Dorchester County Quote

Title: Boring & Conduit Installation

Deadline: 3/24/2022 5:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Quote Number: RFQ 2022-44

Description: The Contractor shall furnish all labor, tools, materials, equipment, and supervision necessary to bore earth and subsequently install electrical conduit as depicted in Attachment A – Drawings and as specified below, at the Dorchester County Alcohol and Drug Commission, 320 Midland Parkway, Summerville, SC 29485.


Documents:

Documents as of 3/14/2022
2022-44.pdf
Attachment A - Drawing.pdf
Question 1

Posted: 3/11/2022

Question: Addendum A was not included in the online documentation. Can that be emailed / uploaded.

Response: The missing attachment has been added.

Posted: 3/11/2022

Question: Addendum A was not included in the online documentation. Can that be emailed / uploaded.

Response: The missing attachment has been added.