SPEC 1 GENERAL SCOPE

1.     Wentzville RIV School District (hereinafter “District”) is seeking Proposals for the purchase and implementation of a “District Access Control System” for 21 school buildings from reputable companies, for the purpose of enhancing school safety for both students and staff.  
2.     Currently the District has 21 School Buildings; 13 Elementary, 3 High Schools, 3 Middle Schools, 1 Early Childhood, 1 Alternative Program, 1 Mind Development Center
3.     The District is opening one new high school in the fall of 2021 (North Point High School)
4.     The District is opening one new middle school in the fall of 2022
5.     Total of 1,379 Certified Staff
6.     Total of 1,317 Support Staff
7.     Other Buildings: Administrative Center, Administrative Annex, Transportation, Support Services, Berrey-Place Center, Support Services, Harris Building


Pre-Bid Meeting Date: 12/28/2020 9:30 AM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting. PRE BID WALK THROUGH Date: December 28, 2020 Time: 9:30 AM CST Location Meet Up: 101 Support Services Drive, Wentzville, MO 63385


Documents:

Documents as of 1/4/2021
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Addition 1

Posted: 12/17/2020

Type of Addition: questions answered

Addition 2

Posted: 12/30/2020

Type of Addition: Addendum 1 - INTERVIEW DATE

Overview: Note - Correction to interview date.  Interviews will NOT be conducted January 4 - 7, 2021 but will be at a later date TBD in February 2021.

Addition 3

Posted: 1/4/2021

Type of Addition: Addendum 3

Overview: District maps and info on protential inveiws TBD.

Documents:

Addition 4

Posted: 1/8/2021

Type of Addition: In Review

Addition 5

Posted: 11/2/2021

Type of Addition: No Action

Addition 6

Posted: 12/28/2021

Type of Addition: Award Information

Overview: Tech Electronics - see board memo

Documents:

Question 1

Posted: 12/14/2020

Question: This appears to be a sole source bid that will only accept Mercury hardware in the design specifications. Is this correct? Or is this bid open to other manufacturers?

Response: Mercury hardware works with many programs and prevents the sole source.

Question 2

Posted: 12/15/2020

Question:

Response: We have already responded to this question. Please see the public solicitation.

Question 3

Posted: 12/16/2020

Question: Is this Pre-bid meeting mandatory or voluntary?

Response: The walkthrough is not mandatory but is recommended.

Question 4

Posted: 12/21/2020

Question: 1. Spec 5 outlines virtual presentations, but these appear to be scheduled prior to the bid due date. • How are these vendors selected for interviews prior to bid? 2. Spec 12, 2.1, C, 3, e; states “The software shall provide Visitor Management Module for up to 250,000 visitors annually”. However, Visitor Management is also a separate RFP and it is stated in Spec 5, 4; “The District may select one vendor for the “Visitor Management System” and one vendor for the “Access Door System” and yet another for a “Camera System” or any combination thereof”. In addition; Spec 3, 3, 3C; requests product information from the Visitor Management and its capabilities and integration. • Is the visitor management system required to be a component of the Access Control software, or is a separate (but integrated) system acceptable? 3. Spec 12, 2.1, H, 10; indicates credential types. How many of each type should be included in this quote? 4. Spec 13, 3.10 says “Provide system server per specification”, but no other details are provided. • Will the access control server be owner provided or should it be provided under this scope? • If contractor provided, is this server to be located on premise or is cloud hosted an option? • Will the District IT Team support updates to an on premise server or is that the responsibility of the contractor? 5. Spec 13, 3.10 references a Door Hardware Appendix A that was not included as part of this bid package. A pdf titled “DISTRICT DOORS” was provided listing doors and hardware without explanation. • What do the A, E, and R/R notes on the DISTRICT DOORS spreadsheet indicate? (Add, Existing, Repair/Replace)? • Aiphone intercoms are indicated on this spreadsheet. o Are they existing or provided under this scope? o Will door release via Aiphone be required? 6. Spec 1 General Scope: States 21 buildings, but lists 22 plus an additional 8. There is also the Parents as Teachers & IT listed on the door list but not the bid form, making the total 31. There are 30 buildings listed on the Bid Form. Please clarify scope per questions #7 & 8 below. 7. Multiple sites on the Bid Form are not on the DISTRICT DOORS spreadsheet; Please provide door list and information for the following sites: o Journey Elementary o Holt High Athletic Storage o Dist. Grounds Building o North Point High School o Annex Warehouse o Berrey-Place (N. Campus) 8. Parents as Teachers & IT is listed on the DISTRICT DOORS spreadsheet but not the bid form. • Please clarify if this should be included in bid. 9. Will floor plans be provided showing door locations in each of buildings?

Response: Question Asked: 1. Spec 5 outlines virtual presentations, but these appear to be scheduled prior to the bid due date. • How are these vendors selected for interviews prior to bid? The vendor will be selected to do a virtual interview based on the information that the vendor sends in the bid packet. The safety committee will be going through the vendor proposal and selecting such vendors. 2. Spec 12, 2.1, C, 3, e; states “The software shall provide Visitor Management Module for up to 250,000 visitors annually”. However, Visitor Management is also a separate RFP and it is stated in Spec 5, 4; “The District may select one vendor for the “Visitor Management System” and one vendor for the “Access Door System” and yet another for a “Camera System” or any combination thereof”. In addition; Spec 3, 3, 3C; requests product information from the Visitor Management and its capabilities and integration. • Is the visitor management system required to be a component of the Access Control software, or is a separate (but integrated) system acceptable? The visitor management system can be its own or it can be a system that is capable of doing both. 3. Spec 12, 2.1, H, 10; indicates credential types. How many of each type should be included in this quote? Generally, three 4. Spec 13, 3.10 says “Provide system server per specification”, but no other details are provided. • Will the access control server be owner provided or should it be provided under this scope? • If contractor provided, is this server to be located on premise or is cloud hosted an option? • Will the District IT Team support updates to an on premise server or is that the responsibility of the contractor? WILL BE ANSWERED SOON – WAITING FOR CONFIRMATION FROM IT DEPT 5. Spec 13, 3.10 references a Door Hardware Appendix A that was not included as part of this bid package. A pdf titled “DISTRICT DOORS” was provided listing doors and hardware without explanation. • What do the A, E, and R/R notes on the DISTRICT DOORS spreadsheet indicate? (Add, Existing, Repair/Replace)? • Aiphone intercoms are indicated on this spreadsheet. o Are they existing or provided under this scope? o Will door release via Aiphone be required? The door packet is the minimum door that we plan to do and build up to every door. If the district choses to do all the doors, this list will change.The hardware of the doors is what we have and the vendor’s system must work with our hardware. If you cannot supply a system you must note replacement to the hardware. Aiphone is part of our hardware. 6. Spec 1 General Scope: States 21 buildings, but lists 22 plus an additional 8. There is also the Parents as Teachers & IT listed on the door list but not the bid form, making the total 31. There are 30 buildings listed on the Bid Form. Parents teacher is the same building as the I.T (Berry-Place) Please clarify scope per questions #7 & 8 below. 7. Multiple sites on the Bid Form are not on the DISTRICT DOORS spreadsheet; Please provide door list and information for the following sites: o Journey Elementary o Holt High Athletic Storage o Dist. Grounds Building o North Point High School o Annex Warehouse o Berrey-Place (N. Campus) We currently have new building being built and will be added in the future. 8. Parents as Teachers & IT is listed on the DISTRICT DOORS spreadsheet but not the bid form. • Please clarify if this should be included in bid. 9. Will floor plans be provided showing door locations in each of buildings? See question 6. Floor plans will be handed out.

Posted: 12/17/2020

Type of Addition: questions answered

Posted: 12/30/2020

Type of Addition: Addendum 1 - INTERVIEW DATE

Overview: Note - Correction to interview date.  Interviews will NOT be conducted January 4 - 7, 2021 but will be at a later date TBD in February 2021.

Posted: 1/4/2021

Type of Addition: Addendum 3

Overview: District maps and info on protential inveiws TBD.

Documents:

Posted: 1/8/2021

Type of Addition: In Review

Posted: 11/2/2021

Type of Addition: No Action

Posted: 12/28/2021

Type of Addition: Award Information

Overview: Tech Electronics - see board memo

Documents:

Posted: 12/14/2020

Question: This appears to be a sole source bid that will only accept Mercury hardware in the design specifications. Is this correct? Or is this bid open to other manufacturers?

Response: Mercury hardware works with many programs and prevents the sole source.

Posted: 12/15/2020

Question:

Response: We have already responded to this question. Please see the public solicitation.

Posted: 12/16/2020

Question: Is this Pre-bid meeting mandatory or voluntary?

Response: The walkthrough is not mandatory but is recommended.

Posted: 12/21/2020

Question: 1. Spec 5 outlines virtual presentations, but these appear to be scheduled prior to the bid due date. • How are these vendors selected for interviews prior to bid? 2. Spec 12, 2.1, C, 3, e; states “The software shall provide Visitor Management Module for up to 250,000 visitors annually”. However, Visitor Management is also a separate RFP and it is stated in Spec 5, 4; “The District may select one vendor for the “Visitor Management System” and one vendor for the “Access Door System” and yet another for a “Camera System” or any combination thereof”. In addition; Spec 3, 3, 3C; requests product information from the Visitor Management and its capabilities and integration. • Is the visitor management system required to be a component of the Access Control software, or is a separate (but integrated) system acceptable? 3. Spec 12, 2.1, H, 10; indicates credential types. How many of each type should be included in this quote? 4. Spec 13, 3.10 says “Provide system server per specification”, but no other details are provided. • Will the access control server be owner provided or should it be provided under this scope? • If contractor provided, is this server to be located on premise or is cloud hosted an option? • Will the District IT Team support updates to an on premise server or is that the responsibility of the contractor? 5. Spec 13, 3.10 references a Door Hardware Appendix A that was not included as part of this bid package. A pdf titled “DISTRICT DOORS” was provided listing doors and hardware without explanation. • What do the A, E, and R/R notes on the DISTRICT DOORS spreadsheet indicate? (Add, Existing, Repair/Replace)? • Aiphone intercoms are indicated on this spreadsheet. o Are they existing or provided under this scope? o Will door release via Aiphone be required? 6. Spec 1 General Scope: States 21 buildings, but lists 22 plus an additional 8. There is also the Parents as Teachers & IT listed on the door list but not the bid form, making the total 31. There are 30 buildings listed on the Bid Form. Please clarify scope per questions #7 & 8 below. 7. Multiple sites on the Bid Form are not on the DISTRICT DOORS spreadsheet; Please provide door list and information for the following sites: o Journey Elementary o Holt High Athletic Storage o Dist. Grounds Building o North Point High School o Annex Warehouse o Berrey-Place (N. Campus) 8. Parents as Teachers & IT is listed on the DISTRICT DOORS spreadsheet but not the bid form. • Please clarify if this should be included in bid. 9. Will floor plans be provided showing door locations in each of buildings?

Response: Question Asked: 1. Spec 5 outlines virtual presentations, but these appear to be scheduled prior to the bid due date. • How are these vendors selected for interviews prior to bid? The vendor will be selected to do a virtual interview based on the information that the vendor sends in the bid packet. The safety committee will be going through the vendor proposal and selecting such vendors. 2. Spec 12, 2.1, C, 3, e; states “The software shall provide Visitor Management Module for up to 250,000 visitors annually”. However, Visitor Management is also a separate RFP and it is stated in Spec 5, 4; “The District may select one vendor for the “Visitor Management System” and one vendor for the “Access Door System” and yet another for a “Camera System” or any combination thereof”. In addition; Spec 3, 3, 3C; requests product information from the Visitor Management and its capabilities and integration. • Is the visitor management system required to be a component of the Access Control software, or is a separate (but integrated) system acceptable? The visitor management system can be its own or it can be a system that is capable of doing both. 3. Spec 12, 2.1, H, 10; indicates credential types. How many of each type should be included in this quote? Generally, three 4. Spec 13, 3.10 says “Provide system server per specification”, but no other details are provided. • Will the access control server be owner provided or should it be provided under this scope? • If contractor provided, is this server to be located on premise or is cloud hosted an option? • Will the District IT Team support updates to an on premise server or is that the responsibility of the contractor? WILL BE ANSWERED SOON – WAITING FOR CONFIRMATION FROM IT DEPT 5. Spec 13, 3.10 references a Door Hardware Appendix A that was not included as part of this bid package. A pdf titled “DISTRICT DOORS” was provided listing doors and hardware without explanation. • What do the A, E, and R/R notes on the DISTRICT DOORS spreadsheet indicate? (Add, Existing, Repair/Replace)? • Aiphone intercoms are indicated on this spreadsheet. o Are they existing or provided under this scope? o Will door release via Aiphone be required? The door packet is the minimum door that we plan to do and build up to every door. If the district choses to do all the doors, this list will change.The hardware of the doors is what we have and the vendor’s system must work with our hardware. If you cannot supply a system you must note replacement to the hardware. Aiphone is part of our hardware. 6. Spec 1 General Scope: States 21 buildings, but lists 22 plus an additional 8. There is also the Parents as Teachers & IT listed on the door list but not the bid form, making the total 31. There are 30 buildings listed on the Bid Form. Parents teacher is the same building as the I.T (Berry-Place) Please clarify scope per questions #7 & 8 below. 7. Multiple sites on the Bid Form are not on the DISTRICT DOORS spreadsheet; Please provide door list and information for the following sites: o Journey Elementary o Holt High Athletic Storage o Dist. Grounds Building o North Point High School o Annex Warehouse o Berrey-Place (N. Campus) We currently have new building being built and will be added in the future. 8. Parents as Teachers & IT is listed on the DISTRICT DOORS spreadsheet but not the bid form. • Please clarify if this should be included in bid. 9. Will floor plans be provided showing door locations in each of buildings? See question 6. Floor plans will be handed out.