Description: Repair areas washed out between existing storm crossings and manholes; Some areas will be to establish grass at the existing manholes as outlined in each proposal item below.
Documents:
Documents as of 1/10/2025 |
---|
RFP_2025_0110_CIP_Manhole_Repair_Less_50K.pdf |
Addition 1
Posted: 1/10/2025
Type of Addition: Addendum
Overview: To schedule a site visit please contact CJ Locklear at 936-522-3138.
Addition 2
Posted: 1/23/2025
Type of Addition: Addendum 01- Extend the Receive Date to January 30
Overview: Extend the bid opening to January 30, 2025 at 2:00 pm.
Deadline: 1/30/2025 2:00 PM
Addition 3
Posted: 1/30/2025
Type of Addition: Addendum
Overview: Extend the bid opening to February 6, 2025. The time remains the same.
Deadline: 2/6/2025 2:00 PM
Addition 4
Posted: 2/4/2025
Type of Addition: Addendum
Overview: Extend the Bid Opening to 2/13/25 at 2:00 pm. The location remains the same.
Deadline: 2/13/2025 2:00 PM
Addition 5
Posted: 2/5/2025
Type of Addition: Addendum
Overview: Manhole Detail Attached and Stewart Creek Manhole Pad Repair
Deadline: 2/13/2025 2:00 PM
Documents:
Question 1
Posted: 1/17/2025
Question: 1) May we have the relevant construction drawing sheet(s) that specifically identifies locations of the eight (8) manholes? (City Engineer used a copy of this on our site walk with mark ups showing actual locations) 2) On pay item 2 (Embankment and Ditch Protection), we recommend an additional measure of structural integrity be added to the work scope; the inclusion of Rip Rap to aid in strength of the existing embankment and significant erosion reduction. Could the city provide a specification of the rip rap (depth/size) if this option would be considered? 3) The area in which many of the manhole backfill activity will be occurring, is located in a nature preserve. Are there any special permissions/notifications that we would be responsible for in executing the work in that area?
Response: 1)Alternative item to cement stabilized sand for Bid Item 2- Provide Txdot 432 Stone Riprap (18”x24” buried a minimum 6” placed on filter fiber ) 2)No special permission is needed to enter the preservation area. We will work within the easement. Add: Broadcast seasonal seeding (per Txdot) to the areas disturbed during operations, outside site locations.
Posted: 1/10/2025
Type of Addition: Addendum
Overview: To schedule a site visit please contact CJ Locklear at 936-522-3138.
Posted: 1/23/2025
Type of Addition: Addendum 01- Extend the Receive Date to January 30
Overview: Extend the bid opening to January 30, 2025 at 2:00 pm.
Deadline: 1/30/2025 2:00 PM
Posted: 1/30/2025
Type of Addition: Addendum
Overview: Extend the bid opening to February 6, 2025. The time remains the same.
Deadline: 2/6/2025 2:00 PM
Posted: 2/4/2025
Type of Addition: Addendum
Overview: Extend the Bid Opening to 2/13/25 at 2:00 pm. The location remains the same.
Deadline: 2/13/2025 2:00 PM
Posted: 2/5/2025
Type of Addition: Addendum
Overview: Manhole Detail Attached and Stewart Creek Manhole Pad Repair
Deadline: 2/13/2025 2:00 PM
Documents:
Posted: 1/17/2025
Question: 1) May we have the relevant construction drawing sheet(s) that specifically identifies locations of the eight (8) manholes? (City Engineer used a copy of this on our site walk with mark ups showing actual locations) 2) On pay item 2 (Embankment and Ditch Protection), we recommend an additional measure of structural integrity be added to the work scope; the inclusion of Rip Rap to aid in strength of the existing embankment and significant erosion reduction. Could the city provide a specification of the rip rap (depth/size) if this option would be considered? 3) The area in which many of the manhole backfill activity will be occurring, is located in a nature preserve. Are there any special permissions/notifications that we would be responsible for in executing the work in that area?
Response: 1)Alternative item to cement stabilized sand for Bid Item 2- Provide Txdot 432 Stone Riprap (18”x24” buried a minimum 6” placed on filter fiber ) 2)No special permission is needed to enter the preservation area. We will work within the easement. Add: Broadcast seasonal seeding (per Txdot) to the areas disturbed during operations, outside site locations.