Title: Lab Services Quote ECWQL-1901

Deadline: 1/21/2019 5:00 PM   (UTC-06:00) Central Time (US & Canada)

Status: Deadline Expired

Quote Number: ECWQL-1901

Description:

The Escambia County Water Quality Laboratory (ECWQL) is located at 3363 West Park Place in Pensacola, Florida. The EQWQL is in need of certified laboratory testing to support the solid waste monitoring program.  The ECWQL requires a Florida certified lab that operates Monday through Friday, 8:00 AM- 5:00 PM plus has the ability to respond to emergency calls within one hour from request by the ECWQL. The scope of this work will be awarded to one lab and will not split between labs other than as a back-up lab. This quote is for analytical testing only. Note: For line items that are a calculation only of multiple methods, please put the cost for that calculation or $0.00 if there is no extra charge for a calculation. The analytical testing cost will already be captured for the individual methods.


Products:
  • Soil, Soil Vapor And Groundwater Sampling And Analysis, Including Disposal
  • Laboratory And Field Testing Services, Including Hazardous Waste, (Not Otherwise Classified)
Documents:
Addition 1

Name: Clarification

Overview: The Escambia County solid waste permits no longer require testing for fecal coliform by membrane filtration or for Chlorophyll-a. The Escambia County Water Quality Lab would like to have single sample pricing for these parameters in case of a permit modification or the need of a backup lab but a zero ($0.00) can be put in the total column (ignore the quantity as it should be 0) and will not be counted in the final total of the quote.

Posted: 1/8/2019

Addition 1

Name: Clarification

Overview: The Escambia County solid waste permits no longer require testing for fecal coliform by membrane filtration or for Chlorophyll-a. The Escambia County Water Quality Lab would like to have single sample pricing for these parameters in case of a permit modification or the need of a backup lab but a zero ($0.00) can be put in the total column (ignore the quantity as it should be 0) and will not be counted in the final total of the quote.

Posted: 1/8/2019