Arlington County Government Sealed Solicitation

Title: 23-DES-ITBPW-631 On-call Traffic Signal Construction & Maintenance

Deadline: 6/21/2023 2:30 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: 23-DES-ITBPW-631

Description: FOR THE PROVISION OF ON-CALL TRAFFIC SIGNAL CONSTRUCTION AND MAINTENANCE CONTRACT PROVIDING CONSTRUCTION SERVICES FOR TRAFFIC SIGNAL UPGRADES, MAINTENACE OF TRAFFIC SIGNALS & ITS INFRASTRUCTURES THOUGHOUT THE COUNTY.

ALSO, ADDITIONAL IMPROVEMENTS INCLUDE BUT NOT LIMITED TO ARE – CURB AND GUTTERS, ADA ACCESSIBLE RAMPS, SIDEWALKS, PAVEMENT MARKING AND SIGNAGE, LANDSCAPING, ASPHALT PAVEMENT, AND ALL OTHER INCIDENTAL WORK DESCRIBED AND REQUIRED IN THE CONTRACT DOCUMENTS.


Pre-Bid Meeting Date: 6/7/2023 11:00 AM


Documents:

Documents as of 5/26/2023
23-DES-ITBPW-631 On-call TSCM.pdf
ATTACHMENT A- Pricing Schedule.xlsx
ATTACHMENT B - TSCM-Special Conditions.pdf
ATTACHMENT C - TSC&M-Supplemental Specifications.pdf
ATTACHMENT D - TSC&M-Materials Testing Specification Reference.pdf
ATTACHMENT E - TSC&M-Lane Closure Guidelines_NOVA Dist_2016-09-29_FINAL.pdf
ATTACHMENT F - TSC&M-RFI Form Template.pdf
ATTACHMENT G - Traffic Signal Pole Foundation Design.pdf
ATTACHMENT H - TSC&M-State and Federal Roads in Arlington County, VA.PDF
EXHIBIT C - VA DOLI wage determination.pdf
Addition 1

Posted: 6/8/2023

Type of Addition: Attendance Sheet & Minutes

Documents:

Addition 2

Posted: 6/12/2023

Type of Addition: Addendum 1

Documents:

Addition 3

Posted: 6/21/2023

Type of Addition: Bid Tabulation

Documents:

Addition 4

Posted: 7/18/2023

Type of Addition: AWARD NOTICE

Documents:

Question 1

Posted: 6/9/2023

Question: Will the County provide loading requirements for strain pole designs?

Response: Yes, if the strain poles are proposed in the task order, County will be providing the foundation design which incorporates loading requirements for strain poles. Also, please refer to County’s Response to question regarding Bid Item No. 80 (Furnish and Install Strain Pole) for the instruction to bid the line item.

Question 2

Posted: 6/12/2023

Question: Attachment A #80 calls to furnish and install strain pole but there is no current strain pole in the specs. Is there one we can use for pricing?

Response: Contractors are instructed to use VDOT 2016 Road and Bridge Standards, Section 1300: Traffic Control Devices, Standard MP-2 (Strain and Combination Luminaire Strain Pole) for pricing Item No. 80 (Furnish and Install Strain Pole).

Question 3

Posted: 6/12/2023

Question: How will rock drilling be paid for the direction bored conduit pay items?

Response: County does not anticipate rock drilling work under this solicitation.

Question 4

Posted: 6/12/2023

Question: Please identify if the contractor is allowed to escalate their price yearly based on current market conditions.

Response: Yes, please refer to Clause “Contract Price Adjustments” of the Agreement form in the solicitation document.

Question 5

Posted: 6/12/2023

Question: Extensive testing requirements for soil compaction, concrete compressive strength, and asphalt density are required within the project specifications. Please identify how these will be paid since quantities and scope cannot be guaranteed.

Response: Please refer to Arlington County Construction Standards and Specifications, Section 01400 – Quality Requirements for details on Testing. As outlined in the Part 4-Measurement and Payment section of Section 01400, “Unless otherwise specified, testing of materials, supplies, equipment, and work to comply with the Contract requirements shall be considered incidental to the work, and the Contractor shall not be entitled to further payment. The Project Officer may direct additional testing in excess of the Contract requirements at the County’s expense, unless such testing reveals non-compliant work, in which case the Contractor shall bear the cost of the testing.” Regarding, methods and frequency of testing for Arlington County projects, please refer to, “Arlington County, VA Materials Testing Specification Reference (September 2020)” included as Attachment D in this solicitation.

Question 6

Posted: 6/12/2023

Question: Please identify how much time prior to NTP will the county allow for material procurement.

Response: After issuance of Notice to Proceed (NTP) for the task order, if justified, appropriate task order time adjustments will be made as needed to accommodate the material procurement for the task order.

Question 7

Posted: 6/12/2023

Question: The testing specifications in reference to backfill of manholes. Need clarification that this does not include the standard junction boxes that are used for the signal installation since we no longer use the circular manholes?

Response: Materials Testing Specification Reference, Material and Test #6, “Backfill for Manholes” is not applicable for the installation of traffic signal junction boxes. Traffic Rated Circular Junction Box is still in use and standards can be found in 61-02 and 61-03 of latest Arlington County Traffic Signal Standards.

Question 8

Posted: 6/12/2023

Question: Please identify which standard material the County plans to furnish and provide to the contractor for issued tasks.

Response: Materials that are not furnished under this solicitation and will be needed for issued task orders under On-call Traffic Signal Construction & Maintenance contract will be furnished by the County.

Question 9

Posted: 6/12/2023

Question: Please confirm if a pending VDOT prequalification status will be accepted in lieu of a fully prequalified vendor.

Response: Please refer to, “Minimum Bidder Qualifications” in the Bid Form, as well as, Special Conditions, Section 13 (VDOT Qualification Requirements) for detail.

Question 10

Posted: 6/12/2023

Question: Please identify if the MDOT Temporary Traffic Control Manager’s Training Course will be accepted in lieu of the VDOT Advanced Work Zone Traffic Control certification.

Response: Please refer to, “Minimum Bidder Qualifications” in the Bid Form for the type of certifications required with the bid submission. No exceptions are considered at this time.

Question 11

Posted: 6/12/2023

Question: Please identify if the VDOT Intermediate or Basic Work Zone Traffic Control certification will be accepted in lieu of the VDOT Advanced Work Zone Traffic Control certification.

Response: Please refer to, “Minimum Bidder Qualifications” in the Bid Form for the type of certifications required with bid submission. No exceptions are considered at this time.

Question 12

Posted: 6/12/2023

Question: With all of the material testing specifications in the contract how does that allow for emergencies like on a weekend or holiday. If we have to do an emergency road crossing or foundation and it's not on a standard workday and there's no notice to set the testing companies up do the emergency get put on hold or will there be allowances?

Response: Emergency work as outlined in the contract documents are generally exempted from testing requirements, however, it is at the sole discretion of County’s Project Officer assigned to the emergency work to determine whether the testing shall be required for the type of emergency work performed. It shall be Contractor’s responsibility to ensure that testing requirements are cleared with the assigned Project Officer prior to performing the emergency work.

Posted: 6/8/2023

Type of Addition: Attendance Sheet & Minutes

Documents:

Posted: 6/12/2023

Type of Addition: Addendum 1

Documents:

Posted: 6/21/2023

Type of Addition: Bid Tabulation

Documents:

Posted: 7/18/2023

Type of Addition: AWARD NOTICE

Documents:

Posted: 6/9/2023

Question: Will the County provide loading requirements for strain pole designs?

Response: Yes, if the strain poles are proposed in the task order, County will be providing the foundation design which incorporates loading requirements for strain poles. Also, please refer to County’s Response to question regarding Bid Item No. 80 (Furnish and Install Strain Pole) for the instruction to bid the line item.

Posted: 6/12/2023

Question: Attachment A #80 calls to furnish and install strain pole but there is no current strain pole in the specs. Is there one we can use for pricing?

Response: Contractors are instructed to use VDOT 2016 Road and Bridge Standards, Section 1300: Traffic Control Devices, Standard MP-2 (Strain and Combination Luminaire Strain Pole) for pricing Item No. 80 (Furnish and Install Strain Pole).

Posted: 6/12/2023

Question: How will rock drilling be paid for the direction bored conduit pay items?

Response: County does not anticipate rock drilling work under this solicitation.

Posted: 6/12/2023

Question: Please identify if the contractor is allowed to escalate their price yearly based on current market conditions.

Response: Yes, please refer to Clause “Contract Price Adjustments” of the Agreement form in the solicitation document.

Posted: 6/12/2023

Question: Extensive testing requirements for soil compaction, concrete compressive strength, and asphalt density are required within the project specifications. Please identify how these will be paid since quantities and scope cannot be guaranteed.

Response: Please refer to Arlington County Construction Standards and Specifications, Section 01400 – Quality Requirements for details on Testing. As outlined in the Part 4-Measurement and Payment section of Section 01400, “Unless otherwise specified, testing of materials, supplies, equipment, and work to comply with the Contract requirements shall be considered incidental to the work, and the Contractor shall not be entitled to further payment. The Project Officer may direct additional testing in excess of the Contract requirements at the County’s expense, unless such testing reveals non-compliant work, in which case the Contractor shall bear the cost of the testing.” Regarding, methods and frequency of testing for Arlington County projects, please refer to, “Arlington County, VA Materials Testing Specification Reference (September 2020)” included as Attachment D in this solicitation.

Posted: 6/12/2023

Question: Please identify how much time prior to NTP will the county allow for material procurement.

Response: After issuance of Notice to Proceed (NTP) for the task order, if justified, appropriate task order time adjustments will be made as needed to accommodate the material procurement for the task order.

Posted: 6/12/2023

Question: The testing specifications in reference to backfill of manholes. Need clarification that this does not include the standard junction boxes that are used for the signal installation since we no longer use the circular manholes?

Response: Materials Testing Specification Reference, Material and Test #6, “Backfill for Manholes” is not applicable for the installation of traffic signal junction boxes. Traffic Rated Circular Junction Box is still in use and standards can be found in 61-02 and 61-03 of latest Arlington County Traffic Signal Standards.

Posted: 6/12/2023

Question: Please identify which standard material the County plans to furnish and provide to the contractor for issued tasks.

Response: Materials that are not furnished under this solicitation and will be needed for issued task orders under On-call Traffic Signal Construction & Maintenance contract will be furnished by the County.

Posted: 6/12/2023

Question: Please confirm if a pending VDOT prequalification status will be accepted in lieu of a fully prequalified vendor.

Response: Please refer to, “Minimum Bidder Qualifications” in the Bid Form, as well as, Special Conditions, Section 13 (VDOT Qualification Requirements) for detail.

Posted: 6/12/2023

Question: Please identify if the MDOT Temporary Traffic Control Manager’s Training Course will be accepted in lieu of the VDOT Advanced Work Zone Traffic Control certification.

Response: Please refer to, “Minimum Bidder Qualifications” in the Bid Form for the type of certifications required with the bid submission. No exceptions are considered at this time.

Posted: 6/12/2023

Question: Please identify if the VDOT Intermediate or Basic Work Zone Traffic Control certification will be accepted in lieu of the VDOT Advanced Work Zone Traffic Control certification.

Response: Please refer to, “Minimum Bidder Qualifications” in the Bid Form for the type of certifications required with bid submission. No exceptions are considered at this time.

Posted: 6/12/2023

Question: With all of the material testing specifications in the contract how does that allow for emergencies like on a weekend or holiday. If we have to do an emergency road crossing or foundation and it's not on a standard workday and there's no notice to set the testing companies up do the emergency get put on hold or will there be allowances?

Response: Emergency work as outlined in the contract documents are generally exempted from testing requirements, however, it is at the sole discretion of County’s Project Officer assigned to the emergency work to determine whether the testing shall be required for the type of emergency work performed. It shall be Contractor’s responsibility to ensure that testing requirements are cleared with the assigned Project Officer prior to performing the emergency work.