Title: Wastewater Lagoon Liner Replacement

Deadline: 7/17/2018 5:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Deadline Expired

Quote Number: 2019-07-10-1

Description:

Request for Proposals
For
Camden County Public Works Department
July 10, 2018
Advertisement and Notice of Invitation
Request for Proposal Available:
Request for Proposal, including response submittal requirements for:
South Mills Reclaimed Water Storage Lagoon Liner Replacement & Renovation Project
The County of Camden, North Carolina is seeking proposals from qualified contractors to complete the replacement
and renovation of the lagoon liner at the 5.9 MGD Reclaimed Water Irrigation Lagoon Facility located along
McPherson Road in South Mills, Camden County, North Carolina. The liner shall be a 60 mil black textured HDPE
liner with a minimum material warranty of 20 years.
The lagoon is the destination for treated effluent from the Wastewater Treatment Plant located in South Mills,
Camden County, North Carolina. Treated effluent is held in the lagoon until it is sent out to irrigate several vegetated
disposal areas. The lagoon has no infiltration capabilities and is lined with a 6” thick clay layer that runs from the
top of the containment berm slope and across the floor of the lagoon. The subject liner is a slope liner used to
stabilize the slopes of the containment berm. The installation of the original liner was completed in January 2008.
The liner is toed in across the top of the containment berm and runs down the slope to the lagoon bottom. The
lagoon is trapezoidal in shape with a perimeter of approximately 1750 linear feet. The storage volume of the lagoon
is approximately 5.9 million gallons. The lagoon is in active use. In early 2018 a tear occurred in the liner. It has
been determined that the liner has reached its life expectancy.
The purpose of this Request for Proposals is to select an appropriate contractor to remove the existing liner, renovate
the containment berm and replace the entire liner with a new liner. The work will need to commence no later than September
2018 and be completed within 30-45 days of the project start date.
EVERIFY & HUB CERTIFICATIONS REQUIRED.


Products:
  • Site Work
  • Construction And Upgrades, Wastewater Treatment Plant
  • Maintenance And Repair, Wastewater Treatment Plant
  • Water And Wastewater Conservation Services
  • Water And Wastewater Treatment Services
  • Erosion Control Services
Documents: