Central Florida Expressway Authority Sealed Solicitation

Title: SR 429 WIDENING FROM TILDEN ROAD TO FLORIDA'S TURNPIKE; PROJECT 429-154

Deadline: 2/8/2022 1:30 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: ITB-001871

Description: The work consists of providing all labor, materials, equipment, and incidentals necessary to widen SR 429 from Tilden Road to Florida's Turnpike from four (4) general use lanes to six (6) general use lanes. Specifically, the project consists of widening to the inside (median) to accommodate an additional general use travel lane in each direction with full depth shoulders for a portion of the remainder of median areas to facilitate hard shoulder running in the future. Also included is the widening of the mainline bridges within the project limits to accommodate the appropriate shoulder widths, additional general use lanes and ramp modifications as shown in the bidding documents. The work also includes, but is not limited to, construction of sound barriers, overhead sign structures and intelligent transportation systems infrastructure in Orange county.


Pre-Bid Meeting Date: 12/16/2021 10:00 AM

Pre-Bid Meeting Details: The purpose of the meeting will be to discuss requirements of the project in an open forum. Although not mandatory, attendance at the pre-bid meeting is highly recommended.


Documents:

Documents as of 12/6/2021
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents
Login to view documents

PLANHOLDERS:

Date Company Name
12/6/2021 8:01:53 AM GEC
12/6/2021 8:46:25 AM Construction Bid Source
12/6/2021 8:47:56 AM Lane Construction
12/7/2021 8:23:04 AM Gibbs & Register, Inc.
12/7/2021 8:46:28 AM Bentley Group, Inc.
12/7/2021 9:31:55 AM Moffatt & Nichol, Inc.
12/7/2021 9:45:58 AM AWK Consulting Engineers
12/7/2021 2:50:53 PM A2B Engineering, LLC
12/8/2021 10:56:07 AM C & C Silt Fencing Corp
12/8/2021 11:37:58 AM Penn Delmar Power LLC Company
12/8/2021 2:51:58 PM Veritas Steel LLC
12/9/2021 7:36:39 AM CON-SERV, INC
12/9/2021 1:25:07 PM fl research inc.
12/14/2021 12:40:46 PM On Point Surveying, Inc.
12/14/2021 2:34:10 PM Maschmeyer
12/15/2021 7:58:00 AM LB Foster CO
12/16/2021 10:50:01 AM Giralt Enterprises, Inc.
12/16/2021 11:02:45 AM RK&K
12/16/2021 11:03:27 AM Brevard Concrete Paving, Inc.
12/16/2021 3:01:10 PM Statewide Materials
12/16/2021 3:38:43 PM BASE Construction, Inc.
12/17/2021 12:23:39 PM Pacifica Engineering Services
12/18/2021 9:10:30 AM Intelligent Transportation Services, Inc.
12/20/2021 9:20:59 AM VALENCIA CONSTRUCTION GROUP, INC.
12/20/2021 9:41:07 AM MacGillivray & Co Surveyors & Mappers
12/21/2021 10:55:48 AM temple inc
12/21/2021 5:26:44 PM Infrastructure Services, LLC.
12/21/2021 6:58:39 PM H&M Electrical & Underground Utilities, Inc.
1/3/2022 11:11:50 AM MC Squared
1/3/2022 12:58:04 PM Wayne Atkinson Inc
1/3/2022 4:32:03 PM Middlesex Corporation
1/3/2022 8:28:41 PM Kaya Associates, LLC
1/4/2022 1:45:12 AM IMS
1/4/2022 4:05:35 AM Mrs.
1/4/2022 10:11:43 AM The Corradino Group
1/5/2022 7:50:50 AM COLECON
1/6/2022 10:18:01 AM Custom Rock Formliner
1/6/2022 1:35:50 PM S&ME
1/7/2022 2:33:23 PM ARDAMAN & ASSOCIATES
1/7/2022 3:17:18 PM C. Slagter Construction, Inc.
1/7/2022 3:41:43 PM Watson Bowman Acme Corp
1/9/2022 3:09:57 PM Atlas Engineering Group Inc
1/10/2022 12:13:47 PM Dodge Data & Analytics
1/17/2022 2:14:21 PM Inwood Consulting Engineers
1/18/2022 12:53:26 PM TCB Trucking
1/18/2022 1:23:25 PM Gregori Construction Inc.
1/20/2022 1:34:49 PM Olympus Painting Contractors Inc
1/24/2022 3:48:52 PM Florida Structural Steel
1/25/2022 3:17:57 PM Pedelta
1/25/2022 4:01:12 PM MC Squared, Inc.
1/25/2022 4:30:24 PM United Fiberglass of America
1/28/2022 2:21:20 PM Roadway Construction Products
1/31/2022 9:33:18 AM Arrive Alive Traffic Control
1/31/2022 9:36:39 AM Southern Striping Solutions, LLC.
1/31/2022 9:37:48 PM RFE Construction & Fence Services, Inc
2/1/2022 7:16:57 AM Temple, Inc.
2/1/2022 9:13:05 AM Tricon Precas LTD
2/1/2022 8:05:09 PM Link Systems, LLC
2/1/2022 8:34:43 PM Kiewit Infrastructure South Co.
2/1/2022 10:32:29 PM AG Ltd
2/2/2022 1:50:27 AM dodge data and analytics
2/2/2022 10:28:38 AM MC Squared
2/2/2022 11:46:13 AM SESCO Lighting
2/2/2022 12:48:04 PM SEMA Construction, Inc.
2/2/2022 4:22:14 PM Southern Manufacturing/ Earnest Products
2/3/2022 8:51:41 AM Nadic Engineering Services, Inc.
2/3/2022 9:19:38 AM Ferguson Water Works
2/3/2022 9:34:50 AM Surface preparation technologies llc
2/3/2022 10:11:17 AM AE Engineering, Inc.
2/3/2022 10:43:29 AM Interstate Signways
2/3/2022 12:00:36 PM Kisinger Campo & Associates, Corp. (KCA)
2/4/2022 7:44:03 AM Traffic Management Solutions, Inc.
2/4/2022 11:04:30 AM Consolidated Pipe & Supply Co., Inc.
2/4/2022 2:31:22 PM Universal Signs & Accessories
2/4/2022 4:18:48 PM TShayEnterprise
2/6/2022 1:38:45 PM Gulf Coast Rebar Inc.
2/7/2022 7:47:41 AM The Reinforced Earth Company
2/7/2022 9:46:00 AM John B. Webb & Associates
2/7/2022 1:46:56 PM Pre-Cast Specialties, LLC
2/7/2022 2:10:05 PM Intertek/PSI (Professional Service Industries,Inc.)
2/7/2022 2:25:49 PM ET&B, Inc
2/7/2022 2:48:32 PM Finishing Systems of Florida
2/7/2022 2:56:49 PM Straight Edge COncrete LLC
2/7/2022 8:58:57 PM RFx Analyst, Inc.
2/8/2022 8:06:16 AM ASAP Installations
2/8/2022 9:54:55 AM Daktronics, Inc.
2/8/2022 1:26:49 PM ASAP Installations
2/8/2022 1:35:30 PM Conti
2/8/2022 1:37:11 PM CEMEX
2/8/2022 2:26:08 PM Danton Hydroblasting
2/8/2022 2:54:20 PM JC Machine Works Corp
2/8/2022 2:55:23 PM Standard Concrete Products, Inc.
2/8/2022 3:00:03 PM Southland Construction, Inc.
2/8/2022 3:01:48 PM Nadic Engineering Services
2/8/2022 3:18:58 PM JB Supply LLC
2/8/2022 3:23:44 PM PSI
2/8/2022 4:02:21 PM Triad Metals
2/8/2022 4:43:33 PM Harris Rebar
2/8/2022 4:53:32 PM CDM Smith
2/8/2022 5:27:31 PM Sacyr
2/9/2022 5:49:54 AM Mill-It Corporation
2/9/2022 8:12:20 AM Ram Tool And Supply
2/9/2022 8:56:51 AM Flotech Environmental, LLC
2/9/2022 9:06:01 AM Chinchor Electric, Inc.
2/9/2022 9:08:02 AM Pearls Construction, LLC
2/9/2022 9:32:26 AM Surface Preparation Technologies, LLC
2/9/2022 11:00:09 AM Bob's Barricades
2/9/2022 12:14:29 PM T.Y. Lin International
2/9/2022 12:20:09 PM Dodge Data & Analytics
2/9/2022 12:24:22 PM SiteScope Inc.
2/9/2022 12:40:12 PM Smith Site Development South LLC
2/9/2022 1:28:20 PM Hubbard Construction Company
2/9/2022 1:29:34 PM Penhall Company
2/9/2022 1:36:04 PM Skanska USA Civil Southeast Inc.
2/9/2022 1:38:26 PM Elipsis Engineering & Consulting LLC
2/9/2022 1:43:42 PM Qualis Concrete LLC
2/9/2022 1:53:45 PM Ranger Construction Industries, Inc.
2/9/2022 1:54:36 PM Shelby Erectors
2/9/2022 1:57:44 PM Tierra, Inc
2/9/2022 2:00:10 PM Central Florida Transport, LLC
2/9/2022 2:05:41 PM Ranger Construction
2/9/2022 2:10:09 PM The Lane Construction Corporation
2/9/2022 2:32:17 PM Earth Tech, LLC
2/9/2022 3:53:02 PM JMT
2/9/2022 3:55:47 PM RS&H
2/9/2022 4:04:35 PM D-MAC Industries Inc.
2/9/2022 4:18:41 PM United Signs and Signals
2/10/2022 6:11:54 AM DS Brown Co
2/10/2022 7:47:59 AM PAW Materials, Inc
2/10/2022 8:21:02 AM Concrete Cutting & Breaking Co.
2/10/2022 9:22:06 AM Kimley-Horn and Associates, Inc.
2/10/2022 10:00:10 AM Southern Development & Construction
2/10/2022 4:50:54 PM Preferred Materials Inc
2/11/2022 10:58:05 AM Traffic Control Devices, LLC
2/11/2022 12:23:29 PM Bonn J Contracting Inc. of FL
2/11/2022 4:25:20 PM Synergy Earth Systems, LLC
2/14/2022 11:25:12 AM Traffic Engineering and Management
2/14/2022 12:54:10 PM Florasod
2/14/2022 1:05:02 PM mc squared, Inc
2/17/2022 8:29:08 AM Elipsis Engineering & Consulting LLC
2/18/2022 10:07:41 AM Dane Construction and Company, Inc.
2/18/2022 10:09:54 AM Superior Roadway Services
2/22/2022 1:59:38 PM JD Fields & Company
2/23/2022 2:51:50 PM North America Procurement Council Inc., PBC
2/24/2022 11:06:42 AM Watson Civil Construction, Inc.
2/28/2022 10:48:17 AM Multilink Inc
3/1/2022 11:43:16 AM Steel Dynamics Inc
3/1/2022 12:56:10 PM Reliable Constructors, Inc.
3/2/2022 12:11:48 PM Highway Safety Devices, Inc.
3/4/2022 11:16:12 AM Southeast Highway
3/6/2022 11:48:43 AM Junior Davis Construction Company, Inc.
3/7/2022 9:06:49 AM Lane Construction Corp.
3/10/2022 11:00:04 AM Spring Precast LLC
3/10/2022 11:00:05 AM Horizon Engineering Group
3/10/2022 11:02:23 AM The Middlesex Corporation
3/10/2022 11:02:57 AM Kiewit Infrastructure South Co.
3/10/2022 11:03:11 AM Hubbard Construction Company
3/10/2022 11:04:18 AM Sacyr
3/10/2022 11:07:00 AM Leware Construction Company
3/10/2022 11:07:09 AM CW Roberts Contracting, Inc.
3/10/2022 11:07:13 AM MRM Construction LLC
3/10/2022 11:09:28 AM Consor
3/10/2022 11:10:32 AM SEMA Construction, Inc.
3/10/2022 11:17:39 AM Concrete Impressions of Florida, Inc.
3/10/2022 11:19:58 AM Tensor Engineering
3/10/2022 11:21:57 AM Waterblasting, LLC
3/10/2022 11:38:50 AM Oglesby Construction Inc.
3/10/2022 12:08:57 PM Construction Journal
3/10/2022 2:06:29 PM ASAP Specialty Foundations, LLC
3/10/2022 3:38:36 PM Jr. Davis Construction Co., Inc.
3/10/2022 4:05:18 PM ConstructConnect
3/11/2022 9:49:22 AM Dodge Data
3/12/2022 4:07:31 AM Dodge Data & Analytics
3/13/2022 9:22:01 AM A2 Group, Inc.
3/14/2022 8:00:31 AM Cone & Graham, Inc.
3/14/2022 1:11:46 PM Prince Contracting, LLC
3/15/2022 11:25:41 AM Granite Construction
3/15/2022 2:34:24 PM Universal Engineering Sciences
3/16/2022 4:07:45 PM Blount-Sanford Contracting Company, Inc.
3/16/2022 6:35:04 PM Shelby Erectors, Inc.
3/17/2022 9:54:00 AM TEG Engineering
3/18/2022 8:11:26 AM Dane Construction and Company, Inc.
3/22/2022 8:26:21 AM Traffic Control Products of Fl, Inc
3/22/2022 11:50:26 AM MIMS Construction Company
3/23/2022 10:19:43 AM Chubb Surety
3/23/2022 2:35:25 PM RAINBOW DISTRIBUTORS USA
3/24/2022 12:47:00 PM HNTB
3/25/2022 4:43:42 PM exp U.S. services inc
3/31/2022 9:32:38 AM Scalar Consulting Group Inc.
4/4/2022 3:44:33 PM Zorro Engineering Consultants
4/4/2022 4:25:39 PM ADS
4/6/2022 8:14:04 PM BASE Consultants
4/12/2022 12:04:45 PM Genesis Project Controls Group, LLC
4/13/2022 11:56:18 AM Precision Contracting Services, Inc.
4/14/2022 5:18:03 PM Bob's Barricades, Inc.
4/19/2022 4:38:21 PM AngleRight Surveying, LLC
4/20/2022 8:49:22 AM Ledstar, Inc.
4/20/2022 11:17:32 AM Transportation Systems Inc.
4/20/2022 1:19:50 PM Dewberry Engineers Inc.
4/25/2022 3:35:51 PM Louis Berger
4/29/2022 11:34:21 AM Central Florida Transport, LLC
5/5/2022 2:11:59 PM AECOM
5/6/2022 7:51:32 AM The Arnold Group of Florida, Inc.
5/13/2022 9:45:12 AM Statewide Materials
5/16/2022 9:20:06 PM WesDon Tax Consultants
5/17/2022 8:32:04 AM DRMP Inc.
5/17/2022 2:44:47 PM geotechnical foundations
6/13/2022 1:40:50 PM Lane Construction
6/13/2022 3:37:06 PM KCG Transportation Services
6/14/2022 11:07:32 AM Dixie Lime And Stone Company
6/14/2022 4:47:07 PM RK&K
6/23/2022 1:32:42 PM TranSystems
6/24/2022 3:56:59 PM Belmont Construction Inc.
6/27/2022 3:25:09 PM Gosalia Concrete Constructors
7/18/2022 8:54:24 AM Scalar Consulting Group Inc.
7/26/2022 3:49:59 PM DRMP
7/28/2022 6:08:25 PM McCarthy environmental
8/4/2022 10:05:29 AM Gosalia Concrete Constructors, Inc.
8/10/2022 5:05:30 PM Seminole Precast LLC
8/17/2022 9:40:37 AM Horizon Engineeering Group, Inc.
8/26/2022 9:40:40 AM Cloverleaf Corporation
9/13/2022 4:33:16 PM Buckeye Construction Inc, Davis Land Company
11/29/2022 10:02:10 AM J. Mori Painting, Inc.
12/16/2022 9:10:49 AM RS&H, Inc.
12/26/2022 6:06:31 PM DRMP
1/1/2023 9:43:28 AM Vanasse Hangen Brustlin, Inc.
1/9/2023 1:45:14 PM DRMP, Inc.
1/26/2023 4:34:07 PM Protean Design Group, Inc.
2/23/2023 9:42:06 AM Stantec
4/20/2023 10:38:05 AM Dewberry
5/11/2023 11:35:40 AM DRMP Inc.
6/15/2023 10:30:10 AM KEITH
7/19/2023 3:50:53 PM Vecellio & Grogan, Inc.
7/25/2023 10:48:50 AM UES
7/27/2023 5:31:28 PM Integrated Synergy Inc.
10/16/2023 4:21:10 PM VHB
11/1/2023 1:16:23 PM Florida Industrial Electric
11/28/2023 10:23:25 AM Preferred Materials, Inc.
1/11/2024 10:09:38 AM Superior Construction Company Southeast, LLC
2/12/2024 12:51:41 AM PWXPress
2/29/2024 10:16:26 AM AECOM
3/4/2024 11:49:05 AM MAPEI Corp.
4/9/2024 7:43:42 AM Atlantic Pipe Services, LLC
5/30/2024 3:08:09 PM SACYR
Addition 1

Posted: 12/6/2021

Type of Addition: Public Notices

Overview: 001871 Prebid Meeting Notice 12-16-2021 and 001871 Bid Opening Notice 1-18-2022

Documents:

Addition 2

Posted: 12/16/2021

Type of Addition: Pre-Bid Attendance Sheet

Solicitation #: 001871

Documents:

Addition 3

Posted: 1/3/2022

Type of Addition: Addendum No. A

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated December 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. 

Deadline: 2/8/2022 1:30 PM

Solicitation #: 001871

Documents:

Addition 4

Posted: 1/4/2022

Type of Addition: Revised Public Notice

Overview: REVISED 01-001871 Bid Opening Notice 2-8-2022

Documents:

Addition 5

Posted: 1/7/2022

Type of Addition: Addendum No. 1

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated December 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 12 pages and the following attachments: Revised Plansheets; and the following five (5) Reference Documents: 429-154.KMZ file (link); OC MOT PERMIT APP 3.12.2020.pdf; OC Online MOT Application Instructions.pdf; WG Right-of-Way Permit Application (Doc# 147) - PDF-Form_201904290957341971.pdf and SR 429-154 Roll Plot.pdf.

Solicitation #: 001871

Documents:

Addition 6

Posted: 1/24/2022

Type of Addition: Addendum No. 2

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated December 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 12 pages and the following attachments: Revised Plansheets; and the following six (6) pdf Reference Documents: Geotech Reports (CR 535_07-14-2021, Misc Structures_07-14-2021, Roadway Report_08-10-21, Stoneybrook West Pkwy (North)_7-14-2021, Stoneybrook West Pkwy (South)_07-14-2021, and Wall Structures_08-10-21).

Solicitation #: 001871

Documents:

Addition 7

Posted: 2/2/2022

Type of Addition: Addendum No. 3

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated December 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 14 pages and the following attachments: Revised Plansheets; Revised Bid Form; and the Fuel Adjustment Sheet.

Solicitation #: 001871

Documents:

Addition 8

Posted: 2/8/2022

Type of Addition: Bid Opening Minutes 001871

Overview: The Bid Opening for SR 429 WIDENING FROM TILDEN ROAD TO FLORIDA’S TURNPIKE; Project No. 429-154; ITB-001871 was held at a duly noticed meeting on Tuesday, February 8, 2022, commencing at 1:30 p.m. at the Central Florida Expressway Authority Administrative Building, Orlando, Florida.

Documents:

Addition 9

Posted: 2/9/2022

Type of Addition: In Review

Addition 10

Posted: 3/10/2022

Type of Addition: Bid Tabulation 001871

Overview:

Documents:

Addition 11

Posted: 3/10/2022

Type of Addition: Award Information 001871

Overview: On March 10, 2022 the CFX Board members awarded the Contract to the following firm, contingent upon final execution of the contract by both parties: The Middlesex Corporation, One Spectacle Pond Road, Littleton, MA 01460

Amount: $97,659,429.92

Documents:

Posted: 12/6/2021

Type of Addition: Public Notices

Overview: 001871 Prebid Meeting Notice 12-16-2021 and 001871 Bid Opening Notice 1-18-2022

Documents:

Posted: 12/16/2021

Type of Addition: Pre-Bid Attendance Sheet

Solicitation #: 001871

Documents:

Posted: 1/3/2022

Type of Addition: Addendum No. A

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated December 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. 

Deadline: 2/8/2022 1:30 PM

Solicitation #: 001871

Documents:

Posted: 1/4/2022

Type of Addition: Revised Public Notice

Overview: REVISED 01-001871 Bid Opening Notice 2-8-2022

Documents:

Posted: 1/7/2022

Type of Addition: Addendum No. 1

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated December 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 12 pages and the following attachments: Revised Plansheets; and the following five (5) Reference Documents: 429-154.KMZ file (link); OC MOT PERMIT APP 3.12.2020.pdf; OC Online MOT Application Instructions.pdf; WG Right-of-Way Permit Application (Doc# 147) - PDF-Form_201904290957341971.pdf and SR 429-154 Roll Plot.pdf.

Solicitation #: 001871

Documents:

Posted: 1/24/2022

Type of Addition: Addendum No. 2

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated December 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 12 pages and the following attachments: Revised Plansheets; and the following six (6) pdf Reference Documents: Geotech Reports (CR 535_07-14-2021, Misc Structures_07-14-2021, Roadway Report_08-10-21, Stoneybrook West Pkwy (North)_7-14-2021, Stoneybrook West Pkwy (South)_07-14-2021, and Wall Structures_08-10-21).

Solicitation #: 001871

Documents:

Posted: 2/2/2022

Type of Addition: Addendum No. 3

Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated December 2021, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 14 pages and the following attachments: Revised Plansheets; Revised Bid Form; and the Fuel Adjustment Sheet.

Solicitation #: 001871

Documents:

Posted: 2/8/2022

Type of Addition: Bid Opening Minutes 001871

Overview: The Bid Opening for SR 429 WIDENING FROM TILDEN ROAD TO FLORIDA’S TURNPIKE; Project No. 429-154; ITB-001871 was held at a duly noticed meeting on Tuesday, February 8, 2022, commencing at 1:30 p.m. at the Central Florida Expressway Authority Administrative Building, Orlando, Florida.

Documents:

Posted: 2/9/2022

Type of Addition: In Review

Posted: 3/10/2022

Type of Addition: Bid Tabulation 001871

Overview:

Documents:

Posted: 3/10/2022

Type of Addition: Award Information 001871

Overview: On March 10, 2022 the CFX Board members awarded the Contract to the following firm, contingent upon final execution of the contract by both parties: The Middlesex Corporation, One Spectacle Pond Road, Littleton, MA 01460

Amount: $97,659,429.92

Documents: