Arlington County Government Sealed Solicitation
Title: 21-DES-ITB-493 Net Zero Energy (NZE) Residential Building Construction
Deadline: 4/15/2021 1:30 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Cancelled
Solicitation Number: 21-DES-ITB-493
Description:
Pre-Bid Meeting Date: 2/17/2021 10:00 AM
Documents:
Addition 1
Posted: 2/17/2021
Type of Addition: Addendum 1
Deadline: 4/15/2021 1:30 PM
Solicitation #: 21-DES-ITB-493
Documents:
Addition 2
Posted: 2/17/2021
Type of Addition: Existing Resident Video
Documents:
Addition 5
Posted: 3/30/2021
Type of Addition: Addendum 4
Documents:
- Amended Sections of Structural Drawings.pdf
- Addendum 4.pdf
- Amended Specification Section - Ground-Loop Heat-Pump Piping.pdf
- Amended Sections of Electical Drawings.pdf
- Amended Sections of Architecture Drawing.pdf
- Amended Sections of Mechanical Drawings.pdf
- Amended Sections of Fire Protection Drawings.pdf
- Amended Sections of Fire Alarm Drawings.pdf
- Amended Specification Section - Photovoltaic Systems.pdf
- REVISED PRICING SHEET.xlsx
- Amended Sections of Civil & Structure Drawing.pdf
- Amended Sections of Plumbing Drawings.pdf
Addition 6
Posted: 4/12/2021
Type of Addition: Clarification
Overview: Acknowledge receipt of Addendum 4 by signing the bottom signature section of Addendum 4 and upload with your bid submittal.
Addition 7
Posted: 4/14/2021
Type of Addition: Clarification
Overview: All required documents including Deductive Alternative Pricing Sheet will need to be submitted electronically via Vendor Registry no later than the date and time specified - April 15 at 1:30 p.m. Any other form of submission will be considered nonresponsive.
Addition 10
Posted: 6/30/2021
Type of Addition: Cancellation Information
Overview: REJECTION NOTICE ON THE 30TH DAY OF JUNE 2021, 21-DES-ITB-493: CONSTRUCTION OF A NET ZERO ENERGY (NZE) SINGLE-FAMILY RESIDENTIAL BUILDING AND SITE IMPROVEMENT AFTER DUE AND PROPER ADVERTISEMENT AND EVALUATION ALL BIDS ARE HEREBY REJECTED NO REVIEW OF DOCUMENTS IS ALLOWED 2100 Clarendon Blvd., Arlington, VA 22201 703-228-3415
Documents:
Question 1
Posted: 2/17/2021
Question: Good morning from Cindy Kacher, Curtis Ventures Custom Homes. Thank you for today's brief meeting. We will need at least 8 weeks to provide an accurate bid for this project. Additionally, we will need at least a 4 week window for asking questions since sub-contractors will inevitably have questions we will need to convey to you. Will you be extending the deadline for bids to at least 28 April 2021? If so, will you be extending this online and shared Q & A to at least 7 April? Even as a local contractor based in Arlington with local sub-contractors we cannot possibly bid on this with the timeline you propose. Please advise and thank you.
Response: Please refer to Addendum 1 (posted on February 17, 2021).
Question 2
Posted: 2/18/2021
Question: Hello, Thank you for the information you presented at the meeting yesterday. I had a few follow up questions about the process. The first question is will you move the deadline for questions and final submissions? Given the aggressive time frame that has been put forward we are unable to do our due diligence. We will not be able to invest the time necessary to properly prepare for a request of this scope. If you can verify within the next few days that you will be able to extend the deadline for 8 weeks, we will consider the project. If you cannot we cannot even, consider processing the information you have outlined. The next question is what is driving this process? What are the other over arching goals of this project? I can see the direct benefit of housing individuals but there was a discussion about Net Zero and the other things that are included in this scope. Put another way what are the secondary goals of this project? Community outreach? Beneficial operating costs? Lastly, you have defined the scope of work that is more suitable to 8 story commercial building rather than to residential home building in Arlington. Having lived in Arlington my whole life and worked in home building here the better part of 20 years I was surprised at the form the plans and scope of work have taken. How did you arrive at this? Some background would be helpful in our analysis. If your goal is a new single-family home for DHS I can certainly propose many cost saving measures. But it appears your goals are not exclusively to house people. What was the conversation that led you down this path? Does a local Arlington home builder even make sense for what you are trying to achieve? Your answers to these questions will help me determine whether an Arlington based, Energy efficient, home building firm is potentially the right fit for what you are trying to do. Further, it will help us assess if your goals are compatible with our business model. I will await your reply. Thank you, Andrew Moore
Response: To better answer your questions, please provide specific area in the solicitation to which you would like more clarification.
Question 3
Posted: 2/18/2021
Question:
Response: Please refer to the addendum (Addendum 1) posted yesterday as bid submission date has been extended. We will work on answering your other questions as soon as possible.
Question 4
Posted: 2/23/2021
Question: Hello, The 21-DES-ITB-493 form states: COMPANY QUALIFICATIONS: "Bidders shall have three (3) years of experience conducting Net Zero Energy (NZE) projects. The experience shall be work of similar size and scope, construction, re-construction, and maintenance. The Bidder’s obtained project experience shall consist of the following energy conservation measures: • Enhanced thermal building envelope • Geothermal boreholes • Water-source heat pumps with electronically commutated motor (ECM) • Water to the water heat pump for domestic hot water • Photovoltaic solar panels with electrical infrastructure included • Energy recovery ventilators" - on page 9. I have not certified any Net Zero projects but have extensive experience in the other areas listed. Is it required as stated to have 3 years with NZE certifications or just the aspects that go into it? Thanks, Andrew Moore
Response: Providing evidence that incorporate all the appropriate Energy Conservation measures requested in the Invitation for Bid document, and which resulted in near net-zero performance, will also be considered.
Question 5
Posted: 2/24/2021
Question: Thank you for extending the deadline for questions and for bid submission. Our next question is about the draw schedule. Specifically, could you lead me to the pages in the contract or manual that focus on the timeline for construction draws. Could you tell me what I may expect for a deposit before incurring costs? I would expect to float several hundred thousand dollars between draws. Would that capital be part of the initial deposit? So far I have not found this information in the extensive sets of documents.
Response: There's no draw or deposit provided by the County. Details regarding payments is addressed on pages 18-19 (sections 6 & 7) of the solicitation.
Question 6
Posted: 2/24/2021
Question: Hello, I received you answer to question #2:"To better answer your questions, please provide specific area in the solicitation to which you would like more clarification. " The point of my question is that I do not see that information anywhere and so I can not point to a specific page or section. As far as I can tell there are several important things that are not addressed in the bid information. #1 Who is funding this? What department, specifically where will the funds come from out of the Arlington County budget. Department? Project? Etc. Is this project currently funded? #2 What are the secondary goals, beyond housing and Net Zero? #3 Who are the people, what is the committee, what organizational structure will award the bid? #4 Can you point me to the documented pre-meetings that led to you choosing this particular project/ structure? These are the same questions I ask all my clients. It is important to understand not only the stated goals but also the underlying goals. And many times I find that when you get past the first questions it leads to more important questions and answers about the project. Thank you. Andrew Moore
Response: • This is a County funded project. The County does not issue any request for work if the project is not funded. • The building is for the Department of Human Services, and the Bureau of Facilities Design and Construction of the County is supporting this effort. • The evaluation committee is not public information at this time. • the Bid will be awarded based on the bid response and the Contractors responsiveness to the bid as well and the Contractors’ capacity to do the work. • The document gives the necessary information for the purpose of bidding, including the contractor and staffing qualifications. • The residence will be the primary home for Arlington adults with disabilities. The project description provides the details necessary for a Contractor to provide a bid cost for the project. • The goals are clear, there are no hidden goals or additional information that the County can provide at this time. The details on page 16 of the Invitation of Bid tells the Bidders what the County needs are for this building.
Question 7
Posted: 3/1/2021
Question: Is it possible to set up a site visit for the inside of the building and or get photos/video of the inside of the building? We need to have more details about the construction of the building to furnish an accurate bid. For example, we don't know if there is a basement or crawl space.
Response: All videos of the exterior and all interior levels of this existing property are available on this site for viewing by bidders. Accessing the interior of the existing property is not allowed at this time. You can always go to see the exterior of the property at any time.
Question 8
Posted: 3/1/2021
Question: During the pre-bid meeting a video of the inside of the existing building was referenced, but we were unable to view the video. How can we gain access to this video to better understand existing conditions within the inside of the building?
Response: Six MP4 videos are attached to this solicitation on Vendor Registry as part of Addition 2: Existing Resident Video.
Question 9
Posted: 3/1/2021
Question: I have attempted to download the Level 1 video 5 times at two different occasions and the following error pops up. Can you confirm the link is valid? We apologize- an error occurred while processing your request. Our technical staff has been notified, and we'll be looking into it very soon. Feel free to contact customer service at cservice@vendorregistry.com or at 844-802-9202 (toll-free).
Response: The link for Level 1 is valid.
Question 10
Posted: 3/3/2021
Question: The water source heat pumps are shown as Daikin, but local geothermal companies recommend WaterFurnace as an alternate manufacturer for geothermal applications. Is this alternate accpetable?
Response: Water Furnace is listed as an acceptable manufacturer in Specification Section 238126-2.1 (Attachment D - Project Manual pg. 1027)
Question 11
Posted: 3/9/2021
Question: good morning. could you please address Third Party Commissioning. Is it addressed in the bid documents? If so, specifically where? Will the county reimburse for third party commissioning?
Response: Please refer to Specification # 019113E1 – General Commissioning Requirements, Part 1, paragraph 1.7 DEFINITION, A. Commissioning Authority. Therefore, the Commissioning Authority is a person or entity who will be under a separate contract with the County. The contractor do not need to hire the Commissioning Authority. Please read carefully all of this Specification section and additionally sections 220800 – Commissioning of Plumbing; 230800 – Commissioning of HVAC; 260800 – Commissioning of Electrical which refer to all the requirements of Commissioning, of which the general contractor of this project must comply.
Question 12
Posted: 3/9/2021
Question: thank you for your answer that the commissioning authority (CxA) is being hired/provided by the owner/county, and as I understand it, that entity will handle all commissioning procedures and the trade contractors will not need to hire a 3rd party commissioning agent. would you please share the Cx agent’s contact information?
Response: Names and contact information of any separate contractors related to this project will only be revealed to the general contractor at contract award. Please read carefully all the following specifications sections: Section # 019113E1 – General Commissioning Requirements; Section # 220800 – Commissioning of Plumbing; Section # 230800 – Commissioning of HVAC; and Section # 260800 - Commissioning of Electrical These sections reference all the requirements of Commissioning on this project, of which the general contractor who is awarded this project must comply.
Posted: 2/17/2021
Type of Addition: Addendum 1
Deadline: 4/15/2021 1:30 PM
Solicitation #: 21-DES-ITB-493
Documents:
Posted: 2/17/2021
Type of Addition: Existing Resident Video
Documents:
Posted: 3/30/2021
Type of Addition: Addendum 4
Documents:
- Amended Sections of Structural Drawings.pdf
- Addendum 4.pdf
- Amended Specification Section - Ground-Loop Heat-Pump Piping.pdf
- Amended Sections of Electical Drawings.pdf
- Amended Sections of Architecture Drawing.pdf
- Amended Sections of Mechanical Drawings.pdf
- Amended Sections of Fire Protection Drawings.pdf
- Amended Sections of Fire Alarm Drawings.pdf
- Amended Specification Section - Photovoltaic Systems.pdf
- REVISED PRICING SHEET.xlsx
- Amended Sections of Civil & Structure Drawing.pdf
- Amended Sections of Plumbing Drawings.pdf
Posted: 4/12/2021
Type of Addition: Clarification
Overview: Acknowledge receipt of Addendum 4 by signing the bottom signature section of Addendum 4 and upload with your bid submittal.
Posted: 4/14/2021
Type of Addition: Clarification
Overview: All required documents including Deductive Alternative Pricing Sheet will need to be submitted electronically via Vendor Registry no later than the date and time specified - April 15 at 1:30 p.m. Any other form of submission will be considered nonresponsive.
Posted: 6/30/2021
Type of Addition: Cancellation Information
Overview: REJECTION NOTICE ON THE 30TH DAY OF JUNE 2021, 21-DES-ITB-493: CONSTRUCTION OF A NET ZERO ENERGY (NZE) SINGLE-FAMILY RESIDENTIAL BUILDING AND SITE IMPROVEMENT AFTER DUE AND PROPER ADVERTISEMENT AND EVALUATION ALL BIDS ARE HEREBY REJECTED NO REVIEW OF DOCUMENTS IS ALLOWED 2100 Clarendon Blvd., Arlington, VA 22201 703-228-3415
Documents:
Posted: 2/17/2021
Question: Good morning from Cindy Kacher, Curtis Ventures Custom Homes. Thank you for today's brief meeting. We will need at least 8 weeks to provide an accurate bid for this project. Additionally, we will need at least a 4 week window for asking questions since sub-contractors will inevitably have questions we will need to convey to you. Will you be extending the deadline for bids to at least 28 April 2021? If so, will you be extending this online and shared Q & A to at least 7 April? Even as a local contractor based in Arlington with local sub-contractors we cannot possibly bid on this with the timeline you propose. Please advise and thank you.
Response: Please refer to Addendum 1 (posted on February 17, 2021).
Posted: 2/18/2021
Question: Hello, Thank you for the information you presented at the meeting yesterday. I had a few follow up questions about the process. The first question is will you move the deadline for questions and final submissions? Given the aggressive time frame that has been put forward we are unable to do our due diligence. We will not be able to invest the time necessary to properly prepare for a request of this scope. If you can verify within the next few days that you will be able to extend the deadline for 8 weeks, we will consider the project. If you cannot we cannot even, consider processing the information you have outlined. The next question is what is driving this process? What are the other over arching goals of this project? I can see the direct benefit of housing individuals but there was a discussion about Net Zero and the other things that are included in this scope. Put another way what are the secondary goals of this project? Community outreach? Beneficial operating costs? Lastly, you have defined the scope of work that is more suitable to 8 story commercial building rather than to residential home building in Arlington. Having lived in Arlington my whole life and worked in home building here the better part of 20 years I was surprised at the form the plans and scope of work have taken. How did you arrive at this? Some background would be helpful in our analysis. If your goal is a new single-family home for DHS I can certainly propose many cost saving measures. But it appears your goals are not exclusively to house people. What was the conversation that led you down this path? Does a local Arlington home builder even make sense for what you are trying to achieve? Your answers to these questions will help me determine whether an Arlington based, Energy efficient, home building firm is potentially the right fit for what you are trying to do. Further, it will help us assess if your goals are compatible with our business model. I will await your reply. Thank you, Andrew Moore
Response: To better answer your questions, please provide specific area in the solicitation to which you would like more clarification.
Posted: 2/18/2021
Question:
Response: Please refer to the addendum (Addendum 1) posted yesterday as bid submission date has been extended. We will work on answering your other questions as soon as possible.
Posted: 2/23/2021
Question: Hello, The 21-DES-ITB-493 form states: COMPANY QUALIFICATIONS: "Bidders shall have three (3) years of experience conducting Net Zero Energy (NZE) projects. The experience shall be work of similar size and scope, construction, re-construction, and maintenance. The Bidder’s obtained project experience shall consist of the following energy conservation measures: • Enhanced thermal building envelope • Geothermal boreholes • Water-source heat pumps with electronically commutated motor (ECM) • Water to the water heat pump for domestic hot water • Photovoltaic solar panels with electrical infrastructure included • Energy recovery ventilators" - on page 9. I have not certified any Net Zero projects but have extensive experience in the other areas listed. Is it required as stated to have 3 years with NZE certifications or just the aspects that go into it? Thanks, Andrew Moore
Response: Providing evidence that incorporate all the appropriate Energy Conservation measures requested in the Invitation for Bid document, and which resulted in near net-zero performance, will also be considered.
Posted: 2/24/2021
Question: Thank you for extending the deadline for questions and for bid submission. Our next question is about the draw schedule. Specifically, could you lead me to the pages in the contract or manual that focus on the timeline for construction draws. Could you tell me what I may expect for a deposit before incurring costs? I would expect to float several hundred thousand dollars between draws. Would that capital be part of the initial deposit? So far I have not found this information in the extensive sets of documents.
Response: There's no draw or deposit provided by the County. Details regarding payments is addressed on pages 18-19 (sections 6 & 7) of the solicitation.
Posted: 2/24/2021
Question: Hello, I received you answer to question #2:"To better answer your questions, please provide specific area in the solicitation to which you would like more clarification. " The point of my question is that I do not see that information anywhere and so I can not point to a specific page or section. As far as I can tell there are several important things that are not addressed in the bid information. #1 Who is funding this? What department, specifically where will the funds come from out of the Arlington County budget. Department? Project? Etc. Is this project currently funded? #2 What are the secondary goals, beyond housing and Net Zero? #3 Who are the people, what is the committee, what organizational structure will award the bid? #4 Can you point me to the documented pre-meetings that led to you choosing this particular project/ structure? These are the same questions I ask all my clients. It is important to understand not only the stated goals but also the underlying goals. And many times I find that when you get past the first questions it leads to more important questions and answers about the project. Thank you. Andrew Moore
Response: • This is a County funded project. The County does not issue any request for work if the project is not funded. • The building is for the Department of Human Services, and the Bureau of Facilities Design and Construction of the County is supporting this effort. • The evaluation committee is not public information at this time. • the Bid will be awarded based on the bid response and the Contractors responsiveness to the bid as well and the Contractors’ capacity to do the work. • The document gives the necessary information for the purpose of bidding, including the contractor and staffing qualifications. • The residence will be the primary home for Arlington adults with disabilities. The project description provides the details necessary for a Contractor to provide a bid cost for the project. • The goals are clear, there are no hidden goals or additional information that the County can provide at this time. The details on page 16 of the Invitation of Bid tells the Bidders what the County needs are for this building.
Posted: 3/1/2021
Question: Is it possible to set up a site visit for the inside of the building and or get photos/video of the inside of the building? We need to have more details about the construction of the building to furnish an accurate bid. For example, we don't know if there is a basement or crawl space.
Response: All videos of the exterior and all interior levels of this existing property are available on this site for viewing by bidders. Accessing the interior of the existing property is not allowed at this time. You can always go to see the exterior of the property at any time.
Posted: 3/1/2021
Question: During the pre-bid meeting a video of the inside of the existing building was referenced, but we were unable to view the video. How can we gain access to this video to better understand existing conditions within the inside of the building?
Response: Six MP4 videos are attached to this solicitation on Vendor Registry as part of Addition 2: Existing Resident Video.
Posted: 3/1/2021
Question: I have attempted to download the Level 1 video 5 times at two different occasions and the following error pops up. Can you confirm the link is valid? We apologize- an error occurred while processing your request. Our technical staff has been notified, and we'll be looking into it very soon. Feel free to contact customer service at cservice@vendorregistry.com or at 844-802-9202 (toll-free).
Response: The link for Level 1 is valid.
Posted: 3/3/2021
Question: The water source heat pumps are shown as Daikin, but local geothermal companies recommend WaterFurnace as an alternate manufacturer for geothermal applications. Is this alternate accpetable?
Response: Water Furnace is listed as an acceptable manufacturer in Specification Section 238126-2.1 (Attachment D - Project Manual pg. 1027)
Posted: 3/9/2021
Question: good morning. could you please address Third Party Commissioning. Is it addressed in the bid documents? If so, specifically where? Will the county reimburse for third party commissioning?
Response: Please refer to Specification # 019113E1 – General Commissioning Requirements, Part 1, paragraph 1.7 DEFINITION, A. Commissioning Authority. Therefore, the Commissioning Authority is a person or entity who will be under a separate contract with the County. The contractor do not need to hire the Commissioning Authority. Please read carefully all of this Specification section and additionally sections 220800 – Commissioning of Plumbing; 230800 – Commissioning of HVAC; 260800 – Commissioning of Electrical which refer to all the requirements of Commissioning, of which the general contractor of this project must comply.
Posted: 3/9/2021
Question: thank you for your answer that the commissioning authority (CxA) is being hired/provided by the owner/county, and as I understand it, that entity will handle all commissioning procedures and the trade contractors will not need to hire a 3rd party commissioning agent. would you please share the Cx agent’s contact information?
Response: Names and contact information of any separate contractors related to this project will only be revealed to the general contractor at contract award. Please read carefully all the following specifications sections: Section # 019113E1 – General Commissioning Requirements; Section # 220800 – Commissioning of Plumbing; Section # 230800 – Commissioning of HVAC; and Section # 260800 - Commissioning of Electrical These sections reference all the requirements of Commissioning on this project, of which the general contractor who is awarded this project must comply.