Indian River County Sealed Solicitation

Title: RFI for Utilities Construction Standards

Deadline: 10/7/2024 11:00 AM   (UTC-05:00) Eastern Time (US & Canada)

Status: Open

Description: After a comprehensive review, Utility Engineering and Operations staff revised the May 2019 Construction Standards. The Draft Construction Standards, September 2024 edition, are ready for review by the public. The intent and technical integrity of the document provides a minimum standard and serves as a guide for the construction of water, wastewater and reclaimed water utilities.  


Documents:

Documents as of 9/6/2024
Memo_for_Builders_2024.pdf
2023_IRCDUS_ConstStdDwg_23_0929.pdf
02_M_16_Revision_Key.pdf
24_0715_LS_Final.pdf
IRCDUS_Lift_Station_Details_Set.pdf
Section_10_WastewaterPumpingStation24_0715.pdf
2024_Specs_PDF.pdf