SCOPE OF SERVICES

Due to Merritt College’s unique hillside geography and topology, cellular service is very limited throughout the campus and oftentimes lacking.  The unreliability of cellular service on Merritt’s campus impacts safety, communication, as well as the overall learning experience.   The vendor will provide the following:

·       Boost cellular signals from all active carriers: AT&T, T-Mobile, Verizon, etc.

·       Boost 4G/5G cellular signals within and around campus buildings

·       Monitoring application for boosted cell signals

·       Professional installation of all necessary equipment (antennas, repeaters, cable termination, fiber, splitters)

·       Site survey of Merritt College

·       High-Level and Low-Level Design documents to be furnished

·       Cellular boosted signals coverage map (heat-map) of Merritt College

·       Presentation and demonstration of cellular boosting technology to be performed by awarded bidder to project stakeholders at Merritt College

·       Boosted cellular signals shall meet customer requirements for campus cellular reception

The entire project is expected to take no more than two months.  This timeframe also includes all equipment procurement lead times. 


Pre-Bid Meeting Date: 11/16/2021 9:00 AM

Pre-Bid Meeting Details: A Mandatory Pre-Bid Site Walk will be held on November 16, 2021 beginning at 9:00 A.M. Meeting location is in front of S-Building at Merritt College campus, 12500 Campus Dr, Oakland, CA 94619. Masks are required for entry into the building.


Documents:

Documents as of 11/17/2021
Advertisement RFP 21 22 10 MC Cell Booster.pdf
RFP 21 22 10 Merritt College Cellular Booster.docx.pdf
Sign-In Sheet RFP 21 22 10.pdf
Addition 1

Posted: 11/19/2021

Type of Addition: Addendum One

Deadline: 11/29/2021 2:00 PM

Solicitation #: 21-22/10

Documents:

Question 1

Posted: 11/11/2021

Question: Are there specific floor plans for the coverage area being requested? Is this for an over the air booster system or a neutral host traditional cell DAS project?

Response: Please see Addendum One (Merritt-Wifi-Floors.pdf) The vendor will specify which cellular booster technology best meets the needs of this project.

Question 2

Posted: 11/17/2021

Question: 1. Regarding the temporary Horticulture in the Modular / Temp building(s), there are three modular buildings there. Do all three buildings need coverage, or just one of two? 2. Will the Tennis courts be in scope for Cell Boost coverage? If so, is there existing pathway? 3. Will the Soccer field  home stands be in scope for Cell Boost coverage? If so, is there existing pathway that can be used? 4. Will the Visitor soccer field stands be in scope? If so, is there existing pathway that can be used? 5. Will the "practice" Soccer field (adjacent to, and below, the regular Soccer / Track field) be in scope? If so, is there existing pathway? 6. Should we assume that new pathways will be required from the roof of the S-building? 7. If new pathway is required for field / outdoor locations, shall we include trenching in our bid for areas that might require it. 8. Will the solution require 1 set of equipment that is compatible with all carriers, or individual sets of equipment for each individual carrier? 9. Shall a monitoring and/or maintenance agreement be included in the price? If so, what term: 1 year; 3 years; 5 years? 10. As mentioned on the walk, blanketing the parking areas with coverage could interfere with Carrier signals beyond Merritt, and could therefore create a risk that it will not be allowed. Thus, will the parking lot areas be excluded from the scope?

Response: 1. All three 2. NO, please don't include. Please see Addendum One - E8.0-site Plan Merritt.pdf 3. Yes. The current location/equipment was shown during the site tour. Please see Addendum One: E8.0-site Plan Merritt.pdf 4. No. Please see Addendum One: E8.0-site Plan Merritt.pdf 5. No. Please see Addendum One: E8.0-site Plan Merritt.pdf 6. Yes, new pathways should be assumed. 7. No 8. The vendor will specify which cellular booster technology best meets the needs of this project. 9. No. monitoring and maintenance will be done inhouse. [District IT does recommend a maintenance agreement for projects like these, it would be good to get a quote]. 10. No exterior services will be needed. Please concentrate on interior and existing spaces.

Posted: 11/19/2021

Type of Addition: Addendum One

Deadline: 11/29/2021 2:00 PM

Solicitation #: 21-22/10

Documents:

Posted: 11/11/2021

Question: Are there specific floor plans for the coverage area being requested? Is this for an over the air booster system or a neutral host traditional cell DAS project?

Response: Please see Addendum One (Merritt-Wifi-Floors.pdf) The vendor will specify which cellular booster technology best meets the needs of this project.

Posted: 11/17/2021

Question: 1. Regarding the temporary Horticulture in the Modular / Temp building(s), there are three modular buildings there. Do all three buildings need coverage, or just one of two? 2. Will the Tennis courts be in scope for Cell Boost coverage? If so, is there existing pathway? 3. Will the Soccer field  home stands be in scope for Cell Boost coverage? If so, is there existing pathway that can be used? 4. Will the Visitor soccer field stands be in scope? If so, is there existing pathway that can be used? 5. Will the "practice" Soccer field (adjacent to, and below, the regular Soccer / Track field) be in scope? If so, is there existing pathway? 6. Should we assume that new pathways will be required from the roof of the S-building? 7. If new pathway is required for field / outdoor locations, shall we include trenching in our bid for areas that might require it. 8. Will the solution require 1 set of equipment that is compatible with all carriers, or individual sets of equipment for each individual carrier? 9. Shall a monitoring and/or maintenance agreement be included in the price? If so, what term: 1 year; 3 years; 5 years? 10. As mentioned on the walk, blanketing the parking areas with coverage could interfere with Carrier signals beyond Merritt, and could therefore create a risk that it will not be allowed. Thus, will the parking lot areas be excluded from the scope?

Response: 1. All three 2. NO, please don't include. Please see Addendum One - E8.0-site Plan Merritt.pdf 3. Yes. The current location/equipment was shown during the site tour. Please see Addendum One: E8.0-site Plan Merritt.pdf 4. No. Please see Addendum One: E8.0-site Plan Merritt.pdf 5. No. Please see Addendum One: E8.0-site Plan Merritt.pdf 6. Yes, new pathways should be assumed. 7. No 8. The vendor will specify which cellular booster technology best meets the needs of this project. 9. No. monitoring and maintenance will be done inhouse. [District IT does recommend a maintenance agreement for projects like these, it would be good to get a quote]. 10. No exterior services will be needed. Please concentrate on interior and existing spaces.