St. Johns River Water Management District Sealed Solicitation

Title: S-161A Drum and Cable Conversion

Deadline: 10/3/2019 2:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: In Review

Solicitation Number: 34822

Description:

Contractor shall provide all materials, labor, and equipment necessary for the replacement of the hydraulic lift system(s) as described in this statement of work and as shown in the Contract Drawing and Specifications. Generally, the scope shall include fabrication of a new drum and cable wench system(s), removal of existing hydraulic lift system(s), installation of new drum and cable system(s) including all electrical and mechanical components to complete a fully operational lift system.

 

 

The engineer's construction estimate for the project is $392,000.00.


Pre-Bid Meeting Date: 9/5/2019 10:00 AM

Pre-Bid Meeting Details: A Non-Mandatory Pre-Bid Conference is scheduled for September 5, 2019, at 10:00 a.m., at US 192 at entrance to L-73. The purpose of the pre-bid conference is to clarify requirements of this solicitation. Location is 14 Miles West of the 192 Exit of I95 on the south side of 192 Coming from the West, Site is 20 miles east of St. Cloud


Documents:

Documents as of 8/20/2019
IFB_34822_S161A Drum and Cable Conversion.pdf
Spec 161A Cable Drum Hoist.pdf
Spec 09900 Protective Coatings.pdf
Drawing S-161A Drum and Cable.pdf
Drawings S161A Drum and Cable.pdf
Drawings S161-A Rehab asbuilts.pdf
Addition 1

Posted: 10/4/2019

Type of Addition: In Review

Documents:

Posted: 10/4/2019

Type of Addition: In Review

Documents: