Title: Gopher Tortoise Exclusion Fence Phase II

Deadline: 12/6/2018 3:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Quote Number: 33907

Description:

The St. Johns River Water Management District (District) desires to to install approximately 1.6 miles of exclusion fencing along the L73, Section 2B western toe of slope from S161 to a gated access (see Site Plan for location detail) and from S161 north for approximately 0.3 miles for a total installation length of approximately 1.9 miles.    The fence will be installed according to FWC specifications to prevent gopher tortoises from repopulating the project area.


Products:
  • Soil Erosion Sheeting Material, Including Silt Fencing: Asphalt, Biodegradable Paper, Burlap, Excelsior, Jute, Straw, Etc.
  • Fencing, Chain Link, Including Fabric, Gates, Panels, Posts And Fittings
  • Fence Installation, Maintenance And Repair
Documents:
Addition 1

Name: Non-Mandatory Site Visit

Overview:

Thursday November 15, 2018 at 10:30AM

We will meet at US192 and L73 Levee which is 16 miles W of I95 on US 192 and 10 miles east of Holopaw
 

Posted: 11/7/2018

Addition 2

Name: Addendum 1

Overview:

Posted: 11/16/2018

Documents:
Addition 3

Name: Pre-bid meeting sign in sheet

Overview:

Posted: 11/16/2018

Documents:
Addition 4

Name: Addendum 2

Overview:

Posted: 11/27/2018

Documents:
Addition 5

Name: Addendum 3

Overview:

Posted: 11/28/2018

Documents:
Addition 6

Name: Notice of Intended Decision

Posted: 12/10/2018

Amount: $28,500.00

Documents:
Addition 7

Name: Notice of Intended Decision

Overview:

Posted: 12/10/2018

Documents:
Addition 1

Name: Non-Mandatory Site Visit

Overview:

Thursday November 15, 2018 at 10:30AM

We will meet at US192 and L73 Levee which is 16 miles W of I95 on US 192 and 10 miles east of Holopaw
 

Posted: 11/7/2018

Addition 2

Name: Addendum 1

Overview:

Posted: 11/16/2018

Documents:
Addition 3

Name: Pre-bid meeting sign in sheet

Overview:

Posted: 11/16/2018

Documents:
Addition 4

Name: Addendum 2

Overview:

Posted: 11/27/2018

Documents:
Addition 5

Name: Addendum 3

Overview:

Posted: 11/28/2018

Documents:
Addition 6

Name: Notice of Intended Decision

Posted: 12/10/2018

Amount: $28,500.00

Documents:
Addition 7

Name: Notice of Intended Decision

Overview:

Posted: 12/10/2018

Documents: