Title: RFQ - Engineering Design Services – 2019 Major Waterline Replacement Projects – Phase 2

Deadline: 11/21/2018 4:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Quote Number: 2018-Q3

Description:

Project Description

Project Name:  Perry – Tusc – Woodlawn Water Main Replacement Project – Phase 1– (TAG 586A)


·         It will involve replacement of approximately 5,520 lf of 12” waterline and 1,900 lf of 8” waterline along with the installation of valves, hydrants, and reconnection to the existing water distribution network.

·         It is anticipated that the waterline along Tuscarwas St. will need to be within waterline easements.  In your firms SOQ, list the resources you have available to develop and acquire the required easements.

·         Construction is planned for 2020.


Products:
  • Construction, Water System, Plants, Main And Service Line
  • Maintenance And Repair, Water System, Main And Service Line
  • Engineering Consulting (Inactive, Please See Commodity Code 907-40 Effective January 1, 2016)
  • Civil Engineering
  • Municipal Engineering
  • Water Supply, Treatment, And Distribution Engineering
  • Water And Wastewater Conservation Services
  • Water Supply And Sewage Treatment Equipment Maintenance And Repair
  • Utility Services, Water
Documents:
Addition 1

Name: Arcadis US, Inc.

Overview: Phase I-$343,300.00 Phase II-$128,700.00

Posted: 4/1/2019

Addition 1

Name: Arcadis US, Inc.

Overview: Phase I-$343,300.00 Phase II-$128,700.00

Posted: 4/1/2019