Lee College District Purchasing Dept. Sealed Solicitation

Title: Roof Coating & Sealant Project

Deadline: 3/31/2022 2:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Awarded

Solicitation Number: 220331-01

Description: NOTICE TO PROPOSERS

Roof Coating & Sealant Project (CSP # 220331-01)


The Lee College District (“Lee College” or the “College”) is requesting Competitive Sealed Proposals for the Roof Coating & Sealant Project. The Proposer shall furnish all labor, materials, and equipment when performing all work. All proposals must be uploaded to Vendor Registry by Thursday, March 31, 2022, 2:00 PM. An optional pre-proposal meeting will be held at 10:00 AM on Wednesday, March 16, 2022 at 501 S. Pruett St. Baytown Texas, 77520. The deadline for questions is Wednesday, March 23, 2022 at 05:00 PM. Questions regarding this solicitation must be submitted via Vendor Registry. For questions related to using Vendor Registry, use the help option/chat for assistance on their website. If you need further assistance please contact lcsolicitations@lee.edu. Emailed, faxed, or hard copy proposals will not be accepted and will be disqualified and/or returned unopened. Vendors will receive confirmation from Vendor Registry when their proposal is successfully received. For scoring purposes, mail or hand deliver four (4) hard copy proposals, without pricing, by the due date and time directed to: Purchasing Department, c/o Lee College, Roof Coating and Sealant Project, 511 S. Whiting Baytown, Texas 77520.

The project consists of roof recoating and sealant for five (5) of Lee College’s properties; 900 Decker, Gray Science, Sports Arena, Advance Tech and Tech VOC1 Building. In addition, the project includes, but not limited to, working with; demolition, masonry, metal, rough carpentry and various thermal and moisture protections. This project also includes all incidentals required for the completion of the project.

Upon recommendation of the proposal(s,) the College Board of Regents plans to award a Contract; however, the College reserves the right to reject any and all proposals, to waive any and all irregularities and technicalities, and to accept any proposal(s) which it deems beneficial to it. Each proposer agrees to waive any claim it has or may have against the Owner, the Engineer, and their respective employees, arising out of or in connection, with the administration, evaluation, or recommendation of any bid.


1st Advertisement for Solicitation = February 24th
2nd Advertisement for Solicitation = March 3rd
Pre-Proposal Meeting= March 16th - 10:00 AM
Due Date for Written Questions = March 23rd - 5:00 PM
Due Date for Written Answers Addendum = March 25th - 12:00 PM
Opening Proposal Meeting= March 31st - 2:00 PM


Pre-Bid Meeting Date: 3/16/2022 10:00 AM

Pre-Bid Meeting Details: An optional pre-proposal meeting will be held at 10:00 AM on Wednesday, March 16, 2022 at 501 S. Pruett St. Baytown Texas, 77520. Please signup if you plan to attend the pre-proposal meeting.


Documents:

Documents as of 3/17/2022
Login to view documents
Login to view documents
Login to view documents
Login to view documents

PLANHOLDERS:

Date Company Name
2/24/2022 8:49:07 AM Rockin' A Construction, LLC
2/24/2022 9:05:53 AM Alpha Building Corporation
2/24/2022 1:12:08 PM Monument Constructors (Monument Roofing Systems)
2/28/2022 5:17:56 PM Lynndom Enterprises LLC
3/1/2022 12:34:50 PM FMG Construction Group, LLC
3/2/2022 10:41:33 AM F. W. Walton, Inc.
3/3/2022 11:44:54 AM PREMIER WORLDWIDE, INC
3/4/2022 10:10:25 AM Eco Roof and Solar
3/5/2022 7:52:12 AM Ralston Paint Contractors Inc
3/8/2022 10:32:21 AM CS ADVANTAGE USAA INC
3/9/2022 9:34:43 AM progressive Roofing
3/11/2022 2:35:50 PM Scarlet Energy, Inc.
3/14/2022 9:51:19 AM Texas Geotek LLC
3/14/2022 9:11:13 PM Alto Vista Roofing
3/18/2022 10:20:24 AM Dodge Data
3/23/2022 2:13:20 PM Nabors Roofing
3/24/2022 3:28:01 PM American Weatherstar
3/29/2022 11:52:54 AM Porter Roofing Contractors, Inc.
3/30/2022 3:47:24 PM J R Jones Roofing & Waterproofing
3/30/2022 3:51:27 PM AGC of Southeast Texas
3/30/2022 4:14:36 PM Texas Liqua Tech Svcs Inc
3/30/2022 7:21:39 PM United Restoration & Preservation, Inc.
3/31/2022 12:19:12 AM Dodge Data & Analytics
3/31/2022 9:13:27 AM Tadco Roofing LLC
4/1/2022 8:20:57 AM Virtual Builders Exchanges
4/1/2022 8:46:22 AM Brazos Urethane, Inc.
4/1/2022 1:46:53 PM CR Systems Inc.
4/2/2022 3:29:07 AM dodge data and analytics
4/5/2022 2:54:57 PM Origin Roofing & Metal Inc.
4/26/2022 9:50:51 AM HRG
4/27/2022 7:18:53 AM Construction Journal
5/3/2022 4:37:14 PM ConstructConnect
6/30/2022 4:08:43 PM Structure Roof and Wall Solutions
Addition 1

Posted: 3/15/2022

Type of Addition: Addendum One (1)

Overview: Lee College Addendum One (1):

  • Section 00 42 00 Proposal Form: Replace proposal form section in its entirety. Please
    see attached.
  • Infrared plans have been added. Please see attached.
  • Includes Beam's Addendum with Questions & Answers 

Deadline: 3/31/2022 2:00 PM

Pre-Bid Meeting Details: Location: 501 S. Pruett St. Baytown Texas, 77520

Solicitation #: 220331-01

Documents:

Addition 2

Posted: 3/18/2022

Type of Addition: Addendum Two (2)

Overview: Addendum two (2) will include the following:

  • Pre Proposal Sign-In Sheet
  • Clarifications to questions asked during the pre-visit walk through
  • Approved material substitutes 

Deadline: 3/31/2022 2:00 PM

Solicitation #: 220331-01

Documents:

Addition 3

Posted: 3/21/2022

Type of Addition: Q&A

Overview:

  1. Question: Unfortunately, we missed the pre bid meeting on March 16th. I apologize for missing it. Are we still eligible to bid on this project? I hope we still have an opportunity to work with you guys.
Answer: The Pre-bid meeting was not mandatory, as a result does not bar you or any company from bidding.

Addition 4

Posted: 3/28/2022

Type of Addition: Addendum Three (3)

Overview: Addendum three (3):


BEAM Professionals have submitted responses to proposer/ bidder questions that have been
posted on the question section of Vendor Registry and changes to the proposal forms section 00 42
00.

Deadline: 3/31/2022 2:00 PM

Solicitation #: 220331-01

Documents:

Addition 5

Posted: 3/30/2022

Type of Addition: Addendum Four (4)

Overview:

Addendum four (4) will contain the following information:

  • Updated location for Proposal Opening (Face-to-Face or Virtual via WebEx)

Deadline: 3/31/2022 2:00 PM

Solicitation #: 220331-01

Documents:

Addition 6

Posted: 4/1/2022

Type of Addition: In Review

Overview: This project is currently in the evaluation stage. Please allow up to 30 days for an award notice. The bid tabulation and sign-in sheet are now available. See attached.

Documents:

Addition 7

Posted: 4/1/2022

Type of Addition: Proposal Tabulation Update

Overview: The Owner has extended the allowance for the Alternate Proposal to include $40,000. Please see attached the updated Proposal Tabulation.

Documents:

Addition 8

Posted: 4/25/2022

Type of Addition: Award Information

Overview: Based on a thorough review and analysis of the submitted proposals, qualifications and references, Tadco Houston, LLC has been awarded this project.

Amount: $902,840.00

Documents:

Question 1

Posted: 2/25/2022

Question: What is the process to submit product approval requests?

Response: The outline of this process can be found in the "product substitution procedures" -01.25.13 section of the manual provided.

Question 2

Posted: 3/4/2022

Question: 1. i can not download the drawings. to big of attachment or maybe corrupted. 2. by garland inc. the roofs will need a infrared moisture scan thanks

Response: Please be advised, when downloading the drawings allow some time for the pictures to load if you are opening the file on your desktop. For the plans related to this project, SharePoint 365 is recommended. Infrared plans will be posted in addendum one (1).

Question 3

Posted: 3/4/2022

Question: OUR MANUFACTURER NEEDS TO MAKE A 12"X12" CORE SAMPLE TO MAKE SURE THE EXSITING ROOF IS COMPATIBLE WITH THE NEW COATING SYSTEM. CAN WE GO AND MAKE A CORE SAMPLE AT OUR COST?

Response: No. No Roofing membrane can be verified during pre-proposal walk-thru. Sub state does not impact coating. Infrared findings to be provided if concerns about moisture

Question 4

Posted: 3/23/2022

Question: Will the bid form be clarified? it seems confusing along with warranty requirements

Response: No. For each proposal contractor is to submit pricing they are bidding on. Contractor is to “N/A” the products they are not pricing. Base proposal requires a 10-year warranty, alternate proposals require a 20-year warranty.

Question 5

Posted: 3/23/2022

Question: Page G0 items 19 and 20 or the only buildings with coating scope listed on drawings of other buildings show a coating scope. please clarify.

Response: 909 Decker, Gray Science, ATC and the Sports Arena all have coating scopes.

Question 6

Posted: 3/23/2022

Question: Gaco Western is the only spray foam manufacturer that is listed. Can Carlisle Foam and coatings be listed as the approved equal for foam?

Response: This response has change to the following: Yes. But must submit data to review with proposal.

Question 7

Posted: 3/23/2022

Question: Can you clarify the roofing scope for VOC -1

Response: There is no roofing scope for TV-1, this is building envelope only.

Question 8

Posted: 3/23/2022

Question: Is the college looking for a 10yr or 20 year system?

Response: Both. Base proposal is at 10-years, alternate proposal is at 20-years.

Question 9

Posted: 3/23/2022

Question: Will this project be bid out as a package or separated out?

Response: As a package for one (1) contractor.

Question 10

Posted: 3/23/2022

Question: Does the college want the loose gravel dumped anywhere on campus?

Response: No. Contractor will be responsible for completing haul off.

Posted: 3/15/2022

Type of Addition: Addendum One (1)

Overview: Lee College Addendum One (1):

  • Section 00 42 00 Proposal Form: Replace proposal form section in its entirety. Please
    see attached.
  • Infrared plans have been added. Please see attached.
  • Includes Beam's Addendum with Questions & Answers 

Deadline: 3/31/2022 2:00 PM

Pre-Bid Meeting Details: Location: 501 S. Pruett St. Baytown Texas, 77520

Solicitation #: 220331-01

Documents:

Posted: 3/18/2022

Type of Addition: Addendum Two (2)

Overview: Addendum two (2) will include the following:

  • Pre Proposal Sign-In Sheet
  • Clarifications to questions asked during the pre-visit walk through
  • Approved material substitutes 

Deadline: 3/31/2022 2:00 PM

Solicitation #: 220331-01

Documents:

Posted: 3/21/2022

Type of Addition: Q&A

Overview:

  1. Question: Unfortunately, we missed the pre bid meeting on March 16th. I apologize for missing it. Are we still eligible to bid on this project? I hope we still have an opportunity to work with you guys.
Answer: The Pre-bid meeting was not mandatory, as a result does not bar you or any company from bidding.

Posted: 3/28/2022

Type of Addition: Addendum Three (3)

Overview: Addendum three (3):


BEAM Professionals have submitted responses to proposer/ bidder questions that have been
posted on the question section of Vendor Registry and changes to the proposal forms section 00 42
00.

Deadline: 3/31/2022 2:00 PM

Solicitation #: 220331-01

Documents:

Posted: 3/30/2022

Type of Addition: Addendum Four (4)

Overview:

Addendum four (4) will contain the following information:

  • Updated location for Proposal Opening (Face-to-Face or Virtual via WebEx)

Deadline: 3/31/2022 2:00 PM

Solicitation #: 220331-01

Documents:

Posted: 4/1/2022

Type of Addition: In Review

Overview: This project is currently in the evaluation stage. Please allow up to 30 days for an award notice. The bid tabulation and sign-in sheet are now available. See attached.

Documents:

Posted: 4/1/2022

Type of Addition: Proposal Tabulation Update

Overview: The Owner has extended the allowance for the Alternate Proposal to include $40,000. Please see attached the updated Proposal Tabulation.

Documents:

Posted: 4/25/2022

Type of Addition: Award Information

Overview: Based on a thorough review and analysis of the submitted proposals, qualifications and references, Tadco Houston, LLC has been awarded this project.

Amount: $902,840.00

Documents:

Posted: 2/25/2022

Question: What is the process to submit product approval requests?

Response: The outline of this process can be found in the "product substitution procedures" -01.25.13 section of the manual provided.

Posted: 3/4/2022

Question: 1. i can not download the drawings. to big of attachment or maybe corrupted. 2. by garland inc. the roofs will need a infrared moisture scan thanks

Response: Please be advised, when downloading the drawings allow some time for the pictures to load if you are opening the file on your desktop. For the plans related to this project, SharePoint 365 is recommended. Infrared plans will be posted in addendum one (1).

Posted: 3/4/2022

Question: OUR MANUFACTURER NEEDS TO MAKE A 12"X12" CORE SAMPLE TO MAKE SURE THE EXSITING ROOF IS COMPATIBLE WITH THE NEW COATING SYSTEM. CAN WE GO AND MAKE A CORE SAMPLE AT OUR COST?

Response: No. No Roofing membrane can be verified during pre-proposal walk-thru. Sub state does not impact coating. Infrared findings to be provided if concerns about moisture

Posted: 3/23/2022

Question: Will the bid form be clarified? it seems confusing along with warranty requirements

Response: No. For each proposal contractor is to submit pricing they are bidding on. Contractor is to “N/A” the products they are not pricing. Base proposal requires a 10-year warranty, alternate proposals require a 20-year warranty.

Posted: 3/23/2022

Question: Page G0 items 19 and 20 or the only buildings with coating scope listed on drawings of other buildings show a coating scope. please clarify.

Response: 909 Decker, Gray Science, ATC and the Sports Arena all have coating scopes.

Posted: 3/23/2022

Question: Gaco Western is the only spray foam manufacturer that is listed. Can Carlisle Foam and coatings be listed as the approved equal for foam?

Response: This response has change to the following: Yes. But must submit data to review with proposal.

Posted: 3/23/2022

Question: Can you clarify the roofing scope for VOC -1

Response: There is no roofing scope for TV-1, this is building envelope only.

Posted: 3/23/2022

Question: Is the college looking for a 10yr or 20 year system?

Response: Both. Base proposal is at 10-years, alternate proposal is at 20-years.

Posted: 3/23/2022

Question: Will this project be bid out as a package or separated out?

Response: As a package for one (1) contractor.

Posted: 3/23/2022

Question: Does the college want the loose gravel dumped anywhere on campus?

Response: No. Contractor will be responsible for completing haul off.