County of Escambia Quote
Title: Roof Repair for Road Prison AC Filter/Storage Shed
Deadline: 5/17/2022 11:30 AM (UTC-06:00) Central Time (US & Canada)
Status: Deadline Expired
Quote Number: FAC_HS_Prison AC Filter Shed_LB
Description: Shingle Roof Repair for Road Prison AC Filter Storage
1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept
in a watertight/temperature safe environment prior to installation as per all manufacturers’
recommendations that apply.
2. Remove the 350 SF of existing asphaltic 3-tab shingles and underlayment components down to the
lumber decking. 80 LF of edge metal components should also be removed and properly disposed
of. Remove and dispose of 25 LF of existing ridge cap.
3. Once the existing roof system has been removed the lumber decking should be assessed for
adverse moisture damages. Any damaged lumber should be removed and replaced with like kind
and quality components. In addition to the lump sum bid, the contractor should include a unit
price for lumber to accommodate for unforeseen deck conditions.
4. New synthetic underlayment (350 SF) should then be installed atop the lumber deck per
manufacturer recommendations. Ensure the underlayment is positively lapped to prevent water
bucking.
5. Install new aluminum edge metal (80 LF) along all rake lines and eaves. The underlayment should
transition atop the edge metal at the eave or be stripped in with self-adhered membrane or roofing
cement.
6. Install 350 SF of new architectural laminate shingles (aesthetics to be approved by owner) per
manufacturer recommendations. Ensure fastener attachment patterns are adequate for uplift
requirements (6 fasteners recommended).
The meeting will begin at the location indicated on the map below:
Documents:
Documents as of 4/11/2022 |
---|
Exhibit E_BID Permit App_AC Filter Mower Shed.pdf |
Exhibit F_FEMA Clauses.pdf |
Exhibit R_Requirements for Non-Contract Insurance.pdf |
Addition 1
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Addition 2
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Addition 3
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Addition 4
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Additionally, replace Exhibit E with Exhibit K.
Documents:
Addition 5
Posted: 5/9/2022
Type of Addition: Addendum_Detailed Bid Tab
Documents:
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Additionally, replace Exhibit E with Exhibit K.
Documents:
Posted: 5/9/2022
Type of Addition: Addendum_Detailed Bid Tab
Documents: