Quote Request: Public Utilities RFQ for Water Supply Improvements

Deadline: 8/1/2018 4:00 PM (Eastern Standard Time)

Status: Deadline Expired

Description: County of Davie and the Town of Mocksville wish to Commission an Engineering Feasibility Study to consider two possible water supply scenarios and provide recommendations based on an analysis of 20-year life cycle.


Products:
  • C.I.P., Utilities
  • Construction, Utility/Underground Projects
  • Engineering Consulting
  • Feasibility Studies (Consulting)
  • Environmental Engineering
  • Geotechnical Engineering
  • Hazardous Waste Engineering Services (Incl. Remedial Investigations And Feasibility Studies For Waste Sites)
Documents: