City of Daytona Beach Sealed Solicitation

Title: SWEETHEART TRAIL - BALLOUGH ROAD BRIDGE REBID-ITB

Deadline: 10/28/2019 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: 20063

Description: The work limits are along Ballough Road, from the south side of Anita Avenue to the north side of Root Street, approximately 0.18 miles in length. The project consists of re-striping Ballough Road to provide a 10 to 11-foot-wide shared used path with a 5-foot buffer. The existing on-street parking will be eliminated and the existing travel lanes will be shifted to accommodate the shared use path along the east side of Ballough Road. Additional improvements include mobilization, maintenance of traffic, clearing and grubbing, excavation, signing, striping, delineators, detectable warning surfaces, and curb ramps. All pedestrian facilities shall adhere to current ADA standards.


Pre-Bid Meeting Date: 10/21/2019 10:00 AM

Pre-Bid Meeting Details: A NON-MANDATORY PRE-PROPOSAL CONFERENCE will be held at the Daytona Beach Public Works, 950 Bellevue Avenue #500, Daytona Beach, Florida 32114, on 10/21/2019 at 10:00 AM. Interested contractors are urged to attend.


Documents:

Documents as of 11/13/2019
ITB 20063-Sweetheart Trail-Ballough Bridge.pdf
ITB_INVITATION_20063.pdf
ITB-PLANS_Sweetheart Trail Ballough Rd Final Plan Submission Signed.pdf
PRE-BID SIGN IN SHEET #20063.pdf
BID TAB ITB_ 20063 .pdf
NOTICE OF INTENT TO AWARD 2018.doc
Addition 1

Posted: 10/28/2019

Type of Addition: In Review

Addition 2

Posted: 12/31/2019

Type of Addition: Award Information

Documents:

Posted: 10/28/2019

Type of Addition: In Review

Posted: 12/31/2019

Type of Addition: Award Information

Documents: