County of Escambia Quote
Title: Roof Repair for Prison RCO Maintenance Office
Deadline: 5/17/2022 2:30 PM (UTC-06:00) Central Time (US & Canada)
Status: Deadline Expired
Quote Number: FAC_HS_Prison RCO Maint Office_LB
Description: Shingle Roof Repair for RCO Maintenance Office Building
1. Proper staging of materials. Materials shall arrive onsite in their manufacturers labeling and be kept in a watertight/temperature safe environment prior to installation as per all manufacturers’ recommendations that apply.
2. Remove 1,600 SF of existing asphaltic 3-tab shingles and underlayment components down to the lumber decking. Remove and dispose of 60 LF of ridge vent. 200 LF of edge metal components should also be removed and properly disposed of.
3. The moisture damaged lumber deck should then be removed and replaced.
4. New synthetic underlayment (1,600 SF) should then be installed atop the lumber deck per manufacturer recommendations. Ensure the underlayment is positively lapped to prevent water bucking.
5. Install new aluminum edge metal (200 LF) along all rake lines and eaves. The underlayment should transition atop the edge metal at the eave or be stripped in with self-adhered membrane or roofing cement.
6. Install 1,600 SF of new three-tab asphaltic shingles and 60 LF of aluminum ridge vent per manufacturer’s recommendations. Ensure new shingle application adhered to all required wind load specifications. New shingles should be of the aesthetic choosing of the building owner.
The meeting will begin at the location indicated on the map below:
Documents:
Documents as of 4/11/2022 |
---|
Exhibit E_BID Permit App_RCO Maintenance Office.pdf |
Exhibit F_FEMA Clauses.pdf |
Exhibit R_Requirements for Non-Contract Insurance.pdf |
Addition 1
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Addition 2
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Additionally, replace Exhibit E with Exhibit K.
Documents:
Addition 3
Posted: 5/9/2022
Type of Addition: Addendum_Detailed Bid Tab
Documents:
Posted: 4/25/2022
Type of Addition: Addendum 1_Contact Information
Overview: Elizabeth Bush
DCAT Construction Manager
850-595-3450
Posted: 5/3/2022
Type of Addition: Addendum_Pre-Quote Walkthrough and Change in Document
Overview: A non-mandatory pre-quote meeting will be held Tuesday, May 10, 2022 beginning at 12:00 pm. We will meet in the parking lot on the north side of the building identified with the red drop pin on the map shown in the solicitation.
Additionally, replace Exhibit E with Exhibit K.
Documents:
Posted: 5/9/2022
Type of Addition: Addendum_Detailed Bid Tab
Documents: