City of Aztec Quote

Title: RFQ 2025-869 Llano Lift Station Upgrades

Deadline: 4/10/2025 10:00 AM   (UTC-07:00) Mountain Time (US & Canada)

Status: Open

Quote Number: RFQ 2025-869

Description: The City of Aztec will be upgrading the Llano Lift Station control packages. The intent of the upgrade is to replace the existing control panel and eliminate the existing Deragger Pro panel. During the upgrade, the lift station will need to be functional with limited downtime. All installations will be completed while the system is running.
Design considerations have been taken to allow for removal of the existing PLC panel and other functionality while the lift station is operating. Only one pump will be moved to the PLC panel at a time and verified working condition. This includes VFD command and status information (wires), Hand-Off-Auto Selector Switches, and any associated items. All modifications to the site will need to be made without disturbing the functional system. 


Documents:

Documents as of 3/25/2025
RFQ_2025_869_Llano_Lift_Station_Upgrades.pdf
Addition 1

Posted: 3/25/2025

Type of Addition: Revised RFQ 2025-869 Llano Lift Station Upgrades

Overview:

The RFQ has been revised to include the Engineer's prints for the project.

Deadline: 4/10/2025 10:00 AM

Documents:

Posted: 3/25/2025

Type of Addition: Revised RFQ 2025-869 Llano Lift Station Upgrades

Overview:

The RFQ has been revised to include the Engineer's prints for the project.

Deadline: 4/10/2025 10:00 AM

Documents: