Spartanburg County School District 7 Sealed Solicitation

Title: Roof Repair at McCarthy Teszler School

Deadline: 8/29/2019 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Solicitation Number: IFB #19-20-2 ( Project #2019-76)

Description:

Base Bid scope of work includes the removal and demolition of all components necessary
for the preparation of the existing metal roof panel system as required to install a new
insulation system and mechanically attached thermoplastic roof membrane. The scope of
work also includes the demolition and removal of the existing built-in / concealed gutter
system and associated components for the replacement with a new external gutter system
and associated components.


Pre-Bid Meeting Date: 8/15/2019 9:30 AM

Pre-Bid Meeting Details: Mandatory Pre-Bid Conference


Documents:

Documents as of 8/1/2019
IFB #19-20-2 Parsons Facility at Mccarthy Teszler School Roof Repair Construction Documents.pdf
Addition 1

Posted: 8/16/2019

Type of Addition: Addendum #1

Solicitation #: IFB #19-20-2

Documents:

Posted: 8/16/2019

Type of Addition: Addendum #1

Solicitation #: IFB #19-20-2

Documents: