Title: Hilton Head Island Airport Entry Enhancements

Deadline: 8/27/2019 3:00 PM   (UTC-05:00) Eastern Time (US & Canada)

Status: Awarded

Solicitation Number: IFB 082719

Description: The scope of work consists of but not limited to the following: New monument entrance sign; entrance drives paving and curbing; sidewalk and crosswalk; sculpture base installation and sculpture placement; roadway striping; raised metal planter walls; landscaping, including plants, irrigation and landscape lighting; traffic and informational signs; relocation of Palmetto Electric street light; and associated selective tree removals, bush hogging, site grading and storm water detention swales.  


Pre-Bid Meeting Date: 8/8/2019 2:00 PM

Pre-Bid Meeting Details: A Mandatory pre-bid conference will be held on Thursday, August 8, 2019, at 2:00 p.m., in the Finance Conference Room located at 106 Industrial Village Road, Building 2, Beaufort, SC 29906. Bidders are responsible for their own transportation. All interested bidders must attend the meeting.


Documents:

Documents as of 7/24/2019
Login to view documents
Login to view documents
Addition 1

Posted: 8/8/2019

Type of Addition: Sign in Sheet

Pre-Bid Meeting Date: 8/8/2019 2:00 PM

Documents:

Addition 2

Posted: 8/12/2019

Type of Addition: Addendum 1

Overview:

Program Provisions and Good Faith Outreach Effort Requirements for Small and Minority Business Participation

Documents:

Addition 3

Posted: 8/20/2019

Type of Addition: Answers to Questions

Overview:

Question # 1 – Please confirm the Architect wants the letters to be reverse channel (which means they would be illuminated by their description).  If they were fabricated metal that would indicate non-illuminated.  The issue I see with them being illuminated on the solid concrete wall is that there is nowhere to do the wiring other than a large reflection panel.

Letters to be reverse channel and illuminated. Wall is cmu block where conduit is to be used to provide power.

Question # 2 – The plans call for fabricated metal (which are non-illuminated).  Should we assume they are not illuminated?

See above.

Question # 3 – Will nighttime work be allowed? If so please specify what activities would be prohibited.

Nighttime work allowed. Low noise activities allowed.

Question # 4 – It will be difficult to keep the existing entrance open to traffic during the construction period and still maintain worker and public safety. Will we be allowed to cut in a new temporary entrance roadway as required to facilitate traffic?

Yes, as long as temporary road does not require additional tree removals; does not pass over trees to remain rootzones; does not impact proposed storm water management facilities; permittable by town, county and state agencies; or is outside the limits of work. Areas impacted to be completely removed and does not impact finished work.

End of Questions

Addition 4

Posted: 8/27/2019

Type of Addition: UPDATED Preliminary Bid Tab

Overview:

Documents:

Addition 5

Posted: 10/29/2019

Type of Addition: In Review

Overview:

Addition 6

Posted: 6/17/2020

Type of Addition: Award Information

Overview: Hilton Head Island Airport Entry Enhancements Award

Amount: $281,783.00

Documents:

Question 1

Posted: 8/1/2019

Question: On page 2 of the Invitation to Bid it states that Appendix A and Appendix E are attached. They were not attached. Could you please provide. Also on page 11 it states that Pages 1 - 9 and page 27 and all SBE requirements are to be returned with the Bid. Page 27 talks about Performance & Labor Bond and Contractual Requirements - there is no form. Is it missing?

Response: These are to be provided by the bidder upon submission of bid. Page 27 "State whether or not your company has been involved in any litigation within the past five (5) years, arising out of your performance by circling YES OR NO. If you circled “YES”, explain fully in a separate attachment.

Question 2

Posted: 8/1/2019

Question: A Bid Bond Form was not provided. Can we use one provided by the Surety?

Response: yes

Posted: 8/8/2019

Type of Addition: Sign in Sheet

Pre-Bid Meeting Date: 8/8/2019 2:00 PM

Documents:

Posted: 8/12/2019

Type of Addition: Addendum 1

Overview:

Program Provisions and Good Faith Outreach Effort Requirements for Small and Minority Business Participation

Documents:

Posted: 8/20/2019

Type of Addition: Answers to Questions

Overview:

Question # 1 – Please confirm the Architect wants the letters to be reverse channel (which means they would be illuminated by their description).  If they were fabricated metal that would indicate non-illuminated.  The issue I see with them being illuminated on the solid concrete wall is that there is nowhere to do the wiring other than a large reflection panel.

Letters to be reverse channel and illuminated. Wall is cmu block where conduit is to be used to provide power.

Question # 2 – The plans call for fabricated metal (which are non-illuminated).  Should we assume they are not illuminated?

See above.

Question # 3 – Will nighttime work be allowed? If so please specify what activities would be prohibited.

Nighttime work allowed. Low noise activities allowed.

Question # 4 – It will be difficult to keep the existing entrance open to traffic during the construction period and still maintain worker and public safety. Will we be allowed to cut in a new temporary entrance roadway as required to facilitate traffic?

Yes, as long as temporary road does not require additional tree removals; does not pass over trees to remain rootzones; does not impact proposed storm water management facilities; permittable by town, county and state agencies; or is outside the limits of work. Areas impacted to be completely removed and does not impact finished work.

End of Questions

Posted: 8/27/2019

Type of Addition: UPDATED Preliminary Bid Tab

Overview:

Documents:

Posted: 10/29/2019

Type of Addition: In Review

Overview:

Posted: 6/17/2020

Type of Addition: Award Information

Overview: Hilton Head Island Airport Entry Enhancements Award

Amount: $281,783.00

Documents:

Posted: 8/1/2019

Question: On page 2 of the Invitation to Bid it states that Appendix A and Appendix E are attached. They were not attached. Could you please provide. Also on page 11 it states that Pages 1 - 9 and page 27 and all SBE requirements are to be returned with the Bid. Page 27 talks about Performance & Labor Bond and Contractual Requirements - there is no form. Is it missing?

Response: These are to be provided by the bidder upon submission of bid. Page 27 "State whether or not your company has been involved in any litigation within the past five (5) years, arising out of your performance by circling YES OR NO. If you circled “YES”, explain fully in a separate attachment.

Posted: 8/1/2019

Question: A Bid Bond Form was not provided. Can we use one provided by the Surety?

Response: yes