

Documents:

Addition 3

Posted: 5/3/2022

Type of Addition: Addendum 3

Overview: Addendum (3) three includes:


  • Time extension for May 3, 2022 at 1:00PM
  • Proposal Form Alternates Dollar line needs to be included in submission
 

Deadline: 5/3/2022 1:00 PM

Solicitation #: 220503-01

Documents:

Addition 4

Posted: 5/3/2022

Type of Addition: In Review

Overview: Lee College would like to thank all proposers for their submissions today. This project is currently in the evaluation stage. Please allow up to 30 days for an award notice. The sign-in sheet in reference to the Conference Opening and bid tabulation is now available. See attached.

Documents:

Addition 5

Posted: 5/3/2022

Type of Addition: In Review

Overview: Lee College would like to thank all proposers for their submissions today. This project is currently in the evaluation stage. Please allow up to 30 days for an award notice. The sign-in sheet in reference to the Conference Opening and bid tabulation is now available. See attached.

Documents:

Addition 6

Posted: 5/27/2022

Type of Addition: Award Information

Overview: Based on a thorough review and analysis of the submitted proposals, qualifications and references, Axis Builders, LLC has been awarded this project.

Amount: $4,677,839.00

Documents:

Question 1

Posted: 4/13/2022

Question: Who will be responsible for the cost of asbestos abatement should it be found? Please provide a copy of the completed survey.

Response: The cost of the asbestos abatement is to be included in the construction contract. The asbestos report has been issued in Addendum No. 01.

Question 2

Posted: 4/13/2022

Question: Sheet C-003 refers us to MEP for Electrical Demo and Rerouting. I did not find the work on the MEP drawings. Please advise.

Response: Missing sheet ES101 - Electrical Site Plan will be issued in forthcoming Addendum.

Question 3

Posted: 4/18/2022

Question: There were two sets of specs for Toilet Compartments. One requests Phenolic-Core Toilet Compartments and the other requests Plastic Toilet Compartments. Please let us know what to use.

Response: The toilet compartments are HPDE. Specification 10 21 13.17 for Phenolic Core Toilet Compartments is to be removed in it's entirety. Revise TOC and project manual will be issued in forthcoming Addendum.

Question 4

Posted: 4/18/2022

Question: Spec 27-51-23 Part2.1 - please confirm that these small conference rooms are to receive a wireless mic as opposed to a mic array.

Response: No wireless microphones in the small conference Rooms.

Question 5

Posted: 4/18/2022

Question: Spec 27-51-23 Part2.1 - please confirm that Crestron FT2-202 is adequate for the conference table.

Response: Confirmed, it is acceptable.

Question 6

Posted: 4/18/2022

Question: Spec 27-51-23 Part2.1 - please confirm Crestron flip-top is only in fixed conference room 116.2. Other spaces appear to have flex arrangements .

Response: Confirmed Creston Flip-Top is only in fixed conference room 116.2.

Question 7

Posted: 4/18/2022

Question: Spec 27-51-23 Part2.2 - please provide spec for ceiling mount microphone per T-000 item "W".

Response: Specification section provided in Addendum No. 02.

Question 8

Posted: 4/18/2022

Question: A-401 detail 12 shows a monitor in the Food Pantry (Rm115). Do we need to provide a video source for this monitor?

Response: Monitor is to be connected to PS at Admin desk.

Question 9

Posted: 4/18/2022

Question: FF201A shows Rm206 as a conference setup. Do we need to provide similar system like Rm116.2 conference room?

Response: Room 206 does not require a conference room set up.

Question 10

Posted: 4/18/2022

Question: TN-101B Rm116 has two huddle tables with monitors. Please confirm whether these need source signal or camera/mics

Response: Monitor to be existing. No source signal or additional equipment is needed.

Question 11

Posted: 4/18/2022

Question: Cameras for remote meeting capabilities in each meeting space?

Response: No cameras provided in the Conference Room or Multip Purpose Room on the first floor. Cameras provided in the Lecture Hall and Covestro Conference on the second floor.

Question 12

Posted: 4/18/2022

Question: Substitution - will AMX or Extron be acceptable alternates for Crestron?

Response: Alternatives are acceptable as long as the functionality of the system does not change.

Question 13

Posted: 4/21/2022

Question: Please confirm, as discussed in the pre-bid meeting that the the two (2) sealed proposals and one (1) flash drive submissions do not need to include pricing. It is acceptable to submit the pricing only through vendor registry.

Response: The two (2) sealed proposals and one (1) flash drive copies will require pricing. Please ensure your proposal/bid is submitted through vendor registry by the submittal date and time.

Question 14

Posted: 4/21/2022

Question: Sheet PD-102 has several locations where keynote 1 is used. We suggest an allowance be established for this work since the work required is unknown.

Response: For keyed note 1 please provide an allowance of $17,500 for rerouting and reconnecting the vent piping, water piping, and capping and providing a new roof vent.

Question 15

Posted: 4/21/2022

Question: Please provide a site plan showing the location of the temporary fence discussed in the pre-bid meeting.

Response: A site plan showing the construction fence will be issued in Addendum No. 2. It shows the construction fence while the Book Store remains open and once the Book Store closes.

Question 16

Posted: 4/21/2022

Question: (2) We need some clarification on the Plans/Specs as listed and shown on Plan Pages a. A101A b. A102 c. A806 i. Our questions are as follows: 1. On A101A there are 3 stairs shown – 2 on the Left & Right of the Open Space above going to the Enterprise Gallery #210, and one in the ‘back’ Stair 222. a. Are these stairs to have only WALL MOUNTED HANDRAILS, or do they have CABLE STYLE GUARDRAILS WITH HANDRAILS? 2. On A102 and details on A806, there is confusion as to what type of guardrail is desired. a. A806 calls out for GLASS type Guardrails b. A102 and A101A call out for “CABLE RAILS” Please clarify the design intent so that we may properly bid the job.

Response: The stairs to the left and the right of the Enterprise Gallery and Lobby will have wall mounted handrails. The back stair 222 will have cable style guardrails will handrails. The guardrail shown on A102 is the Mirage with Glass as shown in details A806 and specification section 05 73 00.

Question 17

Posted: 4/21/2022

Question: Please provide a spec. for the Fall Arrest System

Response: Specifications for the fall arrest system are provided in specification section 07 72 00 - Roof Accessories.

Question 18

Posted: 4/21/2022

Question: Proposal form does not have a section for Alternates. Please advise if we are to price the alternate shown in section 01 23 00.

Response: The alternates in section 01 23 00 are intended to be priced. The proposal form has been revised and will be issued with Addendum No. 2.

Question 19

Posted: 4/21/2022

Question: Please advise where specification sections 05 58 13-Column Covers and 05 77 00-Decorative Extruded Metal are used.

Response: Column covers are located on the second level, RE: A1.02. Decorative extruded metal details are included on AF-100.

Posted: 4/25/2022

Type of Addition: Addendum 1

Overview: Addendum (1) one includes:


  1. Pre-proposal/ bid questions
  2. Pre-proposal conference sign in sheet
  3. Pre-proposal agenda
  4. Changes to drawings and specifications

Deadline: 5/3/2022 10:00 AM

Solicitation #: 220503-01

Documents:

Posted: 4/25/2022

Type of Addition: Addendum 2

Overview: PBK Professionals have submitted the following:
• responses to proposer/ bidder questions that have been posted on the question section of Vendor Registry
• changes to the specification and drawings

Deadline: 5/3/2022 10:00 AM

Solicitation #: 220503-01

Documents:

Posted: 5/3/2022

Type of Addition: Addendum 3

Overview: Addendum (3) three includes:


  • Time extension for May 3, 2022 at 1:00PM
  • Proposal Form Alternates Dollar line needs to be included in submission
 

Deadline: 5/3/2022 1:00 PM

Solicitation #: 220503-01

Documents:

Posted: 5/3/2022

Type of Addition: In Review

Overview: Lee College would like to thank all proposers for their submissions today. This project is currently in the evaluation stage. Please allow up to 30 days for an award notice. The sign-in sheet in reference to the Conference Opening and bid tabulation is now available. See attached.

Documents:

Posted: 5/3/2022

Type of Addition: In Review

Overview: Lee College would like to thank all proposers for their submissions today. This project is currently in the evaluation stage. Please allow up to 30 days for an award notice. The sign-in sheet in reference to the Conference Opening and bid tabulation is now available. See attached.

Documents:

Posted: 5/27/2022

Type of Addition: Award Information

Overview: Based on a thorough review and analysis of the submitted proposals, qualifications and references, Axis Builders, LLC has been awarded this project.

Amount: $4,677,839.00

Documents:

Posted: 4/13/2022

Question: Who will be responsible for the cost of asbestos abatement should it be found? Please provide a copy of the completed survey.

Response: The cost of the asbestos abatement is to be included in the construction contract. The asbestos report has been issued in Addendum No. 01.

Posted: 4/13/2022

Question: Sheet C-003 refers us to MEP for Electrical Demo and Rerouting. I did not find the work on the MEP drawings. Please advise.

Response: Missing sheet ES101 - Electrical Site Plan will be issued in forthcoming Addendum.

Posted: 4/18/2022

Question: There were two sets of specs for Toilet Compartments. One requests Phenolic-Core Toilet Compartments and the other requests Plastic Toilet Compartments. Please let us know what to use.

Response: The toilet compartments are HPDE. Specification 10 21 13.17 for Phenolic Core Toilet Compartments is to be removed in it's entirety. Revise TOC and project manual will be issued in forthcoming Addendum.

Posted: 4/18/2022

Question: Spec 27-51-23 Part2.1 - please confirm that these small conference rooms are to receive a wireless mic as opposed to a mic array.

Response: No wireless microphones in the small conference Rooms.

Posted: 4/18/2022

Question: Spec 27-51-23 Part2.1 - please confirm that Crestron FT2-202 is adequate for the conference table.

Response: Confirmed, it is acceptable.

Posted: 4/18/2022

Question: Spec 27-51-23 Part2.1 - please confirm Crestron flip-top is only in fixed conference room 116.2. Other spaces appear to have flex arrangements .

Response: Confirmed Creston Flip-Top is only in fixed conference room 116.2.

Posted: 4/18/2022

Question: Spec 27-51-23 Part2.2 - please provide spec for ceiling mount microphone per T-000 item "W".

Response: Specification section provided in Addendum No. 02.

Posted: 4/18/2022

Question: A-401 detail 12 shows a monitor in the Food Pantry (Rm115). Do we need to provide a video source for this monitor?

Response: Monitor is to be connected to PS at Admin desk.

Posted: 4/18/2022

Question: FF201A shows Rm206 as a conference setup. Do we need to provide similar system like Rm116.2 conference room?

Response: Room 206 does not require a conference room set up.

Posted: 4/18/2022

Question: TN-101B Rm116 has two huddle tables with monitors. Please confirm whether these need source signal or camera/mics

Response: Monitor to be existing. No source signal or additional equipment is needed.

Posted: 4/18/2022

Question: Cameras for remote meeting capabilities in each meeting space?

Response: No cameras provided in the Conference Room or Multip Purpose Room on the first floor. Cameras provided in the Lecture Hall and Covestro Conference on the second floor.

Posted: 4/18/2022

Question: Substitution - will AMX or Extron be acceptable alternates for Crestron?

Response: Alternatives are acceptable as long as the functionality of the system does not change.

Posted: 4/21/2022

Question: Please confirm, as discussed in the pre-bid meeting that the the two (2) sealed proposals and one (1) flash drive submissions do not need to include pricing. It is acceptable to submit the pricing only through vendor registry.

Response: The two (2) sealed proposals and one (1) flash drive copies will require pricing. Please ensure your proposal/bid is submitted through vendor registry by the submittal date and time.

Posted: 4/21/2022

Question: Sheet PD-102 has several locations where keynote 1 is used. We suggest an allowance be established for this work since the work required is unknown.

Response: For keyed note 1 please provide an allowance of $17,500 for rerouting and reconnecting the vent piping, water piping, and capping and providing a new roof vent.

Posted: 4/21/2022

Question: Please provide a site plan showing the location of the temporary fence discussed in the pre-bid meeting.

Response: A site plan showing the construction fence will be issued in Addendum No. 2. It shows the construction fence while the Book Store remains open and once the Book Store closes.

Posted: 4/21/2022

Question: (2) We need some clarification on the Plans/Specs as listed and shown on Plan Pages a. A101A b. A102 c. A806 i. Our questions are as follows: 1. On A101A there are 3 stairs shown – 2 on the Left & Right of the Open Space above going to the Enterprise Gallery #210, and one in the ‘back’ Stair 222. a. Are these stairs to have only WALL MOUNTED HANDRAILS, or do they have CABLE STYLE GUARDRAILS WITH HANDRAILS? 2. On A102 and details on A806, there is confusion as to what type of guardrail is desired. a. A806 calls out for GLASS type Guardrails b. A102 and A101A call out for “CABLE RAILS” Please clarify the design intent so that we may properly bid the job.

Response: The stairs to the left and the right of the Enterprise Gallery and Lobby will have wall mounted handrails. The back stair 222 will have cable style guardrails will handrails. The guardrail shown on A102 is the Mirage with Glass as shown in details A806 and specification section 05 73 00.

Posted: 4/21/2022

Question: Please provide a spec. for the Fall Arrest System

Response: Specifications for the fall arrest system are provided in specification section 07 72 00 - Roof Accessories.

Posted: 4/21/2022

Question: Proposal form does not have a section for Alternates. Please advise if we are to price the alternate shown in section 01 23 00.

Response: The alternates in section 01 23 00 are intended to be priced. The proposal form has been revised and will be issued with Addendum No. 2.

Posted: 4/21/2022

Question: Please advise where specification sections 05 58 13-Column Covers and 05 77 00-Decorative Extruded Metal are used.

Response: Column covers are located on the second level, RE: A1.02. Decorative extruded metal details are included on AF-100.