Central Florida Expressway Authority Sealed Solicitation
Title: SR 528 WIDENING FROM NARCOOSSEE ROAD TO SR 417; PROJECT 528-160
Deadline: 2/17/2022 1:30 PM (UTC-05:00) Eastern Time (US & Canada)
Status: Awarded
Solicitation Number: ITB-001883
Description: The work consists of providing all labor, materials, equipment and incidentals necessary to widen SR 528 from Narcoossee Road to SR 417. Specifically, the project consists of widening to the outside to accommodate an additional general use travel lane in the eastbound direction, widening to the inside to accommodate the appropriate inside shoulder width, and widening to provide a two-lane exit at SR 417. Additional elements include milling and resurfacing, drainage, lighting, signing and pavement markings, Utilities, and ITS.
Pre-Bid Meeting Date: 1/25/2022 10:00 AM
Pre-Bid Meeting Details: The purpose of the meeting will be to discuss requirements of the project in an open forum. Although not mandatory, attendance at the pre-bid meeting is highly recommended.
Documents:
Documents as of 1/14/2022 |
---|
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
Login to view documents |
PLANHOLDERS:
Date | Company Name |
---|---|
1/17/2022 8:20:57 AM | TEG Engineering |
1/17/2022 8:51:54 AM | Hormac Construction Group, Inc. |
1/17/2022 12:35:20 PM | Atlas Engineering Group Inc |
1/17/2022 1:49:27 PM | Webber, LLC |
1/17/2022 3:18:05 PM | Underwater Mechanix |
1/17/2022 4:31:40 PM | On Point Surveying, Inc. |
1/18/2022 2:59:55 AM | Dodge Data & Analytics |
1/18/2022 8:11:35 AM | A2B Engineering, LLC |
1/18/2022 9:48:00 AM | Statewide Materials |
1/18/2022 9:53:18 AM | ARDAMAN & ASSOCIATES |
1/18/2022 10:01:59 AM | Advanced Cabling Solutions, Inc |
1/18/2022 10:01:59 AM | AWK Consulting Engineers |
1/18/2022 11:44:09 AM | Inwood Consulting Engineers |
1/18/2022 1:39:01 PM | Gregori Construction Inc. |
1/18/2022 2:56:10 PM | JMT |
1/18/2022 3:03:00 PM | OM Engineering Services |
1/24/2022 12:10:33 PM | Interstate Signways |
1/24/2022 4:14:18 PM | KEITH |
1/25/2022 9:00:23 AM | Gulf Coast Rebar Inc. |
1/25/2022 9:27:10 AM | Universal Engineering Sciences |
1/25/2022 11:48:20 AM | VALENCIA CONSTRUCTION GROUP, INC. |
1/25/2022 11:50:45 AM | Southland Construction, Inc. |
1/25/2022 11:53:21 AM | Superior Construction Company Southeast, LLC |
1/25/2022 12:05:11 PM | Cathcart Construction Company - Florida LLC |
1/25/2022 12:38:36 PM | Gosalia Concrete Constructors |
1/27/2022 9:01:53 AM | Veritas Steel LLC |
1/27/2022 9:38:07 PM | Construction Bid Source |
1/28/2022 12:00:28 PM | SICE, Inc. |
1/28/2022 12:39:57 PM | TShayEnterprise |
1/31/2022 10:01:35 AM | Blount-Sanford Contracting Company, Inc. |
2/1/2022 9:50:49 AM | Nadic Engineering Services, Inc. |
2/1/2022 2:22:27 PM | Rogers Environmental, Inc. |
2/2/2022 9:50:22 AM | Consolidated Pipe & Supply Co., Inc. |
2/2/2022 3:55:48 PM | Standard Concrete Products, Inc. |
2/4/2022 9:18:43 AM | County Materials |
2/7/2022 2:06:26 PM | ET&B, Inc |
2/8/2022 1:34:30 AM | Porter Pipe Installation |
2/8/2022 9:01:46 AM | John B. Webb & Associates |
2/8/2022 10:10:39 AM | JB Supply LLC |
2/8/2022 1:32:22 PM | CEMEX |
2/8/2022 1:49:35 PM | JD Fields & Company |
2/8/2022 2:09:17 PM | MIMS Construction Company |
2/8/2022 2:21:38 PM | Sacyr Construction |
2/8/2022 2:27:29 PM | MacGillivray & Co Surveyors & Mappers |
2/8/2022 3:15:29 PM | Qualis Concrete LLC |
2/8/2022 3:22:57 PM | CMC |
2/8/2022 3:46:35 PM | The Reinforced Earth Company |
2/8/2022 7:16:10 PM | Spring Precast LLC |
2/9/2022 8:17:38 AM | Bonn J Contracting Inc. of FL |
2/9/2022 9:09:44 AM | Shelby Erectors |
2/9/2022 10:56:54 AM | Migrant Contractors Inc |
2/9/2022 11:03:42 AM | Striping Service and Supply, LLC |
2/9/2022 12:22:04 PM | SiteScope Inc. |
2/10/2022 8:53:17 AM | Pre-Cast Specialties, LLC |
2/10/2022 12:17:34 PM | The Lane Construction Corporation |
2/10/2022 3:45:29 PM | ASAP Installations |
2/11/2022 10:29:53 AM | Gibbs & Register, Inc. |
2/11/2022 10:43:57 AM | Intertek/PSI (Professional Service Industries,Inc.) |
2/11/2022 10:44:33 AM | United Signs and Signals |
2/11/2022 11:12:52 AM | Earth Tech, LLC |
2/11/2022 1:29:04 PM | Ajax Paving Industries of Florida, LLC |
2/11/2022 1:31:42 PM | AngleRight Surveying, LLC |
2/11/2022 2:45:16 PM | Roadway Construction Products |
2/12/2022 12:45:02 AM | AG Ltd |
2/13/2022 6:09:54 PM | Link Systems, LLC |
2/14/2022 7:39:40 AM | Dane Construction and Company, Inc. |
2/14/2022 9:13:08 AM | Surface preparation technologies llc |
2/14/2022 9:28:51 AM | Maschmeyer |
2/14/2022 12:44:32 PM | Florasod |
2/14/2022 11:04:35 PM | RFx Analyst, Inc. |
2/15/2022 7:33:17 AM | Central Florida Underground |
2/15/2022 12:53:53 PM | dodge data and analytics |
2/15/2022 1:40:18 PM | Rebar Pro Services Inc |
2/15/2022 3:36:12 PM | MC Squared, Inc. |
2/15/2022 3:43:31 PM | PAW Materials, Inc |
2/15/2022 4:12:54 PM | ASAP Installations |
2/16/2022 12:42:42 AM | D-MAC Industries Inc. |
2/16/2022 8:48:50 AM | J. Mori Painting, Inc. |
2/16/2022 10:01:46 AM | Penhall Company |
2/16/2022 10:02:51 AM | STAR TRUCKING & CONSTRUCTION SERVICES, INC. |
2/17/2022 7:32:10 AM | Multilink Inc |
2/17/2022 10:45:51 AM | Ferguson Water Works |
2/17/2022 1:30:03 PM | Traffic Control Devices, LLC |
2/17/2022 1:30:09 PM | Ranger Construction |
2/17/2022 1:30:51 PM | Conti |
2/17/2022 4:15:08 PM | ASAP Specialty Foundations, LLC |
2/17/2022 4:37:19 PM | Bob's Barricades |
2/17/2022 5:00:40 PM | Florida Industrial Electric |
2/18/2022 8:11:43 AM | Pacifica Engineering Services |
2/18/2022 9:42:55 AM | SEMA Construction, Inc. |
2/18/2022 9:43:03 AM | Kiewit Infrastructure South Co. |
2/18/2022 9:44:26 AM | Surface Preparation Technologies, LLC |
2/18/2022 9:48:52 AM | The Lane Construction Corporation |
2/18/2022 9:49:42 AM | Concrete Cutting & Breaking Co. |
2/18/2022 9:50:42 AM | Turtle Infrastructure Partners, LLC |
2/18/2022 9:51:26 AM | CW Roberts Contracting, Inc. |
2/18/2022 9:52:29 AM | Granite Construction |
2/18/2022 10:04:44 AM | Brevard Concrete Paving, Inc. |
2/18/2022 10:12:04 AM | Hubbard Construction Company |
2/18/2022 10:13:01 AM | Preferred Materials Inc |
2/18/2022 10:18:49 AM | Danton Hydroblasting |
2/18/2022 10:22:21 AM | Southern Development & Construction |
2/18/2022 10:39:51 AM | Vanasse Hangen Brustlin, Inc. |
2/18/2022 11:00:52 AM | RS&H |
2/18/2022 11:34:41 AM | Southeast Highway |
2/18/2022 1:02:27 PM | Nadic Engineering Services |
2/18/2022 1:39:14 PM | FCS Industries Corp |
2/18/2022 3:44:28 PM | A2 Group, Inc. |
2/18/2022 5:13:09 PM | Junior Davis Construction Company, Inc. |
2/21/2022 8:53:53 AM | Leware Construction Company |
2/21/2022 9:13:36 AM | Dane Construction and Company, Inc. |
2/21/2022 10:08:15 AM | Quest Corporation of America, Inc. |
2/21/2022 12:24:14 PM | mc squared, Inc |
2/22/2022 10:34:29 AM | SESCO Lighting |
2/22/2022 11:59:48 AM | CDM Smith |
2/22/2022 12:17:01 PM | Temple, Inc. |
2/22/2022 11:18:47 PM | CCC Site Development |
2/23/2022 9:28:31 AM | Pearls Construction, LLC |
2/23/2022 3:53:08 PM | Mill-It Corporation |
2/23/2022 6:39:24 PM | Southern Striping Solutions, LLC. |
2/23/2022 10:52:05 PM | Dodge Data |
2/24/2022 11:05:51 AM | Watson Civil Construction, Inc. |
2/24/2022 12:24:32 PM | Ranger Construction |
2/24/2022 4:36:05 PM | Traffic Engineering and Management |
2/25/2022 1:53:54 AM | Dodge Data & Analytics |
2/25/2022 9:54:58 AM | Carter Electric, Inc. |
2/28/2022 10:56:17 AM | Integrated Synergy Inc. |
3/1/2022 10:32:14 AM | Construction Journal |
3/1/2022 12:04:00 PM | A.J. Murray & Sons, Inc. |
3/1/2022 12:55:09 PM | Reliable Constructors, Inc. |
3/2/2022 3:24:01 PM | North America Procurement Council Inc., PBC |
3/2/2022 4:46:55 PM | Pevida Highway Designers |
3/4/2022 9:03:56 AM | Middlesex Paving, LLC. |
3/9/2022 11:31:13 AM | Engineered Pole Structures, LLC |
3/10/2022 11:13:46 AM | Sacyr |
3/10/2022 11:14:24 AM | AC Signs LLC |
3/10/2022 11:15:47 AM | Consor |
3/10/2022 11:15:58 AM | Ranger Construction Industries, Inc. |
3/10/2022 11:16:50 AM | Hubbard Construction Company |
3/10/2022 11:20:15 AM | Horizon Engineering Group |
3/10/2022 11:20:43 AM | Concrete Impressions of Florida, Inc. |
3/10/2022 11:23:01 AM | The Arnold Group of Florida, Inc. |
3/10/2022 11:24:26 AM | Preferred Materials, Inc. |
3/10/2022 1:47:04 PM | Lane Construction Corp. |
3/10/2022 1:57:00 PM | Universal Signs & Accessories |
3/10/2022 2:13:35 PM | Dixie Lime And Stone Company |
3/10/2022 2:41:34 PM | Precision Contracting Services, Inc. |
3/10/2022 3:23:46 PM | SEMA Construction, Inc. |
3/10/2022 3:26:10 PM | Bob's Barricades, Inc. |
3/10/2022 3:35:41 PM | Jr. Davis Construction Co., Inc. |
3/12/2022 12:24:17 PM | Statewide Materials |
3/13/2022 9:21:26 AM | A2 Group, Inc. |
3/14/2022 11:13:23 AM | Kimley-Horn and Associates, Inc. |
3/14/2022 12:28:31 PM | Prince Contracting, LLC |
3/16/2022 12:00:36 PM | EXP US Services, Inc |
3/16/2022 6:34:10 PM | Shelby Erectors, Inc. |
3/23/2022 10:07:33 AM | Chubb Surety |
3/23/2022 2:36:21 PM | RAINBOW DISTRIBUTORS USA |
3/24/2022 12:46:18 PM | HNTB |
3/30/2022 12:57:19 PM | ConstructConnect |
4/4/2022 4:18:27 PM | ADS |
4/6/2022 8:12:52 PM | BASE Consultants |
4/7/2022 8:38:49 AM | DRMP Inc. |
4/12/2022 12:00:37 PM | Genesis Project Controls Group, LLC |
4/14/2022 1:17:47 PM | Traffic Control Products of Fl, Inc |
4/15/2022 3:07:30 PM | Daktronics, Inc. |
4/20/2022 11:16:03 AM | Transportation Systems Inc. |
4/20/2022 1:42:43 PM | Chinchor Electric, Inc. |
4/27/2022 10:50:25 AM | Ledstar, Inc. |
4/29/2022 2:54:35 PM | Dewberry Engineers Inc. |
5/17/2022 8:35:50 AM | DRMP Inc. |
5/17/2022 11:06:17 AM | exp U.S. services inc |
6/4/2022 11:15:11 AM | Atlantic Pipe Services, LLC |
6/13/2022 1:24:09 PM | KCI Technologies, Inc. |
6/13/2022 1:40:12 PM | Lane Construction |
6/13/2022 3:29:24 PM | KCG Transportation Services |
6/21/2022 10:11:59 AM | Sacyr |
6/21/2022 4:45:16 PM | GAI Consultants |
6/23/2022 1:43:43 PM | TranSystems |
6/24/2022 3:54:05 PM | Belmont Construction Inc. |
7/18/2022 8:50:44 AM | Scalar Consulting Group Inc. |
9/13/2022 1:07:13 PM | RK&K |
11/3/2022 11:11:28 PM | PMA |
11/29/2022 8:39:35 AM | The Balmoral Group |
12/16/2022 9:09:36 AM | RS&H, Inc. |
1/24/2023 10:21:39 AM | Horizon Engineeering Group, Inc. |
3/20/2023 1:17:59 PM | C. Slagter Construction, Inc. |
3/21/2023 9:37:22 AM | Ram Tool And Supply |
5/16/2023 10:04:53 AM | GWP CONSTRUCTION INC |
6/22/2023 10:25:27 AM | Tierra, Inc. |
7/18/2023 10:41:39 AM | HDR |
7/19/2023 2:28:46 PM | Oglesby Construction Inc. |
7/19/2023 3:53:50 PM | Vecellio & Grogan, Inc. |
7/25/2023 10:49:31 AM | UES |
8/11/2023 10:23:52 AM | PSI |
10/1/2023 10:22:27 AM | DRMP |
10/16/2023 4:21:57 PM | VHB |
11/7/2023 9:44:14 AM | Selective Construction |
11/14/2023 3:45:08 PM | Nadic Engineering Services, Inc. |
2/12/2024 8:19:55 AM | PWXPress |
3/20/2024 8:45:47 AM | MRM Construction LLC |
5/30/2024 3:08:24 PM | SACYR |
8/31/2024 3:58:47 AM | Deltek |
10/14/2024 11:25:15 AM | Ardurra Group, Inc. |
11/15/2024 3:49:28 PM | Protean Design Group, Inc. |
Addition 1
Posted: 1/18/2022
Type of Addition: Public Notices
Overview: 001883 Prebid Meeting Notice 1-25-2022
Documents:
Addition 2
Posted: 1/25/2022
Type of Addition: Public Notice
Overview: Pre-Bid Meeting Sign-In Sheet 001883
Documents:
Addition 3
Posted: 2/11/2022
Type of Addition: Addendum No. 1
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated January 2022, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 3 pages and the following attachments: Revised Plansheets and the Fuel Adjustment Sheet. The following eight (8) pdf reference documents are being provided separately: 528-160 Drainage Design Report Final; 528-160 Geotech Report Final; 528-160 Lighting Design Analysis Report Final; 528-160 MiscStructureDesignCalcs Final; 528-160 MiscStructureDesignCalcs Variance Report Final; 528-160 Pavement Design Summary; 528-160 Project Roll Plot; and 528-160 Roadway Design Report.
Solicitation #: 001883
Documents:
Addition 4
Posted: 2/18/2022
Type of Addition: Bid Opening Minutes 001883
Overview:
Documents:
Addition 5
Posted: 3/10/2022
Type of Addition: Bid Tabulation 001883
Overview:
Documents:
Addition 6
Posted: 3/10/2022
Type of Addition: Award Information 001883
Overview: On March 10, 2022 the CFX Board members awarded the Contract to the following firm, contingent upon final execution of the contract by both parties: Ranger Construction Industries, Inc., 1200 Elboc Way, Winter Garden, Florida 34787
Amount: $15,844,749.27
Documents:
Posted: 1/18/2022
Type of Addition: Public Notices
Overview: 001883 Prebid Meeting Notice 1-25-2022
Documents:
Posted: 1/25/2022
Type of Addition: Public Notice
Overview: Pre-Bid Meeting Sign-In Sheet 001883
Documents:
Posted: 2/11/2022
Type of Addition: Addendum No. 1
Overview: This Addendum forms a part of the Contract Documents and modifies the original bidding documents dated January 2022, as noted below. Acknowledge receipt of this Addendum in the space provided on the Proposal form. Failure to do so may subject the bidder to disqualification. This Addendum consists of 3 pages and the following attachments: Revised Plansheets and the Fuel Adjustment Sheet. The following eight (8) pdf reference documents are being provided separately: 528-160 Drainage Design Report Final; 528-160 Geotech Report Final; 528-160 Lighting Design Analysis Report Final; 528-160 MiscStructureDesignCalcs Final; 528-160 MiscStructureDesignCalcs Variance Report Final; 528-160 Pavement Design Summary; 528-160 Project Roll Plot; and 528-160 Roadway Design Report.
Solicitation #: 001883
Documents:
Posted: 2/18/2022
Type of Addition: Bid Opening Minutes 001883
Overview:
Documents:
Posted: 3/10/2022
Type of Addition: Bid Tabulation 001883
Overview:
Documents:
Posted: 3/10/2022
Type of Addition: Award Information 001883
Overview: On March 10, 2022 the CFX Board members awarded the Contract to the following firm, contingent upon final execution of the contract by both parties: Ranger Construction Industries, Inc., 1200 Elboc Way, Winter Garden, Florida 34787
Amount: $15,844,749.27
Documents: