Sinclair Community College Sealed Solicitation

Title: Utility Tunnel Restoration, Phase II

Deadline: 8/18/2023 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Solicitation Number: SCC-002406

Description: Project Description:

This project will be a phase II follow on repair to the utility tunnel located below Lot C under Building 12 to include repair or replacement of electrical conduit and associated wiring.

The selected design team will serve as Architect/Engineer (A/E), and shall have extensive experience in State of Ohio public Design-Bid-Build (DBB) projects. A/E shall be familiar with all methods and procedures for executing Ohio public DBB projects, and will conduct programming (POR) and concept development with Sinclair staff, provide design documents, arrange for bidding, and provide construction administration of project on Owner’s behalf, and shall have broad experience related to general building renovation construction. A/E shall provide interior design services including all finish selections, samples & presentations for approval, as well as furniture selection, layout & design with separate by-invitation furniture bid package. A/E shall include concept design for signage and displays to be included in project under scope of General Contractor. A/E shall utilize an acoustic engineer or consultant for design of Production Studio to eliminate any noise and disruption to studio function. Important elements in the A/E selection process will be experience in ensuring protection of building interiors and surrounding campus property as well as mitigating disruptions to students, visitors and staff. The firms must have experience in the complete design and monitoring of the work to be performed, to ensure work meets all codes and requirements, and to ensure subsequent warranties. A/E shall demonstrate experience and competencies related to innovative learning spaces encompassing leading-edge working environments for distance learning, faculty training, multimedia technologies and hands-on experience-based learning.
Scope of Services: 
The selected A/E, as a portion of its required Scope of Services and prior to submitting its proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the Architect/Engineer Agreement detailed cost components to address the Owner’s project requirements. Participate in the Encouraging Diversity, Growth& Equity (EDGE) Program as required by statute and the Agreement.

As required by the Agreement, and as properly authorized, provide the following categories of services: Program Verification, Schematic Design, Design Development, Construction Document Preparation, Bid and Award Support, Conformed Documents, Construction Administration, Post-Construction, and Additional Services of all types.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov

During the construction period, provide not less than 4 hours (excluding travel time) on-site construction administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project, all having relevant and appropriate types of construction administration experience. 
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form F110-330), below is a list of relevant scope of work requirements for this RFQ:

1. Design of the electrical system replacement.
2. Bidding and award support.
3. Project over site during construction.
4. Construction and closeout support.


Documents:

Documents as of 7/13/2023
Login to view documents
Addition 1

Posted: 7/20/2023

Type of Addition: Addendum

Documents:

Posted: 7/20/2023

Type of Addition: Addendum

Documents: