Title: College Blvd/Forest Rd. Multi-Use Path-AH

Deadline: 7/23/2025 3:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Deadline Expired

Solicitation Number: ITB PW 64-25

Description: OKALOOSA BOARD OF COUNTY COMMISSIONERS
CRESTVIEW, FLORIDA
NOTICE TO RESPONDENTS
ITB PW 64-25 College Blvd/Forest Rd Multi-Use Path

Notice is hereby given that the Board of County Commissioners of Okaloosa County, FL, will accept bids until 03:00 PM (CST) July 23, 2025 for the construction of the College Blvd/Forest Rd Multi-Use Path ITB PW 64-25. The Project consists of constructing a multi-use path (12' wide) from Palm Blvd. east along College Blvd., then turning south along Forest Rd. to Rocky Bayou Dr. The total project length is 2.5 miles. All work will be done within the existing right-of-way consisting of clearing, drainage improvements, earthwork, grading, asphalt paving, seeding and sodding, and other WORK as shown on the construction drawings and described in the specifications. Work shall be performed by contractors/subcontractors prequalified by the Florida Department of Transportation in: Drainage (7), Flexible Paving (10), Grading (11), Grassing, Seeding/Sodding (12), Guardrail (13), and Sidewalk (40). The work is further defined as shown on the Plans and as described by the Contract Documents.
Interested respondents desiring consideration shall submit their response online at Vendor Registry through the link provided below:
https://vrapp.vendorregistry.com/Bids/View/BidsList?BuyerId=21d474a1-e536-4f4d-9f2c-77c3b1e3c683
Unless otherwise stipulated in the bid/proposal description, all responses must be submitted using Vendor Registry only. No other means of submission of responses will be accepted. Responses will be accepted by Vendor Registry until 03:00 PM (CST) July 23, 2025 , at which time all bids that are timely submitted will be opened and reviewed.
The County reserves the right to award the bid to the lowest responsive respondent and to waive any irregularity or technicality in bids received. Okaloosa County shall be the sole judge of the bid and the resulting Agreement that is in its best interest and its decision shall be final.
Pursuant to section 287.05701, Florida Statutes, the County will not request any documentation of or consider a proposer’s social, political or ideological interests when determining if the proposer is a responsible proposer. The County will not give a preference to a proposer based upon the proposer’s social, political, or ideological interests.
Bids will only be received from Contractors prequalified by the Florida Department of Transportation in Drainage (7), Flexible Paving (10), Grading (11), and Sidewalk (40). Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. All terms, specifications and conditions set forth in this ITB are incorporated into your response. A bid will not be accepted unless all conditions have been met.
Bidding documents are only available as electronic portable document format (PDF) and may be downloaded free of charge from the vendor registry link above.
Bid security shall be furnished in accordance with the Instructions to Bidders.
A mandatory pre-bid conference will be held at 09:00 AM local time on July 9, 2025 at the Okaloosa County Public Works Office, 1759 S. Ferdon Blvd., Crestview, FL.
OKALOOSA COUNTY
BOARD OF COUNTY COMMISSIONERS
Paul Mixon
Chairman

DeRita Mason 
Purchasing Manager


Pre-Bid Meeting Date: 7/9/2025 9:00 AM

Pre-Bid Meeting Details: Please sign up if you plan to attend the pre-bid meeting.A mandatory pre-bid conference will be held at 09:00 AM local time on July 9, 2025 at the Okaloosa County Public Works Office, 1759 S. Ferdon Blvd., Crestview, FL.


Documents:

Documents as of 6/23/2025
Login to view documents
Login to view documents
Addition 1

Posted: 7/11/2025

Type of Addition: Addendum

Overview: Addendum 1

Deadline: 7/23/2025 3:00 PM

Documents:

Question 1

Posted: 6/25/2025

Question: will this project Require Davis bacon ? if so could you please provide the wage rates

Response: See Addendum 1

Question 2

Posted: 6/25/2025

Question: will this project be owner paid materials?

Response: See Addendum 1

Question 3

Posted: 6/25/2025

Question: Sheet No. 2 of the plans has a pay item for " Light Pole Complete, Relocate." There is not a bid item for this in the bid schedule. Is this to be omitted from the plans?

Response: See Addendum 1

Question 4

Posted: 6/25/2025

Question: After an onsite review today, there are numerous overhead electric poles that are within the limits of construction for the stabilized subgrade and within the limits of the asphalt multi-use path. The poles bases look as though they have been relocated recently. Please provide clarification on this. Will the poles be relocated or will the multi-use path be realigned with new cross sections and earthwork quantities provided?

Response: See Addendum 1

Question 5

Posted: 6/25/2025

Question: Along College Blvd there are several drop off issues and washouts adjacent to the roadway that will not be in the contractors limits of construction. Will these washouts be the contractors responsibility to maintain or Okaloosa Countys? These washouts are on both sides of College Blvd.

Response: See Addendum 1

Question 6

Posted: 6/25/2025

Question: There are utility boxes at the golf course entrance in the limits of the proposed sidewalk without notes. Will there be a pay item added to adjust these boxes?

Response: See Addendum 1

Question 7

Posted: 6/25/2025

Question: What is the engineers estimate for the project?

Response: See Addendum 1

Question 8

Posted: 6/25/2025

Question: Supplementary Condition Spec SC 7.02 says work shall be performed during regular (day light) working hours. The Temporary Traffic Control Plan on Sheet No. 113 Note 7 says, "Lane closures are prohibited from 7am to 7pm. There will be lane closures needed for shoulder demolition and construction of curb adjacent to College Blvd. Will lane closures be allowed during daylight regular working hours according to the Supplementary Conditions or from 7pm to 7am according to note 7 in the plans?

Response: See Addendum 1

Question 9

Posted: 6/26/2025

Question: 0550-10-130 Fencing, Type A, 6.1-7.0'. This pay item is not included in the summary of quantities and it is not depicted in the plan sheets. There are not any specifications for this fence as well. Please provide information detailing where this fence is to be installed and specifications. Additionally, will any existing fencing need to be removed?

Response: See Addendum 1

Question 10

Posted: 7/8/2025

Question: Will recycled concrete aggregate (RCA) be allowed for use as an OBG 01 material if the meets all FDOT Specifications of Section 911, with the exception of 911-2.1.1 Approval of Material? The approved use of RCA, with the exception of Rul 12-103 FAC, will result in a base with a higher LBR than alterative bases and will be a significantly cheaper option since the material has been recycled and is readily available.

Response: See Addendum 1

Question 11

Posted: 7/8/2025

Question: After a detailed quantity takeoff. My quantities for the Type B Stabilization, Optional Base Group 01, and Superpave Asphaltic Conc. are higher than the planned quantity in the bid schedule. Type B Stabilization - Takeoff Qty, 23,775 SY. Planned Qty, 22,371 SY. Difference of 1,404 SY. OBG 01 - Takeoff Qty, 16,964 SY. Planned Qty, 18,025 SY. Difference of 1,061 SY. Superpave Asphaltic Conc - Takeoff Qty, 1,392 Tons. Planned Qty, 1,287 Tons.

Response: Differences between planned and actual quantities will tracked and managed as part of the final CO after Substantial Completion (SB, OC).

Posted: 7/11/2025

Type of Addition: Addendum

Overview: Addendum 1

Deadline: 7/23/2025 3:00 PM

Documents:

Posted: 6/25/2025

Question: will this project Require Davis bacon ? if so could you please provide the wage rates

Response: See Addendum 1

Posted: 6/25/2025

Question: will this project be owner paid materials?

Response: See Addendum 1

Posted: 6/25/2025

Question: Sheet No. 2 of the plans has a pay item for " Light Pole Complete, Relocate." There is not a bid item for this in the bid schedule. Is this to be omitted from the plans?

Response: See Addendum 1

Posted: 6/25/2025

Question: After an onsite review today, there are numerous overhead electric poles that are within the limits of construction for the stabilized subgrade and within the limits of the asphalt multi-use path. The poles bases look as though they have been relocated recently. Please provide clarification on this. Will the poles be relocated or will the multi-use path be realigned with new cross sections and earthwork quantities provided?

Response: See Addendum 1

Posted: 6/25/2025

Question: Along College Blvd there are several drop off issues and washouts adjacent to the roadway that will not be in the contractors limits of construction. Will these washouts be the contractors responsibility to maintain or Okaloosa Countys? These washouts are on both sides of College Blvd.

Response: See Addendum 1

Posted: 6/25/2025

Question: There are utility boxes at the golf course entrance in the limits of the proposed sidewalk without notes. Will there be a pay item added to adjust these boxes?

Response: See Addendum 1

Posted: 6/25/2025

Question: What is the engineers estimate for the project?

Response: See Addendum 1

Posted: 6/25/2025

Question: Supplementary Condition Spec SC 7.02 says work shall be performed during regular (day light) working hours. The Temporary Traffic Control Plan on Sheet No. 113 Note 7 says, "Lane closures are prohibited from 7am to 7pm. There will be lane closures needed for shoulder demolition and construction of curb adjacent to College Blvd. Will lane closures be allowed during daylight regular working hours according to the Supplementary Conditions or from 7pm to 7am according to note 7 in the plans?

Response: See Addendum 1

Posted: 6/26/2025

Question: 0550-10-130 Fencing, Type A, 6.1-7.0'. This pay item is not included in the summary of quantities and it is not depicted in the plan sheets. There are not any specifications for this fence as well. Please provide information detailing where this fence is to be installed and specifications. Additionally, will any existing fencing need to be removed?

Response: See Addendum 1

Posted: 7/8/2025

Question: Will recycled concrete aggregate (RCA) be allowed for use as an OBG 01 material if the meets all FDOT Specifications of Section 911, with the exception of 911-2.1.1 Approval of Material? The approved use of RCA, with the exception of Rul 12-103 FAC, will result in a base with a higher LBR than alterative bases and will be a significantly cheaper option since the material has been recycled and is readily available.

Response: See Addendum 1

Posted: 7/8/2025

Question: After a detailed quantity takeoff. My quantities for the Type B Stabilization, Optional Base Group 01, and Superpave Asphaltic Conc. are higher than the planned quantity in the bid schedule. Type B Stabilization - Takeoff Qty, 23,775 SY. Planned Qty, 22,371 SY. Difference of 1,404 SY. OBG 01 - Takeoff Qty, 16,964 SY. Planned Qty, 18,025 SY. Difference of 1,061 SY. Superpave Asphaltic Conc - Takeoff Qty, 1,392 Tons. Planned Qty, 1,287 Tons.

Response: Differences between planned and actual quantities will tracked and managed as part of the final CO after Substantial Completion (SB, OC).